Title: ANALYSIS
1WELCOME
- ANALYSIS
- OF STAFF REQUIREMENT FOR P.O.H. OF ELECTRIC
DIESEL LOCOMOTIVES - Presented by
- SMT . KUSUM SINGH
Chief Personnel Officer (Admn.) - South Eastern Railway
2ANALYSIS OF STAFF REQUIREMENT FOR P.O.H. OF
ELECTRIC DIESEL LOCOMOTIVES
3STUDY CONDUCTED FOR
- DIESEL LOCO P.O.H.
-
-
AT
JAMALPUR , PAREL GOLDEN
ROCK WS -
-
- AND
- ELECTRIC LOCO P.O.H.
-
- AT KANCHRAPARA,
-
PERAMBUR
BHUSAWAL WS -
-
In
comparison with -
KHARAGPUR
WS
4Study Comprises of -
- COMPARISON OF ACHIEVEMENTS OF KGPWS WITH OTHER
W/SHOPS - COMPARISON OF ACTIVITIES
- ADDITIONAL ACTIVITY OF EACH WS OVER OTHER WS
- STAFF SUPERVISOR SANCTIONS PER LOCO
- MAN HOURS PER LOCO
- P.O.H. CYCLE TIME PER LOCO
- COST OF P.O.H. PER LOCO
- INCENTIVE OVER TIME AT DIFFERENT SHOPS
5COMPARISON OF ACHIEVEMENTS ACTIVITIESELECTRIC
LOCOMOTIVES
6COMPARISON OF ACHIEVEMENTS ACTIVITIES ELECTRIC
LOCOMOTIVES
7COMPARISON OF ACHIEVEMENTS ACTIVITIES ELECTRIC
LOCOMOTIVES
8COMPARISION OF SANCTIONED SUPERVISORS STAFF FOR
ELECTRIC LOCO POH
N.B-1. SUPERVISORS STAFF ENGAGED IN WHEELING
P.C.O. IN KGPW (9119)(544) 177 AS A SEPARATE
ACTIVITY MAKES (177563)740 2. REPAIR OF
TRANSFORMER RE-WINDING OF TRACTION MOTOR IS A
SEPARATE SHOP ACTIVITY IN KGPW, WHICH IS AN
INCLUDED ACTIVITY IN KPAWS.
9SANCTIONED SUPERVISORS STAFF FOR ELECTRIC LOCO
POH
10AVERAGE P.O.H. COST OF EACH ELECTRIC
LOCOMOTIVEIN RS. LAKHS (2005-06)
11INCENTIVE ACTIVITY AT KPAW 704 DW 204 EIDW
are engaged in incentive AT BSLW Most of the
staff are engaged AT PERW KGPW NO INCENTIVE
12COMPARATIVE STUDY OF POH OF ELECT LOCO OF KGPW
WITH OTHER WORKSHOPS-1
13COMPARATIVE STUDY OF POH OF ELECT LOCO OF KGPW
WITH OTHER WORKSHOPS-2
14COMPARATIVE STUDY OF POH OF ELECT LOCO OF KGPW
WITH OTHER WORKSHOPS-3
15COMPARATIVE STUDY OF POH OF ELECT LOCO OF KGPW
WITH OTHER WORKSHOPS-4
16COMPARISON OF ACHIEVEMENTS ACTIVITIESDIESEL
LOCOMOTIVES
17COMPARISION OF OVER TIME ACTIVITY(Hrs/Month)
-
18AVERAGE P.O.H. COST OF EACH DIESEL LOCOMOTIVEIN
RS. LAKHS (2005-06)
19COMPARISION OF SANCTIONED SUPERVISORS STAFF FOR
DIESEL LOCO POH
20COMPARISION OF SANCTIONED SUPERVISORS STAFF FOR
DIESEL LOCO POH
JMP-WS
21COMPARATIVE STUDY OF POH OF DIESEL LOCO OF KGPW
WITH OTHER WORKSHOPS-1
22COMPARATIVE STUDY OF POH OF DIESEL LOCO OF KGPW
WITH OTHER WORKSHOPS-2
23COMPARATIVE STUDY OF POH OF DIESEL LOCO OF KGPW
WITH OTHER WORKSHOPS-3
24COMPARISON OF MANPOWER PER LOCO
- Re-winding of Traction Motor Coil Manufacturing
is an EXTRA included Shop Activity in Diesel
P.O.H. at KGPW. - Repair of Transformer Re-winding of
Traction Motor is an EXTRA included Shop
Activity in Electric P.O.H. at KPAW
25COMPARISON OF POH COST PER LOCOIN RS. LAKHS
26P.O.H. CYCLE TIME (Working Days)
27MAN HOURS PER LOCO
28WEEKLY WORKING HOURS IN DFFERENT WORKSHOPS
29SUMMARY
- Due to items manufactured in KGPW itself, and
works under taken at the adjoining shops (Wheel,
air brake, brake blocks) and Weekly duty hours
being nearer to stipulations of Factory Act, i.e.
47 Hrs/Wk. it is possible to minimize the cost ,
Cycle time and Man hours on P.O.H. of
Locomotives. - Staff structure is justified at KGP in comparison
to works and out turn given by the staff of other
units. - Infrastructure exists for extra out turn of
Electric locos and scope of expansion in Diesel
P.O.H. at KGPWS, S.E.RAILWAY. - Re-winding of Traction Motor Coil Manufacturing
is an included Shop Activity in Diesel P.O.H.
at KGPW. - Uniform methodology in work ,working hours and
manpower is not adopted all over Indian Railways. - Repair of Transformer Re-winding of Traction
Motor is an included Shop Activity in Electric
P.O.H. at KPAW. - Sanctioned Staff is against loco/ month. Report
based on sanctioned strength only