Title: Coffenberry Gym Construction
1Coffenberry Gym Construction
Construction Period May 21st to June 11th,
2008 Douglas Brewer, Facility Director
2Second Story over Lobby
The metal floor trusses are installed to support
the second story structure about to be built.
3Second Story Continues
The metal galvanized panels are installed onto
the floor supports for the second story health
rooms.
4Gym Main Roof Trusses
The metal roof trusses for the main gym floor
have been installed ready for the metal
galvanized sheets to be installed later.
5Gym Windows
The three openings framed in metal are for
windows that will eventually be placed in
position. These are located on the south and
north sides, east and west of the walls.
6Locker room internal framing
Metal framing is being used to make the walls for
offices, storage and shower stalls in the locker
room.
7HVAC Ducting
The metal ducting for the locker room is shown
here being installed. The rooftop mounted units
will be tied into the large duct in the
background.
8Second story
Here is the top of the lobby area where the
second story health rooms will be, as yet
unfinished.
9Second story again
Another shot of the second story as yet
incomplete. The Coffenberry Middle School is in
the background of the picture.
10Second Story Continued
The steel flooring is being made ready for a
concrete pour to finish off the surface. Window
openings are framed.
11Second Floor Concrete Pour
12Gym as of 6-9-2008
13Change Orders in June
- No change orders for the month of June to date
have been made. - A requested change by S.U.S.D. has been for an
area under the lobby stairs that was designed
inaccessible be turned into an area that can be
used for storage. Costs are going to be given to
us and a decision will be made from that price.
This involves a door being installed along with a
sprinkler head installed. Significant storage can
be obtained by opening an access to this area. - Nova-Mesh a concrete additive has been installed
in the second story floor pour. This gives us
decreased cracking on the floor which will be
covered with vinyl floor tiles.
14END