Title: New Horizons SOC Peer Review


1
New Horizons SOC Peer Review
Science Operations Center Implementation
PlanJuly 21, 2003
John Andrews SOC Project Manager 303-492-6092 andr
ews_at_casa.colorado.edu
2
Topics of Discussion
  • Review of SOC Functions Deliverables
  • Summary of schedule requirements
  • SOC Development schedule
  • SOC Phase C/D Staffing Plan
  • SOC Phase E Staffing Plan
  • Longevity Planning
  • Risk Assessment
  • Future Work Plans

3
Review of SOC Functions Deliverables
4
Summary of Schedule Requirements
  • Key need dates for the SOC development are driven
    by the missions development schedule. Those
    dates and the milestones within the SOC are
  • Have CSOC in place at APL by late summer 04 to
    support IT
  • Full functionality in Science Ops Sequencing
  • Limited functionality in Science Data Pipeline
    (beta version)
  • Have TSOC/CSOC in place and verified by 1/05
    prior to MSIM 2a which is scheduled for 2/05
  • T/CSOC both to have full functionality in SciOps
    Sequencing
  • Goal to have Science Data Pipeline up and able to
    accept instrument data from the 05 MSIMs
  • Goal is to place appropriate IT data into
    flat-files for future reference and database
    build
  • TSOC/PDS interface should be up and functional
    prior to launch in 1/06
  • As shown earlier, Sequencing schedule quite
    active throughout phase C/D to provide MSIM,
    post-launch checkout, Jupiter encounter, annual
    checkout, and Pluto/Charon encounter sequences

5
SOC Development Schedule
  • The detailed SOC development schedule is attached
    as a MS Project output.

6
SOC Phase C/D Staffing Plan
7
Tentative SOC Phase E Staffing Plan
8
SOC Longevity Planning
  • The SOC will adhere to the overall NH Longevity
    plans
  • Specifically the SOC will employ
  • Paper oriented documentation system for archiving
    users guides, manuals, etc. Data will not
    inherently be dependent upon a machine
    configuration or specific software package.
  • Selection of programming languages, software
    packages, etc. that are readily portable, stable
    and well documented, and in wide-spread use.
  • A cross-training effort so that all SOC personnel
    can backfill for one another in emergency
    situations.
  • Where possible, a recruitment and staffing plan
    whereby junior personnel are brought in on a
    timely schedule, trained and given experience,
    and then groomed for larger roles on the NH SOC
    and other SwRI flight missions.

9
SOC Risk Assessment
  • A summary of the key risks associated with the
    SOC development are
  • Communications access to personnel and data
    developing the NH spacecraft and instruments
    during a period when providing info to the SOC is
    perceived to be the least of their concerns.
  • Mitigation frequent, and if necessary annoying,
    contacts with development teams to acquire
    necessary materials.
  • Scope Creep on a fixed price and fixed schedule
    effort it is imperative that the SOC understand
    the prioritized requirements we must meet and
    work to those requirements.
  • Mitigation understand and baseline a well
    understood and agreed to set of requirements that
    we will not diverge from.
  • Resources Resource Continuity development
    success lies in the hands of a small team without
    a deep bench, which ultimately must function over
    some 12 years.
  • Mitigation start with good and experienced
    personnel then implement a staff development plan
    for recruiting, training, and grooming future
    personnel to support the missions longevity.

10
SOC Upcoming Work Plans
  • Key activities in the upcoming months and for the
    balance of this calendar year include
  • Initiating the early CAS/Frag development for the
    mature science instruments (LORRI and ALICE)
  • Complete the OPUS assessment and baseline it for
    the MDMP
  • Complete and baseline the 2 key SOC documents
  • SOC Requirements Document
  • Science Data Pipeline Requirements Document
  • Initiate the detail design of the Science Data
    Pipeline and SOC physical architecture
  • Support the Mission CDR, Mission Operations
    Review, and a SOC Design Review