Title: Barrel Support Structure and Barrel Integration Preparations


1
Barrel Support Structure and Barrel Integration
Preparations
  • Doug Benjamin
  • Duke University HEP

2
Barrel Support Structure (BSS)
  • Fabricated in Russia
  • Components A side and C side end Frames
  • Inner cylinder
  • Outer cylinder (in two halves)

3
Dukes Role in BSS assembly
  • Integral part of small team (6 people Jack
    Fowler and DB)
  • Jack Fowler one of two engineers
  • DB physicist responsible
  • Verify the BSS assembly Frame
  • Develop and verify BSS assembly
  • JF designed inner cylinder flange.

4
Dukes Role in BSS assembly (Cont.)
  • Measure individual BSS components
  • Analyze the measurement results

5
Dukes Role in BSS assembly (Cont.)
  • Shield the BSS components
  • Assemble the BSS
  • Verify the BSS alignment results

6
Preparations for integration
  • DB was physicist reponsible for integration
  • Developed the procedures to be used during
    integration
  • Verified the procedures
  • DB and JF produced a lengthy list of items to be
    finished before integration.
  • This list was adopted by an internal review
    committee on barrel integration readiness

7
Preparations for integration (cont.)
  • Prepared the infrastructure require for
    integration (scolding, gas lines, HV lines, HV
    software, module protection)
  • Prepared the modules for integration (Capacitor
    insertion)
  • First module permanently installed June 2004
  • DB passes responsibility for Barrel integration
    to Chiho Wang during June 2004
  • DB could not travel as much ( 60 of time at
    CERN) for family reasons.

8
Conclusions
  • Duke played a vital role in the BSS assembly
  • Without efforts of JF and DB BSS assembly and
    verification would have not happened in a timely
    manner.
  • DB and JF made crucial and significant
    contributions to preparations for the start of
    integration. This required that both spend large
    amounts of time at CERN for the past year (gt 6
    months each).
  • Excellent preparation for integration has meant
    that integration has gone smoothly (see Chihos
    talk).
Write a Comment