Title: New Millennium EO1 Advanced Land Imager 23 January 1998
1Ground System
Dan Mandl January 22, 1999
2(No Transcript)
3Ground System
Dan Mandl January 22, 1999
4(No Transcript)
5(No Transcript)
6Documents
- Data Policy March 1999
- Data Mangement Plan draft January 1999
- Detailed Mission Requirements - July 1998
- Mission Operations Support Plan (Design) - June
1999 - Test Plan - 2nd draft January 15, 1999
- ICDs
- Space to Ground - baselined
- MOC to SVF - baseline 1/30/99
- Landsat MOU - draft 1/15/99
- Mission Procedures Document
- Vol 1 Ops Concepts - January 6, 1999 (baseline on
1/30/99) - Vol 2 Detailed Ops Plan - draft 1/30/99
- S/C Users Guide 6/99
7Reviews
- SDR/MOR 11/5/97
- Delta MOR 1/28/99
- FOR/ORR 11/99
8CGS Releases and Content
- Release 1 - December 15, 1997
- ASIST 5.0 - base capability
- Release 2 - June 15, 1998
- ASIST 6.1 - enhanced base capability
- Release 3 - Slipped from Dec 15, 1998 to February
15, 1999 - ASIST 6.2 - Working CMS capability for EO-1
- Release 3.1 - March 1, 1999
- ASIST 6.2a - TCP/IP interface to ground station
capability - Release 4 - June 15, 1999
- ASIST TBD - SAMMI Samplets capbility for Web
displays and cleanup
9DPS Releases and Content
- Release 1 - February 15, 1998
- CADU processing (complete)
- ALI descrambling S/W (complete)
- AC processing S/W (complete)
- DLT carousel interface (complete)
- AMPEX tape unit interface
- Need to install new driver
- Integration of above modules
10DPS Releases and Content
- Release 2 - June 15, 1998
- Process Hyperion data
- Process housekeeping data from an AMPEX tape
- Tag images with a start and stop time derived
from housekeeping data - Provide capability to FTP S-Band backup science
data to DPS FEDS - Respond to the following error condtions
sequence errors, RS errors - Provide quality reports
11MOPSS Releases and Content
- Release 1 - June 15, 1998 (complete)
- Ingest and display FDF orbital event predicts
(reuse) - Allow operator key in of TDRSS and GS event
schedule (existing capability) - Schedule activities/commands relative to
orbital/GS/TDRSS events (reuse/modify) - Allow user definition/edit of scene requests
- Schedule activities relative to image events
(mod) - Allow user to block out periods when imaging is
not allowed (reuse) - Provide capability to view and modify EO-1
timeline (reuse) - Provide capability to build an activity plan
reflecting timeline (reuse)
12MOPSS Releases and Content
- Release 1 - continued (complete)
- Provide the capability to create an updated
activity plan (reuse) - Provide the capability to schedule activities
relative to events (reuse) - Allow for the user to manually schedule
activity/commands (reuse) - Allow user to browse and modify auxiliary data
for events/activities scene requests, etc.
(reuse) - Provide feedback to the operator when constraints
or conflicts occur (mod) - Basic report generation support (reuse)
13MOPSS Releases and Content
- Release 1.1 - October 26, 1998 (complete)
- Ingest FDF-generated maneuver plan and command
sheet (reuse TRMM) - Schedule orbit maneuver related sequences (slight
mod TRMM) - Ingest and display FDF orbital event predicts
(mod)
14MOPSS Releases and Content
- Release 2 - January 8, 1999 (to acceptance
testing) - Display, allow selection, and transmit GS
schedule from WSG (reuse) - Receive and display GS schedule from WSG (reuse)
- Ingest and display SVF-provided ground image
scene request (through long-term plan file) (mod) - Ingest and display cal scene requests (through
FDF calibration slew products) - Automatically select images and schedule image
related commands (mod) - Ingest command database from ASIST to create
MOPSS event classes.
15MOPSS Releases and Content
- Release 2 - continued
- Assign WARP file IDs for each data stream to be
stored for each DCE (new) - Perform resource utilization checks (WARP
availability, instrument on time, etc.) (mod/new) - Each WARP file should be assigned a file ID that
correlates to DCE, DCE type, and data stream/type
(ex MS/PAN dark cal, MS/PAN instrument
calibration, MS/PAN image, etc) (new) - Each WARP field ID should be assigned a unique
number (new)
16MOPSS Releases and Content
- Release 3 - March 31, 1999
- Calculate and display image times based on
requested scene location and predicted EO-1 orbit
position (includes ingest of necessary FDF
products) (reuse Landsat) - Interface with FDF algorithms to schedule
activities/commands for momentum management and
attitude maneuvers for nadir and cal images.
Note - different interface for nadir and cal
images (new) - Provide momentum management/attitude maneuver
related constraint checking (new) - Generate enhanced reports image summary report
and/or pass plan (new)
MOPSS
17MOPSS Releases and Content
- Release 3 - March 31, 1999
- Ensure activity plan is not generated if new GS
schedule from WSG has been received but not
processed. (new) - Provide scenario scheduling of realtime procs
(reuse MAP) - Support recent changes to long-term plan and
calibration slew file formats.
MOPSS
18FDSS Release Contents and Schedule
- Release 1 - May 15, 1998 complete
- STK (COTS) Generate baseline orbit product set
for testing with MOPSS rel 1 - Autocon-G (COTS) Model profile for performing EFF
maneuvers - MatLab/ADS (COTS based) perform base attitude
determination functions - WRS Sun Angle Utility (C) Compute Sun Angles
with Respect to Rows on the World Reference - Release 2 - October 15, 1998 complete
- Autocon-G (COTS)
- Generate EO-1 Orbit Ephemerides containing EFF
maneuvers - Generate first group of Autocon-G orbit products
for MOPSS
19FDSS Release Contents and Schedule
- Release 2 - October 15, 1998 complete
- MatLab/ADS (COTS based) Capability to use a
socket connection to ASIST - MatLab/RTADS (COTS based) Perform base realtime
attitude determination function - Release 3 - January 2, 1999 complete
- FreeFlyer (COTS) Capability to plan EO-1 ascent
maneuver - Autocon-G (COTS) Capability to generate
additional orbit products for MOPSS plus
acquisition data products - Release 4 - March 15, 1999
- STK (COTS) Capability to generate additional
orbit products in EO-1 MOC version of STK
20FDSS Release Contents and Schedule
- Release 4 - March 15, 1999 (cont)
- MatLab/ADS (COTS based) Refined attitude
determination capabilities - MatLab/RTADS (COTS based) Refined real time
attitude determination capabilities - MatLab/Momentum Management Utility (COTS based)
Compute required wheel speed changes to reduce
jitter during EO-1 imaging - MatLab(CALMAN/Attifude Slew Utility) (COTS Based)
Planning tool for EO-1 instrument calibration or
computing any required S/C slews - INTRACK Tool for performing S-band tracking data
pre-processing
21FDSS Release Contents and Schedule
- Release 4 - March 15, 1999 (cont)
- Precision Orbit Determination (PODS) (COTS) Tool
to perform EO-1 Orbit Determination/Orbit
Smoothing using either GPS data or ground based
S-Bans tracking - Fuel Remaining Utility (COTS based) Tool to
estimate the amount of hydrazine remaining in the
propellant tank - Release 5 - May 15, 1999
- Science Planning Aids Algorithm (COTS based)
Algorithm to enable MOPSS and Mission Science
Office to schedule EO-1 imaging activities
22Tests and Sims
- Acceptance testing for all subsystems internal to
developer groups - T1 S/C to MOC complete 12/22/98 telemetry ok,
command testing deferred to T2 - T2 S/C-MOC-CMS-MOPSS-FDSS 2/99
- T3 S/C-MOC-MOPSS-DPS-SVF 4/99
- T4 RF Compatibility 6/99 and 8/99
- T5 MOC to Ground Stations 6/99
- T5.1 MOC to TDRSS 9/99
- T6 MOC to WTR 9/99
- T7 Fully integrated End to End 10/99
23Tests and Sims (cont)
- Launch Sim 6/99 during Thermal Vac
- Normal Ops Sim 8/99 during 2nd Thermal Vac
- Contingency Ops Sim 9/99
- Dress Reheasal 11/99
- Note that these sims may be run on a few
occasions as needed
24Launch Planning
- Operations Working Group 2 12/4/98
- Launch timeline
- Draft 12/98
- Baseline 6/99
- Launch site preparations (SWALES)
- PRD
25Normal Ops Planning
- Working on allocating procedures between TSMs
and ground procedures - Ground procedures
- 90 reuse
- Guess that less than 30 new ones need to be
developed - Displays
- No new displays identified
- Database - reused from IT
26Normal Ops Planning (cont)
- Automation
- Prepass - MOPSS
- FOT populates scenarios
- Use after LEO
- Estimate 1 mm effort
- Pass
- MOPSS drives STOL procedures w/feedback
- Spacecraft Emergency Response System (SERS)
notifies FOT member if there is problem - Estimate 1 mm to populate both
- Post pass
- DPS - manual set of activities
- Trending
- No additional effort idenfied
27Contingency Ops
- Identify constraints and triggers
- Identify if response is via TSM, FDC or procedure
activity - Identify set of activities and procedures to
develop - Gather constraints and triggers
- Most contingency procedures derives from IT
- Guess that there will be less than 30 unique
contingency procedures - identified 10 thus far
28Training
- Senior experienced staff
- S/C and ASIST training mostly complete due to
involvement of FOT in IY - FDSS, CMS, MOPSS and DPS
- FOT conducting the testing and therefore will
simultaneously be trained to operate these
systems - No plans to develop training plan for new people
since staffing plan calls for reduction of
present staff by 40 anyway - Automation lessens need for highly trained staff