Description:

Incorrect duct placement, and. Incorrect masonry work. Duct not lined up and not level. ... Incorrect duct placement, and. Incorrect masonry work with slipped collar. ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 21
Provided by: duanewre
Category:

less

Transcript and Presenter's Notes

Title: MH 116 Incorrect grounding, Incorrect racks and racking, Incorrect


1
(No Transcript)
2
MH 116Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work.Duct not lined up and not level.No
duct plugs.
3
Tree planted in duct line.
4
MH 117Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
5
Bldg 860Two duct goes to the MH, one stubs out
five feet.Two duct go through the floor on one
side of the Comm Rm and one on the other.
6
MH 33Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
7
MH 33Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
8
MH 35A good manhole.
9
MH 92 Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.Collar not lined
up with hole.
10
MH 92Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Local telco has
installed poured splice-cases.Core drills are to
high and either point up or down.
11
MH 81Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
12
MH 93Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
13
MH 93Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.Duct to close to
the ceiling.
14
MH 26Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
15
MH ?Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
16
HH 29 Incorrect grounding,Incorrect racks and
racking,Incorrect duct placement, andIncorrect
masonry work with slipped collar.Duct not lined
up and not level.No duct plugs.
17
MH 0 This MH has been sitting this way for
several months. They are waiting on a change to
the contract to add four more duct into the DCO.
18
MH 0
19
Barrack Phase 2
20
Barracks Phase 2 and Swing Space
Write a Comment