Ontario Electricity League - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Ontario Electricity League

Description:

The Coalition of Large Distributors (CLD) is a group of 6 of ... Watt Reader Library Loaner Program. Cool Shops. Hot water tune-up program. RAC Removal program ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 14
Provided by: den899
Category:

less

Transcript and Presenter's Notes

Title: Ontario Electricity League


1
Ontario Electricity League
  • Conservation Initiatives
  • April 27, 2005

2
Ontarios Supply vs. Demand Challenge
?
Source Ontario Ministry of Energy -
Electricity Conservation and Supply Task Force
Report - 2004
3
Coalition of Large Distributors
  • The Coalition of Large Distributors (CLD) is a
    group of 6 of the largest municipally owned
    electrical utilities in Ontario
  • Collectively we serve 1.7 Million customers (40
    of the province)
  • The CLD is collaboratively working on
  • Electricity Conservation and Demand Management
    (CDM)
  • Smart Metering

4
One Common Brand
www.powerwise.ca
5
CLD Agents of Change
  • 6 coordinated CDM plans approved by the OEB on
    Dec 10th, 2004
  • 74M to be spent by Sept 30th, 2007
  • Toronto Hydro 39.8M
  • Hydro Ottawa 9.3M
  • Enersource 8.3M
  • Horizon Utilities 7.2M
  • PowerStream 6.4M
  • Veridian 3.5M
  • Total 74.5M

6
Sample CDM Programs from 2005
  • Residential Small Commercial (lt50kW)
  • Co-branded Mass Market
  • Smart Meter Pilots
  • Design Advisory
  • Residential Load Control
  • Energy Audit Incentives
  • Fridge Bounty
  • Electric Avenue
  • Social Housing
  • Commercial, Industrial, Institutional (gt50kW)
  • Smart Meter Pilot
  • LED Traffic Lights
  • Business Incentive Program
  • Load Control
  • On-the-Bill Financing
  • Design Advisory
  • Grid Improvements
  • Distribution Loss Reduction
  • Distributed Energy
  • Load Displacement from Stand-by Generation

7
Residential Commercial Programs for 2006
  • Co-branded Mass Market
  • Smart Meter Pilots
  • School Initiatives
  • Energy Audit Incentives
  • Fridge Bounty
  • Residential Load Control
  • PeakSAVER
  • Central A/C Programs
  • Business Incentive Program
  • Watt Reader Library Loaner Program
  • Cool Shops
  • Hot water tune-up program
  • RAC Removal program
  • Ban the T-12
  • 80 Plus
  • Energy Conservation Conference
  • Fall Retail Program
  • Design Advisory
  • Project Porchlight

8
powerWISE Business Incentive Program
  • Commercial Industrial and Institutional Customers
    gt 50 kW
  • Incentive Opportunity
  • Up to 50,000 for projects that reduce kWs of
    demand
  • Prescriptive and custom options available
  • Minimum requirement -- 10kW reduction for custom
    projects
  • Can leverage other programs (i.e. NRCan)
  • Terms and conditions apply
  • Funding is limited
  • Programs to be complete by June 30, 2007

9
Achieving kW savings
  • Replacing
  • Inefficient existing equipment with new high
    efficiency equipment
  • Oversized existing equipment with new
    right-sized efficient equipment
  • Installation of
  • New high efficiency equipment in a new
    installation
  • Implementing
  • New energy and process management technologies
    that result in sustained savings

10
Project Types
  • Prescriptive Projects
  • Where rebates are offered for predefined
    technologies on a per unit basis.
  • High and Premium Efficiency Fluorescent T8
    Lighting Fixtures and Energy Star LED Exit Signs
  • 3-phase Premium Efficiency Motors up to 200 hp
  • Energy Star compliant 3-phase Transformers
  • Energy Star compliant Unitary Air-Conditioning
    up to 20 tons in size
  • Custom Projects
  • Technology, equipment and systems are evaluated
    on the basis of their energy performance
    improvement

11
Business Incentive Example
  • Facility Large Commercial Building
  • Project Lighting Retrofit
  • Savings 149kW (685,000 kWhs/year)
  • Cost 260.0K 4 Year Payback
  • PBIP 32.7K Incentive
  • Net 227.3K 3.5 Year Payback

Note Other programs can be leveraged to
further reduce payback period
12
Moving Forward
  • The Hydro utility companies are committed to long
    term sustainable energy conservation in the
    province of Ontario
  • As Agents of Change we will continue to
    leverage relationships with industry, government,
    customers, retail and not-for-profit groups
  • Continue to roll out innovative CDM projects and
    programs for the benefit of our customers

13
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com