Title: Investigation and Repair of an Ethanol Plant Mat Foundation


1
Investigation and Repair of an Ethanol Plant Mat
Foundation
  • 2008 Structures Congress
  • Vancouver, BC
  • Daniel J. Larson
  • American Engineering Testing, Inc.
  • St. Paul, MN

2
U.S. Ethanol Production
  • Since 2000, 80 biorefineries put into production
  • 77 new or expanded facilities planned
  • 13,500 million gallons per year

3
HISTORIC U.S. FUEL ETHANOL PRODUCTION
Millions of gallons
Source Renewable Fuels Association, January 2008
Estimated
4
Grain Silo Facts
  • 74 feet in diameter
  • 150 feet tall
  • Slip-form construction
  • 33 inch thick mat foundation

5
N
Plan Silo and Tunnel Structures
6
Geotechnical Review
  • Topsoil underlain by sandy lean clay
  • Bedrock 15 to 18 feet below grade
  • 7 to 9 feet of additional fill to attain planned
    subgrade elevation
  • Two foundation options considered
  • Deep foundation system
  • Mat foundation

7
(No Transcript)
8
Investigative Borings
  • Five standard penetration test borings
  • Variable fill density and moisture
  • Nine cone penetration test soundings
  • Correlated with borings
  • Estimated additional settlement of 2 to 6 inches
    if no remediation

9
Vertical Control Monitoring
  • Eight vertical control points
  • Weekly readings
  • Up to 2 inches of settlement before remediation
  • Crack gauges

10
Structural Investigation
  • Visual documentation
  • Nondestructive evaluation
  • Sounding
  • Impulse radar
  • Impact-echo
  • Invasive testing and sampling
  • 17 cores

11
Cracking Around Boot Pit
12
Mat Foundation
13
Upper Transfer Tunnel Wall
14
(No Transcript)
15
(No Transcript)
16
Findings
  • Differential settlement between mat and boot pit
    foundations caused distress
  • Additional settlement of 2 6 inches of mat
    foundation unacceptable
  • Differential settlement could not be accommodated
    by current design

17
Repair Program
  • Stabilize mat foundation
  • Compaction grouting
  • Micropiles
  • Restore integrity of mat foundation and tunnel
    structures in boot pit area
  • Create allowance for differential movement
    between mat and boot pit

18
Sequencing of Repairs
  • Compaction grouting
  • Monitoring of vertical movement during controlled
    filling of silos
  • Structural repairs

19
Compaction Grouting
  • Six foot on center spacing
  • 178 grout columns installed
  • 2,840 lineal feet
  • 350 cubic yards of grout

20
Schematic of Compaction Grouting
21
Structural Repairs
  • Partial and full-depth replacement of mat
    foundation
  • Reinforced overlay on tunnels walls and floors
  • Soft joint between top of boot pit walls and mat
    foundation

22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
Post Repair Performance
  • No recurrence of distress
  • Silos routinely filled to near capacity
  • Unbalanced loading
  • Long term settlement of mat unknown

28
Lessons Learned
  • Interaction between structural elements with
    different bearing strata
  • Caution when using deep fills for foundation
    support
  • Cooperative effort avoided delays

29
Investigation and Repair of an Ethanol Plant Mat
Foundation
  • 2008 Structures Congress
  • Vancouver, BC
  • Questions?