... install new driver. Integration of above modules. DPS Releases and ... Each WARP field ID should be assigned a unique number (new) MOPSS Releases and Content ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 29
Provided by: danm2
Category:

less

Transcript and Presenter's Notes

Title: New Millennium EO1 Advanced Land Imager 23 January 1998


1
Ground System
Dan Mandl January 22, 1999
2
(No Transcript)
3
Ground System
Dan Mandl January 22, 1999
4
(No Transcript)
5
(No Transcript)
6
Documents
  • Data Policy March 1999
  • Data Mangement Plan draft January 1999
  • Detailed Mission Requirements - July 1998
  • Mission Operations Support Plan (Design) - June
    1999
  • Test Plan - 2nd draft January 15, 1999
  • ICDs
  • Space to Ground - baselined
  • MOC to SVF - baseline 1/30/99
  • Landsat MOU - draft 1/15/99
  • Mission Procedures Document
  • Vol 1 Ops Concepts - January 6, 1999 (baseline on
    1/30/99)
  • Vol 2 Detailed Ops Plan - draft 1/30/99
  • S/C Users Guide 6/99

7
Reviews
  • SDR/MOR 11/5/97
  • Delta MOR 1/28/99
  • FOR/ORR 11/99

8
CGS Releases and Content
  • Release 1 - December 15, 1997
  • ASIST 5.0 - base capability
  • Release 2 - June 15, 1998
  • ASIST 6.1 - enhanced base capability
  • Release 3 - Slipped from Dec 15, 1998 to February
    15, 1999
  • ASIST 6.2 - Working CMS capability for EO-1
  • Release 3.1 - March 1, 1999
  • ASIST 6.2a - TCP/IP interface to ground station
    capability
  • Release 4 - June 15, 1999
  • ASIST TBD - SAMMI Samplets capbility for Web
    displays and cleanup

9
DPS Releases and Content
  • Release 1 - February 15, 1998
  • CADU processing (complete)
  • ALI descrambling S/W (complete)
  • AC processing S/W (complete)
  • DLT carousel interface (complete)
  • AMPEX tape unit interface
  • Need to install new driver
  • Integration of above modules

10
DPS Releases and Content
  • Release 2 - June 15, 1998
  • Process Hyperion data
  • Process housekeeping data from an AMPEX tape
  • Tag images with a start and stop time derived
    from housekeeping data
  • Provide capability to FTP S-Band backup science
    data to DPS FEDS
  • Respond to the following error condtions
    sequence errors, RS errors
  • Provide quality reports

11
MOPSS Releases and Content
  • Release 1 - June 15, 1998 (complete)
  • Ingest and display FDF orbital event predicts
    (reuse)
  • Allow operator key in of TDRSS and GS event
    schedule (existing capability)
  • Schedule activities/commands relative to
    orbital/GS/TDRSS events (reuse/modify)
  • Allow user definition/edit of scene requests
  • Schedule activities relative to image events
    (mod)
  • Allow user to block out periods when imaging is
    not allowed (reuse)
  • Provide capability to view and modify EO-1
    timeline (reuse)
  • Provide capability to build an activity plan
    reflecting timeline (reuse)

12
MOPSS Releases and Content
  • Release 1 - continued (complete)
  • Provide the capability to create an updated
    activity plan (reuse)
  • Provide the capability to schedule activities
    relative to events (reuse)
  • Allow for the user to manually schedule
    activity/commands (reuse)
  • Allow user to browse and modify auxiliary data
    for events/activities scene requests, etc.
    (reuse)
  • Provide feedback to the operator when constraints
    or conflicts occur (mod)
  • Basic report generation support (reuse)

13
MOPSS Releases and Content
  • Release 1.1 - October 26, 1998 (complete)
  • Ingest FDF-generated maneuver plan and command
    sheet (reuse TRMM)
  • Schedule orbit maneuver related sequences (slight
    mod TRMM)
  • Ingest and display FDF orbital event predicts
    (mod)

14
MOPSS Releases and Content
  • Release 2 - January 8, 1999 (to acceptance
    testing)
  • Display, allow selection, and transmit GS
    schedule from WSG (reuse)
  • Receive and display GS schedule from WSG (reuse)
  • Ingest and display SVF-provided ground image
    scene request (through long-term plan file) (mod)
  • Ingest and display cal scene requests (through
    FDF calibration slew products)
  • Automatically select images and schedule image
    related commands (mod)
  • Ingest command database from ASIST to create
    MOPSS event classes.

15
MOPSS Releases and Content
  • Release 2 - continued
  • Assign WARP file IDs for each data stream to be
    stored for each DCE (new)
  • Perform resource utilization checks (WARP
    availability, instrument on time, etc.) (mod/new)
  • Each WARP file should be assigned a file ID that
    correlates to DCE, DCE type, and data stream/type
    (ex MS/PAN dark cal, MS/PAN instrument
    calibration, MS/PAN image, etc) (new)
  • Each WARP field ID should be assigned a unique
    number (new)

16
MOPSS Releases and Content
  • Release 3 - March 31, 1999
  • Calculate and display image times based on
    requested scene location and predicted EO-1 orbit
    position (includes ingest of necessary FDF
    products) (reuse Landsat)
  • Interface with FDF algorithms to schedule
    activities/commands for momentum management and
    attitude maneuvers for nadir and cal images.
    Note - different interface for nadir and cal
    images (new)
  • Provide momentum management/attitude maneuver
    related constraint checking (new)
  • Generate enhanced reports image summary report
    and/or pass plan (new)

MOPSS
17
MOPSS Releases and Content
  • Release 3 - March 31, 1999
  • Ensure activity plan is not generated if new GS
    schedule from WSG has been received but not
    processed. (new)
  • Provide scenario scheduling of realtime procs
    (reuse MAP)
  • Support recent changes to long-term plan and
    calibration slew file formats.

MOPSS
18
FDSS Release Contents and Schedule
  • Release 1 - May 15, 1998 complete
  • STK (COTS) Generate baseline orbit product set
    for testing with MOPSS rel 1
  • Autocon-G (COTS) Model profile for performing EFF
    maneuvers
  • MatLab/ADS (COTS based) perform base attitude
    determination functions
  • WRS Sun Angle Utility (C) Compute Sun Angles
    with Respect to Rows on the World Reference
  • Release 2 - October 15, 1998 complete
  • Autocon-G (COTS)
  • Generate EO-1 Orbit Ephemerides containing EFF
    maneuvers
  • Generate first group of Autocon-G orbit products
    for MOPSS

19
FDSS Release Contents and Schedule
  • Release 2 - October 15, 1998 complete
  • MatLab/ADS (COTS based) Capability to use a
    socket connection to ASIST
  • MatLab/RTADS (COTS based) Perform base realtime
    attitude determination function
  • Release 3 - January 2, 1999 complete
  • FreeFlyer (COTS) Capability to plan EO-1 ascent
    maneuver
  • Autocon-G (COTS) Capability to generate
    additional orbit products for MOPSS plus
    acquisition data products
  • Release 4 - March 15, 1999
  • STK (COTS) Capability to generate additional
    orbit products in EO-1 MOC version of STK

20
FDSS Release Contents and Schedule
  • Release 4 - March 15, 1999 (cont)
  • MatLab/ADS (COTS based) Refined attitude
    determination capabilities
  • MatLab/RTADS (COTS based) Refined real time
    attitude determination capabilities
  • MatLab/Momentum Management Utility (COTS based)
    Compute required wheel speed changes to reduce
    jitter during EO-1 imaging
  • MatLab(CALMAN/Attifude Slew Utility) (COTS Based)
    Planning tool for EO-1 instrument calibration or
    computing any required S/C slews
  • INTRACK Tool for performing S-band tracking data
    pre-processing

21
FDSS Release Contents and Schedule
  • Release 4 - March 15, 1999 (cont)
  • Precision Orbit Determination (PODS) (COTS) Tool
    to perform EO-1 Orbit Determination/Orbit
    Smoothing using either GPS data or ground based
    S-Bans tracking
  • Fuel Remaining Utility (COTS based) Tool to
    estimate the amount of hydrazine remaining in the
    propellant tank
  • Release 5 - May 15, 1999
  • Science Planning Aids Algorithm (COTS based)
    Algorithm to enable MOPSS and Mission Science
    Office to schedule EO-1 imaging activities

22
Tests and Sims
  • Acceptance testing for all subsystems internal to
    developer groups
  • T1 S/C to MOC complete 12/22/98 telemetry ok,
    command testing deferred to T2
  • T2 S/C-MOC-CMS-MOPSS-FDSS 2/99
  • T3 S/C-MOC-MOPSS-DPS-SVF 4/99
  • T4 RF Compatibility 6/99 and 8/99
  • T5 MOC to Ground Stations 6/99
  • T5.1 MOC to TDRSS 9/99
  • T6 MOC to WTR 9/99
  • T7 Fully integrated End to End 10/99

23
Tests and Sims (cont)
  • Launch Sim 6/99 during Thermal Vac
  • Normal Ops Sim 8/99 during 2nd Thermal Vac
  • Contingency Ops Sim 9/99
  • Dress Reheasal 11/99
  • Note that these sims may be run on a few
    occasions as needed

24
Launch Planning
  • Operations Working Group 2 12/4/98
  • Launch timeline
  • Draft 12/98
  • Baseline 6/99
  • Launch site preparations (SWALES)
  • PRD

25
Normal Ops Planning
  • Working on allocating procedures between TSMs
    and ground procedures
  • Ground procedures
  • 90 reuse
  • Guess that less than 30 new ones need to be
    developed
  • Displays
  • No new displays identified
  • Database - reused from IT

26
Normal Ops Planning (cont)
  • Automation
  • Prepass - MOPSS
  • FOT populates scenarios
  • Use after LEO
  • Estimate 1 mm effort
  • Pass
  • MOPSS drives STOL procedures w/feedback
  • Spacecraft Emergency Response System (SERS)
    notifies FOT member if there is problem
  • Estimate 1 mm to populate both
  • Post pass
  • DPS - manual set of activities
  • Trending
  • No additional effort idenfied

27
Contingency Ops
  • Identify constraints and triggers
  • Identify if response is via TSM, FDC or procedure
    activity
  • Identify set of activities and procedures to
    develop
  • Gather constraints and triggers
  • Most contingency procedures derives from IT
  • Guess that there will be less than 30 unique
    contingency procedures - identified 10 thus far

28
Training
  • Senior experienced staff
  • S/C and ASIST training mostly complete due to
    involvement of FOT in IY
  • FDSS, CMS, MOPSS and DPS
  • FOT conducting the testing and therefore will
    simultaneously be trained to operate these
    systems
  • No plans to develop training plan for new people
    since staffing plan calls for reduction of
    present staff by 40 anyway
  • Automation lessens need for highly trained staff