Testing and your Y2K Project - PowerPoint PPT Presentation

1 / 93
About This Presentation
Title:

Testing and your Y2K Project

Description:

Module testing is nearly always done by the developers themselves, before the ... Module Testing is sometimes called Unit Testing representing the lowest level ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 94
Provided by: kelvi9
Category:
Tags: y2k | module | project | testing

less

Transcript and Presenter's Notes

Title: Testing and your Y2K Project


1
Module/Unit Tests
Dr Steven Butler K. J. Ross Associates Pty.
Ltd. PO Box 131, West Burleigh, 4219 Ph 07 5522
5131 Fax 07 5522 5232 admin_at_kjross.com.au http/
/www.kjross.com.au
2
Overview
  • Integration Levels
  • Module / Unit Testing
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

3
Overview
  • Module / Unit Testing
  • Integration Levels
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

4
Module (Unit) Testing
  • Module Testing is applied at the level of each
    module of the system under test.
  • Module testing is nearly always done by the
    developers themselves, before the module is
    handed over for integration with other modules.
  • Usually the testing at this level is structural
    (white-box) testing.
  • Module Testing is sometimes called Unit Testing
    representing the lowest level item available for
    testing.

5
Module Testing Questions
  • Has the component interface been fully tested?
  • Have local data structured been exercised at
    their boundaries?
  • Have all independent basis paths been tested?
  • Have all loops been tested appropriately?
  • Have data flow paths been tested?
  • Have all error handling paths been tested?

6
White Box Module Testing
  • The goal is to extensively test the code with a
    view to exposing and fixing bugs prior to
    integration with others work.
  • Finds lurking bugs that are very hard to find
    cost-effectively during integration or functional
    testing
  • Tools are essential to get test coverage data
  • REMEMBER Caution is required
  • you must have a specification against which to
    test
  • without a spec, you are simply testing that the
    code does what you think it does (but is it doing
    the RIGHT thing?)

7
Module Test Technique
  • The module under test is usually treated as a
    white box however a grey box is more
    appropriate
  • 1. Systematic test design techniques are applied
    to the specification of the module
  • 2. The module is tested
  • 3. If any tests fail the module is debugged and
    the process is repeated from step 2
  • 4. Test coverage is evaluated if coverage
    criteria is met then the module is considered
    verified otherwise the process is repeated from
    step 1
  • knowledge of the algorithms in use can help find
    new test cases when coverage is too low

8
Module Test Approaches
  • Ad-hoc
  • Checklist
  • Automated
  • Planned

9
Adhoc Approach
  • Usually the task of the implementing developer
  • Ad-hoc approach random testing before the
    modules are handed over for integration
  • Pros
  • quick (sometimes very quick)
  • Cons
  • Difficult to quantify how well the code was
    tested before integration
  • Bugs slip through to later testing where they are
    much more difficult (and costly) to find and fix
  • Less likely that the developer will design
    testable code

10
Checklist Approach
  • A module test checklist is the set of abbreviated
    test cases used by a developer to ensure thorough
    testing of their module.
  • Called a checklist because it usually lists
    inputs and expected results and has a checkbox to
    indicate the result of executing the test
  • may not be applicable if tests are automated
    although the automated test may have its origins
    in a test checklist

11
Checklist Approach
  • Checklists are more suitable for developer
    testing than standard test plans because
  • they minimise the amount of work required of a
    developer to prepare a repeatable set of test
    cases
  • a developer does not require detailed test
    instructions because they already know how to
    apply a test to their own code
  • YOU try getting a developer to write an IEEE 829
    compliant test plan!

12
Example Test ChecklistsModule Specific
  • class IntSet
  • ...
  • void add(int i) // contains(i) gt exception
    otherwise adds i
  • void remove(int i) // !contains(i) gt
    exception otherwise removes i
  • bool contains(int i) // returns true iff i
    is contained in the set
  • ...

13
Example Test ChecklistsGeneric 1
  • Myers 1979
  • Is the number of input parameters equal to number
    of arguments?
  • Do parameter and argument attributes match?
  • Do parameter and argument units system match?
  • Is the number of arguments transmitted to called
    modules equal to number of parameters?
  • Are the attributes of arguments transmitted to
    called modules equal to attributes of parameters?
  • Is the units system of arguments transmitted to
    called modules equal to units system of
    parameters?
  • Are the number of attributes and the order of
    arguments to built-in functions correct?
  • Are any references to parameters not associated
    with current point of entry?
  • Have input only arguments altered?
  • Are global variable definitions consistent across
    modules?
  • Are constraints passed as arguments?
  • When a module performs external I/O, additional
    interface tests must be conducted.

14
Example Test ChecklistsGeneric 2
15
Automated Approach
  • Tests are automated through building harnesses
    and stubs
  • Pros
  • Tests can be repeated quickly and efficiently as
    minor changes are made during development
  • No need to select specific test cases to save
    time during regression testing
  • Cons
  • has high up front cost, and may be costly to
    maintain if the test code is badly designed
  • automation is difficult when testing a system
    with spaghetti dependencies

16
Planned Approach
  • Developer plans to test systematically from the
    beginning.
  • The plan may involve testing incrementally as
    classes are constructed, or to do testing once
    most or all of the classes are complete
  • When complete, release the module and its test
    code for integration with the system

17
Planned Approach
  • Pros
  • tests are documented and can be reviewed and
    reproduced
  • automated tests reduce the expense of regression
    tests
  • a systematic approach means many more bugs are
    found early in the development process where they
    are least expensive to fix
  • Cons
  • Amount of test code (i.e. test harness and stubs)
    often outweighs the real module code (i.e. lots
    more work)
  • Changes to released software will usually require
    updates to the test-suite

18
Planned Approach
  • Test planning happens during the modules design
    and implementation
  • design for testability
  • a checklist of things to test is collated
    during design and implementation
  • a peer or team leader may review the checklist
    for suitability and suggest other things to test
  • ideally module tests are automated
  • reduce duplication by specifying test cases
    directly in code
  • important to ensure that the purpose of each test
    case is documented

19
Overview
  • Module / Unit Testing
  • Integration Levels
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

20
Integration Testing
  • A partial system level test can be conducted
    without waiting for all the components to be
    available
  • thus problems can be fixed before affecting
    downstream development on other components
  • Integration testing is also performed as some
    tests cannot be carried out on a fully integrated
    system
  • helps to focus testing to particular components
    and to isolate the problems that will be
    discovered
  • Integration Testing is an interim level of
    testing applied between module testing and system
    testing
  • tests the interaction and consistency of an
    integrated subsystem

21
Integration Testing
  • Integrate incrementally as components are
    assembled into larger subsystems
  • Bottom-up - assembles up from the lowest level
    components and replaces higher level components
    with test harnesses to drive the units under
    test.
  • Top-down assembles down from the highest level
    components replacing lower level components with
    test stubs to simulate interfaces
  • Inside-out - Mixture of both bottom-up and
    top-down
  • Big-bang - complete system integration in one hit
  • Collaboration - big bang all the components
    required to exercise a particular collaboration
  • High Frequency - frequent integration of small
    components, aim is to always have a system that
    builds and (to some extent) works

22
System Architecture
  • Often manydependencies

23
Bottom-Up Integration Test
  • Start at lowest level

24
Bottom-Up Integration Test
  • Work-Up

25
Bottom Up Integration
  • Bottom-up incremental integration of classes to
    form the module
  • Pros
  • incremental approach simplifies the task of
    locating errors when a new class fails a test
  • bottom up approach minimises test stubs
  • good test coverage is achievable on lowest level
    classes
  • Cons
  • hard to get good coverage in higher level control
    classes
  • must carefully plan the order in which classes
    are completed

26
Top-Down Integration Test
  • Start at highest level

27
Top-Down Integration Test
  • Work down

28
Inside-Out Integration Test
  • Any level

29
Top Down Testing
  • Top-down incremental integration of classes to
    form the module
  • Pros
  • incremental approach simplifies the task of
    locating errors when a new class fails a test
  • top down approach minimises test harnesses
  • good test coverage is achievable on highest level
    control classes
  • Cons
  • hard to get good coverage in lowest level
    (work-horse) classes
  • must carefully plan the order in which classes
    are completed

30
Big Bang Testing
  • Test module once all classes are complete
  • Pros
  • minimal overhead producing test stubs
  • a single test harness may be sufficient for all
    testing
  • more thorough testing than an ad-hoc approach
  • dont need to plan the order in which classes are
    completed
  • Cons
  • hard to get good coverage of any of the classes
  • more difficult to trace the location of a defect
    when a test fails
  • risky approach to integration

31
Integration ScenarioXML Application
32
Overview
  • Module / Unit Testing
  • Integration Levels
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

33
Integration Testing
  • test components for faults that cause
    inter-component failures
  • performed as a preliminary series of testing
    before system functional testing begins
  • reveal interoperability faults that would hamper
    system tests

34
Integration Testing
  • best performed in a controlled, staged manner
  • interfaces are progressively tested
  • new components and their interfaces are treated
    as suspect until proven stable against the
    growing stable core
  • low-level components such as classes with no
    interdependencies can be integrated in parallel

Typically, module testing involves much component
integration at the lowest levels.
35
Planning Integration
  • Incremental integration requires an analysis of
    the architectural dependencies of the system
  • if no architectural specification is available
    then integration will typically be a big bang
    (or more likely a big fizzle)
  • Integration planning should commence early in the
    life-cycle of the software
  • as integrator, plan to review the architectural
    design
  • create a first cut of the planned integration
    sequence based on the dependency analysis in the
    architectural design
  • use the insight gained to give feedback to the
    architect this will result in an overall better
    (and more testable) design

36
Integration Checklist
Following is a summary of things to keep in mind
when designing integration tests
  • Configuration/version control problems (interface
    changes)
  • Missing overlapping or conflicting functions
    (name space issues)
  • Incorrect or inconsistent data structures used
    for a file or database
  • Conflicting usage or view of a data structure
  • Violation of data integrity of a data structure
  • Calling the wrong method (typos/code
    error/dynamic binding)
  • Client calls server and violates its
    preconditions
  • Client calls modal server with out of sequence
    message (e.g. MFC assert triggered)
  • Call the wrong object (e.g. incorrect index into
    an array of objects)

37
Integration Checklist (cont.)
  • Wrong parameters, or incorrect parameter values
  • Memory management and memory ownership confusion
    (e.g. strings gained from strdup() must be
    deleted by the client)
  • Incorrect use of OS or VM services (e.g. call
    System.exit() in a java applet)
  • Use obsolete or non-implemented services (e.g.
    create a HashMap in version 1.1 JVM calling BSD
    functions in a SysV UNIX)
  • Inter-component conflicts (e.g. two components
    write simultaneously to the same UNIX pipe,
    causing interleaving of data)
  • Lack of resources / resource contention (e.g.
    lack of memory disks not fast enough to handle
    contention between two IO heavy processes)

38
Managing Integration
  • Configuration Management
  • You must know the component versions which make
    up the software under test
  • at the end of integration, an audit should be
    done to ensure that tested components match those
    that are released for system testing
  • Test Execution Management
  • testing is a service to project management that
    lets them know the quality of the software
  • without good information, management cannot
    determine when a product is suitable for release
  • as a tester, you must provide quantitative
    information to management

39
Preventative Measures
  • Many defects can be fixed early or prevented if
    the following precautions are taken
  • get testers involved early in review of
    architecture and design documents
  • make sure a peer review is done on modules before
    release to integration
  • many bugs that might slip through testing are
    found while explaining code to a reviewer
  • implementation knowledge is shared amongst
    developers
  • you always have the option to throw it away and
    start again if necessary
  • start integration as soon as the first modules
    are ready to be integrated - dont go for a big
    bang approach

40
Overview
  • Module / Unit Testing
  • Integration Levels
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Unit Test Frameworks

41
Test Harnesses
  • Supporting code and data used to provide an
    environment for testing components of your
    system.
  • Typically used during unit/module test
  • Typically created by the developer of the code
  • vary between simple user interfaces to allow
    tests to be conducted manually, through to fully
    automated execution of tests to provide
    repeatability when the code is modified.
  • Building test harnesses may account for 50 of
    the total code produced
  • valuable asset, and should be controlled in the
    same way the code is managed

42
Test Automation Techniques
  • code driven
  • test cases are embedded directly in the source
    code of the test harness
  • simple to get tests up and running
  • requires little effort for small unchanging
    modules
  • is not easily maintainable for large modules, or
    modules were tests are likely to be added a
    change frequently

43
Test Automation Techniques
  • data driven
  • the test harness does not contain any test cases
    instead it reads data from a file that defines
    the inputs and expected outputs of each test case
  • higher initial overhead in design of interpreter
    and data file formats
  • initial overhead is quickly recouped by the ease
    in adding new tests

44
Data Driven Test Harness
The test harness usually conforms to the
following structure
while data file is not empty read inputs and
outputs from data file call function with
inputs if results of function match expected
outputs register TC passed else register TC
failed end if end while output summary
45
Example - Harness
/ Test Harness this does all the work
/ main() int count 0 // count the no of
tests executed int fail 0 double
result / open the input script / while
( line readLine(inputFile) ! EOF ) if (
is_comment(line) ) continue count /
split line into testid,opposite,adjacent,expected
/ result calcHypotenuse ( opposite,
adjacent ) if ( result ! expected )
fail output(Test failed s( d, d
) got d expected d\n, testid,
opposite, adjacent, result, expected
)   / output the final stats
/ output(Tests run d\n, count) output(Tes
ts OK d\n, count-fail) output(Tests failed
d\n, fail)
/ Calculate the hypotenuse of a right angle
/ / triangle . nOpposite and nAdjacent must
values / / be non negative . Return the
hypotenuse or 1 / / for invalid input
/ double calcHypotenuse ( double
nOpposite, double nAdjacent ) if ( nOpposite
lt 0 or nAdjacent lt 0 ) return 1 return (
sqrt(pow(nOpposite,2) pow(nAdjacent,2)) )  
46
Example - Harness Run
  • Sample Input Data
  • Sample Output

format testid,opposite,adjacent,expected Test1,
3,4,5 Test2,3,4,6 just to try and force a
failure Test3,-3,4,-1 Test4,4,-1,-1 Test5,0,4,4
Test failed Test2( 3, 4 ) got 5 expected 6
Tests run 5 Tests OK 4 Tests failed 1
47
Test Stubs
  • dummy components that stand in for unfinished
    components during unit/module testing and
    integration testing.
  • quite often code routines that have no or limited
    internal processing
  • may always return a specific value
  • request value from user
  • read value from test data file
  • simulators may be used as test stubs to mimic
    other interfaced systems

48
Test Stubs
  • Sometimes code for a low level module is modified
    to provide specific control
  • E.g. a file I/O driver module may be modified to
    inject file I/O errors at specific times, and
    thus enable the error handing of I/O errors to be
    analysed

49
Example - Stub
  • Same result for each call

enum Method GET, POST struct response int
code String content String header /
static stub commonly used since predictable
results / response sendHttpRequest( String url,
Method getpost, String params) response
res res.code 200 / status OK
/ res.content lthtmlgtlttitlegtHellolt/titlegtltbody
gttestinglt/bodygtlt/htmlgt res.header
return res
50
Example - Stub
  • Lookup result from predefined lookup table or file

/ get value from global lookup table generated
from input script / response sendHttpRequest(
String url, Method getpost, String params)
response res / assume test input script
included data to populate lookup table / res
lookup(url) return res
51
Example - Stub
  • Conditional response (if file accessible)

/ get value from a file / response
sendHttpRequest( String url, Method getpost,
String params) response res / assume a file
has been opened and filehandle is accessible
/ if ( code readLine(filehandle) )
res.code code else res.code
400 / fail / if ( content
readLine(filehandle) ) res.content content
if ( header readLine(filehandle) )
res.header header return res
52
Example - Stub
  • Error injection using actual method
  • Uses mode (controlled by harness) to determine
    whether to inject error

/ get value from a file / response
sendHttpRequest( String url, Method getpost,
String params) response res / assume a file
has been opened and filehandle is accessible
/ if ( mode normal ) res
actual_sendHttpRequest(url, getpost, params)
else res.code 400 / fail / return
res
53
Coordinating Harnesses and Stubs
The data file may have fields indicating data
that should be returned by stubbed functions
during the test. The stubbed functions return
global variables that are set by the test harness
after reading the appropriate value from the test
file. For example, the daysInMonth function used
by checkDate is stubbed. It returns a
pre-determined value from the test harness data
file (shown in bold).
bool checkDate(int d, int m, int y) if ( y
lt 0 ) return false if ( m lt 1 m gt 12 )
return false if ( d lt 1 d gt
daysInMonth(m, isLeapYear(y)) ) return
false return true
TC013,4,199830T normal dateTC0229,2,199928
F not a leap yearTC0329,2,200029T leap
yearTC0429,2,210028F not a leap year
54
Coordinating Harnesses and Stubs (cont)
int daysInMonth (int month, bool leapYear)
return globalDaysInMonth int isLeapYear(int
y) return true / simple stub / while
(data remaining in file) read data line
into (TCID, (d, m, y), globalDaysInMonth,
Expected) if (checkDate(d,m,y) Expected)
register (TCID,pass) else
register (TCID,fail)
bool checkDate(int d, int m, int y) if ( y
lt 0 ) return false if ( m lt 1 m gt 12 )
return false if ( d lt 1 d gt
daysInMonth(m, isLeapYear(y)) ) return
false return true
TC013,4,199830T normal dateTC0229,2,199928
F not a leap yearTC0329,2,200029T leap
yearTC0429,2,210028F not a leap year
55
Overview
  • Module / Unit Testing
  • Integration Levels
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

56
Test Oracles
  • Capture and comparison of results is one key to
    successful software testing. Test oracles are an
    mechanism used to calculate the expected result
    of a test.
  • Test oracles are commonly the tester calculating
    or checking the result by hand.
  • If the test case output involves complex
    calculations, then programs may be written to
    compute or check the output.
  • Care must be taken to ensure that the same
    approach is not used for developing the test
    oracle as used in developing the system operation
    tested by the oracle, otherwise errors may remain
    undetected.
  • If different results are obtained for a test
    case, the tester must first determine whether the
    system under test is incorrect or whether the
    oracle is incorrect.

57
Test Oracles
  • Douglas Hoffman categorised a number of
    different alternatives for implementing oracles

58
Test Oracle Example
  • Function to compute sine

59
True Oracle
  • Select points on the X axis and calculate the
    sine at each point selected.
  • The calculation should be performed using an
    independent algorithm

60
Sampling Oracle
  • Select specific points on the X axis where the
    sine result is known without calculation.
  • For example, the outcome of the sine function is
    precisely known at 0, 90, 180, 270 and 360
    degrees.

61
Heuristic Oracle
  • Tester analyses the inputs and results of the
    sine function to determine if there are
    predictable relationships between them.
  • Provide a number of test cases using the sampling
    oracle approach above
  • The remainder of the tests would be based on
    consistency of inputs and results with the
    predicted relationships

62
Heuristic Oracle
  • Sampling oracle defined tests at 0, 90, 180, 270
    and 360 degrees.
  • Between 0 and 90 degrees, the result of sine(X)
    only increases as X increases. Similarly,
    between 90 and 180 degrees, sine(X) always
    decreases as X increases, and so on for 180 to
    270 and 270 to 360 degrees.

63
Heuristic Oracle
  • The heuristic oracle for sine is very simple as
    we need only check for increases and decreases
    depending on the range.
  • This example oracle will trap a number of
    different errors, e.g. dips, scale or
    discontinuity of the function.

64
Heuristic Oracle
  • Some kinds of errors may go undetected using a
    heuristic oracle.
  • For example, rounding errors, or constant change
    of the sine function may go undetected.

65
Heuristic Oracle Relationships
  • Look for simple predictable relationships between
    inputs and results that they can easily check.
  • Most complex algorithms contain simple
    relationships.
  • Selected ranges may be selected for the
    heuristic, but the heuristic must hold for all
    inputs and results within the range.
  • If there are exceptions it becomes more
    complicated to check whether the exceptions
    apply, and the advantages are lost.
  • It is best to define to groups, what we can know
    to expect, and what we can't determine
    separately.
  • The former are tested using a sampling oracle,
    and the latter using a heuristic oracle.

66
Looking for Patterns
  • When looking for patterns, consider reordering
    data.
  • For instance, two equivalent sets of elements can
    be sorted and compared to check that they contain
    matching items.
  • For example, where new database items are created
    using an ID that is the next increment, sorting
    the items by ID may reveal any breaks in the
    sequence to reveal missing items.

67
Looking for Patterns
  • Blocks of information can be represented by the
    starting value and count of elements.
  • Variations are possible by using fixed increments
    between values or using simple patterns for
    changing increments.
  • For example, to test packets of data transmitted
    over a network, packets can be randomly generated
    with varying lengths, and starting values, but
    fixed increments.
  • Simple to check the integrity of the received
    packet, by only understanding the packet start
    value, length and increment parameters
  • Not necessary to record the complete packet
    contents as an expected result.

68
Overview
  • Module / Unit Testing
  • Integration Levels
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

69
Module Testing OO Software
  • Module testing OO software offers more challenges
    than traditional software.
  • encapsulation
  • inheritance
  • dynamic dispatch
  • modal objects
  • templates

70
Encapsulation
  • Hides object state
  • difficult to establish pre-test conditions
  • difficult to to determine actual results which
    are expressed in terms of a state change
  • There are a few techniques to help
  • name a test harness class in a friend declaration
  • provide helper functions for establishing or
    testing state
  • test only the exported state (i.e. that which
    can be determined through the class interface)
  • use built-in test (pre post conditions class
    invariant assertions)

71
Inheritance
  • A base class defines an interface with a
    contract that all derived classes must honour
  • a test of a derived class must consider the
    promises made by the base class
  • the state of the derived class includes all state
    in the classes above it in the inheritance tree
  • Checklist for testing inheritance hierarchies
  • incorrect initialisation check that the
    superclass is correctly initialised in the
    subclass
  • inadvertent bindings arises out of
    misunderstanding the name scope rules
  • missing override copy constructor, equality
    etc...

72
Inheritance Checklist (cont)
  • naked access child writes directly to a parents
    variable, violating the parents state invariant
  • incorrect subclassing design problem
  • naughty children child method doesnt honour
    parents contact or leaves parent in invalid
    state
  • worm holes child expands the superclass state
  • spaghetti inheritance deep inheritance (depth gt
    5) and top heavy multiple inheritance
  • gnarly inheritance child restricts acceptable
    inputs
  • weird inheritance multiple inheritance used to
    achieve perverse code-sharing

Many of these problems can be detected and
corrected by design and code walk-throughs
73
Dynamic Dispatch
  • Cant test the client interface to the dynamic
    server object by just one run through the client
    object code
  • if (account-gtavailable(amount)
  • account-gtwithdraw(amount)
  • else
  • // display error

74
Dynamic Dispatch
  • Treat the dynamic dispatch like a C switch
    statement for each subclass and test all branches
    to achieve good interface coverage
  • switch(account.type)
  • case CHEQUE
  • if (cheque_available(account,amount)
  • withdraw(account, amount)
  • else
  • // display error
  • break // etc for other account types

75
Modal Objects
  • The modality of an object is categorised as one
    of the following
  • Non-modal the methods in the object can be
    invoked in any order, regardless of object state
    (e.g. DateTime storage class get/set methods)
  • Quasi-modal methods can throw an exception if
    called, depending on some abstraction of object
    state (e.g. Stack container pop/push methods are
    illegal when the stack is empty/full
    respectively)
  • Modal method validity is directly related to
    object state (e.g. close() method on a bank
    account is only allowed when the account
    attribute closed is false)

76
Testing Modal Objects
  • Use specification driven white-box testing for
    objects with any kind of modality
  • For Quasi-modal and modal objects, there is more
    chance of a bug lurking around the exceptional
    cases than elsewhere
  • class IntSet
  • ...
  • void add(int i) // contains(i) gt exception
    otherwise adds i
  • void remove(int i) // !contains(I) gt
    exception otherwise removes i
  • bool contains(int i) // returns true iff i
    is contained in the set
  • ...

77
Testing Modal Objects
  • Purpose
  • To test that an attempt to add an integer to a
    set which already contains that item will throw
    an exception and not corrupt the set.
  • To test removal of an item from a set
  • removes the item
  • does not remove any other item
  • What else is tested by this script?

Test Sequenceset-gtadd(1)set-gtadd(2)try
set-gtadd(1) // shouldnt get
here assert(false) catch assert(set-gtcontai
ns(1)) set-gtremove(1) // exception?
assert(!set-gtcontains(1))assert(set-gtcontains(2)
)
78
Templates
  • Template classes or functions are never fully
    tested
  • Whenever a new template instantiation is made,
    that instantiation will require testing
  • the new parameter may not implement the features
    required by the template, or may not implement
    them correctly according to the rules of the
    template class
  • on some occasions, the template itself has subtle
    bugs which are only triggered by particular
    (legal) parameters
  • testing a template instantiation is an
    integration problem
  • templates cannot be tested at all without
    integration with a stub parameter class

79
Overview
  • Integration Levels
  • Module / Unit Testing
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

80
Coding Standards
  • Ensure consistency of development
  • Maintainability
  • Reusability
  • Testability
  • Help avoid common pitfalls and faults
  • Defensive programming
  • Fault tolerant programming

81
Coding Standards
  • For sample coding standard resources
  • See
  • http//healthnet.hnet.bc.ca/catalogu/provider_regi
    stry/supplementarybin/database_design/oracle_desi
    gn_and_coding.pdf
  • See
  • http//www.parasoft.com/jsp/templates/bulletproofi
    ng/Chap8_crop.pdf

82
Overview
  • Integration Levels
  • Module / Unit Testing
  • Integration Testing
  • Harnesses Stubs
  • Test Oracles
  • Object-Orientation Concerns
  • Coding Standards
  • Unit Test Frameworks

83
Unit Test Frameworks
  • Provides the test scaffolding around the code
    under development
  • Available tools
  • Commercial Tools
  • Jtest, Cantata, etc.
  • Extreme Programming frameworks (OpenSource)(http
    //c2.com/cgi/wiki?TestingFramework)
  • Junit, HTTPUnit, DelphiUnit, CppUnit, PerlUnit,
    PhPUnit, etc.

84
JUnit
  • Java (code-level) regression testing framework
  • Written by Erich Gamma Kent Beck
  • See www.junit.org
  • Open Source
  • Many extensions and documentation

85
Building JUnit Tests
  • Define a subclass of TestCase
  • Override the setUp() method to initialise objects
    under test
  • Override the tearDown() method to release objects
    under test
  • Define one or more testXXX() methods to exercise
    objects under test
  • Define a suite() factory method the creates all
    the testXXX() methods or the TestCase
  • Define a main() method to run the TestCase

86
Case Study - Money Class
class Money private int fAmount private
String fCurrency public Money(int amount,
String currency)         fAmount
amount fCurrency currency public int
amount() return fAmount public String
currency() return fCurrency public
Money add(Money m) return new
Money(amount()m.amount(), currency())
87
Case Study - Test Case
Junit Test Case
public class MoneyTest extends TestCase
// public void testSimpleAdd() Money
m12CHF new Money(12, CHF") Money m14CHF new
Money(14, "CHF") Money expected new Money(26,
"CHF") Money resultm12CHF.add(m14CHF)
assert(expected.equals(result))
Object Creation
Method Under Test
Result Verification assert - check boolean result
is true
  • Need an equals method in Money

88
Case Study - Test Case
  • Create test for Equals first

Result Verification assertEquals - compare two
values
public void testEquals() Money m12CHF new
Money(12, "CHF") Money m14CHF new Money(14,
"CHF") assert(!m12CHF.equals(null))
assertEquals(m12CHF, m12CHF)
assertEquals(m12CHF, new Money(12, "CHF"))
assert(!m12CHF.equals(m14CHF))
89
Case Study - Optimised Test Cases
  • setUp tearDown methods available to manage
    objects
  • public class MoneyTest extends TestCase
  • private Money f12CHFprivate Money f14CHF 
  • protected void setUp() f12CHF new Money(12,
    "CHF") f14CHF new Money(14, "CHF")
  • public void testEquals() assert(!f12CHF.equals
    (null)) assertEquals(f12CHF, f12CHF) assertEqu
    als(f12CHF, new Money(12, "CHF")) assert(!f12CHF
    .equals(f14CHF))
  • public void testSimpleAdd() Money expected
    new Money(26, "CHF") Money result
    f12CHF.add(f14CHF) assert(expected.equals(result
    ))

90
Case Study - Test Suite
  • Suite is a static method
  • Test cases are added to the suite
  • public static Test suite()
  • TestSuite suite new TestSuite()suite.addTest(n
    ew MoneyTest("testEquals"))suite.addTest(new
    MoneyTest("testSimpleAdd"))return suite

91
Case Study - Running Tests
  • Choice of
  • Textual UI
  • Swing UI
  • AWT UI
  • /
  • Uncomment choice of UI
  • /
  • public static void main()
  • String testCaseName MoneyTest.class.getName(
    )// junit.textui.TestRunner.main(testCaseName)
    // junit.swingui.TestRunner.main(testCaseName)j
    unit.ui.TestRunner.main(testCaseName)

92
Unit Test Organisation
  • Create the tests in the same package as the code
    under test
  • For each Java package in the application, define
    a TestSuite class that contains all the tests for
    verifying the class
  • Make sure the build process includes the
    compilation of all test suites and test cases

93
Unit Test Principles
  • Code a litle, test a little, code a little, test
    a little
  • Run tests as often as possible, at least as often
    as you run compiler
  • Run all the tests in the system at least once per
    day
  • Begin by writing tests for the area of code that
    your most worried about breaking
  • Write tests that have highest possible return on
    your testing investment
  • When you need to add new functionality, add the
    tests first
  • If you find yourself debugging using println,
    write a test case instead
  • When a bug is reported, write a test case to
    expose the bug
  • Next time someone asks for help debugging, write
    a test case to expose the bug
  • Dont deliver code that doesnt pass all the tests