Title: CalibrationValidation of the NPOESS NPP Instruments: Plan Overview National PolarOrbiting Operationa
1Calibration/Validation of the NPOESS NPP
Instruments Plan OverviewNational
Polar-Orbiting Operational Environmental
Satellite SystemKaren St.Germain, NPOESS
Integrated Program OfficeDirect Readout Meeting,
October 3-6, 2005
2(No Transcript)
3Philosophy of Calibration/Validation
Cal/Val
- Centrals
- NWP
- Real-time tactical
- Non-tactical
- JTWC
- NHC
- JIC
- Science
- Others
Calibration
Validation
Users
Mission Success
- Absolute Accuracy
- Polarization Purity
- Geolocation Accuracy
- Instrument Stability
- Signal-to-Noise
- Antenna Pattern Correction
- Environmental Data Products (EDRs)
- Atmosphere
- Ocean
- Land
- Ice
- Space
Ensures
- Meet Specification
- Operational production of synoptic maps and
profiles of critical atmospheric, oceanographic,
land and space parameters - Known Accuracy
- Quality Control
Calibration ensures that the Sensor Data (SDRs)
are usable Validation ensures that the
Environmental Data (EDRs) are usable
4The Stakeholders
NGST
Driver Meet Spec
Resources Cal/Val infrastructure,
Payload subcontractors Manpower
IPO
NASA
DriverScience Quality
Driver Meet IORD
Success
Resources Cal/Val Heritage, BAA
Correlative Data Assets, MOUs
Resources Cal/Val Heritage, Manpower
Science Data Segment
Centrals
Driver Mission
Resources Real time Quality Assessment
5NPOESS Calibration Verification Validation
Program- System Perspective
Prelaunch
Post-Launch
Long-Term Monitoring
Sensor Characterization and Calibration
Operations, Maintenance, and Upgrades
Calibration and characterization on-orbit
Heritage sensor data, design analysis
Calibration and characterization ground tests
Sustaining calibration and validation
Algorithm tuning and upgrades
RDR/SDR validation
Verification of science algorithm quality and
latency
Verification of operational algorithm quality and
latency
Validation of operational EDR quality and latency
Operational EDRs
RDR/SDR/EDR Validation
RDR/SDR/EDR Verification
6Cal/Val Complexity
- 26 EDRs
- 4 New Instruments
- 3 Resource Management Centers
- Pre-launch tests occurring at 4 different sensor
vendors - How are we managing this?
- How do we know our plans are comprehensive?
7Coordinated NPP Cal/Val Plan Baseline and Changes
- Coordinated NPP Cal/Val Plan Baseline
- The SSPR Prime contractor, the Integrated Program
Office, and the NAS NPP Science team have a
(mostly) common interest in executing a
successful Cal/Val - SDR/EDR Compliance-to-Cal/Val Requirement system
engineering (with Science and Technical Advisors
involvement) will identify tasks that are must,
specific, realistic, and measurable. A Tasks
Network will be used to explore schedule
constraints and clearly define task
responsibilities - The CVMT and Science/Technical Advisors are
responsible for constraint management - Looking for synergistic tasks. Exploring parallel
task execution options - Identifying discrepancies in bottom-up schedule,
budget and Goals - Using priorities to explore trade-offs
- Using NPOESS SCB and NETS to resolve schedule and
budget gaps - From the Task Network the CVMT will establish
roles and responsibilities among performing
organizations - The CVMT will manage execution of the Joint NPP
Cal/Val Plan baseline - Joint NPP Cal/Val Plan Baseline changes
- The CVCCB will manage baseline changes employing
traditional CCB processes and documentation
8NPOESS NPP Cal/Val Big Picture
Pre-Launch
Post-Launch
Long-Term Monitoring
Sensor Dgn
Parts
Subsys
Sys
IT
SDR/EDR Ingest - Performance Parameters
LUT - Geolocation - Cal Xfer -
Radiometry/Photometry
Perf. Budget
Compliance Review Board
Point Budget
Anomaly Resolution
Op Algorithm Change
Cal Budget
Performance Calibration Verification
SDR Validation
RDR Quality Selection
EDR Validation
Readiness Demo
Manufacturing, IT
Cal/Val Infrastructure Design
Infrastructure RDR Storage, Match-up Data,
Ground Truth, ICVS, LTA,, Quality Flags, Tools,
Op/Sci Algorithms
Infrastructure Req. Data Storage, Sci/Op
Algorithms, Tools, Ground Truth, Match-up Data
Geo-location
Cal Scenes Solar/Lunar Ground
EDR Match-up Data
X-Cal (Space Assets)
Airborne Campaign
Ground Campaign
Etc.
RDR Quality
Task Lead
Task Lead
Task Lead
Task Lead
Task Lead
Task Lead
Task Lead
Task Lead
Task Planning Execution
BaselineChange
Task Planning
Intensive Cal/Val
Sustaining Cal/Val
Cal/Val Plan Baseline (Task Network, Data Req.,
Algorithm Need, Infrastructure Req.)
L 7 mos
Baseline
Coordinated IPO-NASA-NGST SSPR Activity
Heritage Validation New Approaches (Doc, Data
Req, Implementation Support, Lessons Learned)
9Bottom Up approach to defining Cal/Val
- Driven by diagnostic work that has to be done in
the intensive post-launch phase
10- Tasks are captured in a web-based relational
database - Attributes include Data, metadata, tools, entry
and exit criteria, etc.
11Once described, tasks are linked logically and
scheduled
Technical threads are rigorously developed and
reviewed by joint teams with individuals from
NGST, sensor vendors, Academia, Govt Labs, and
FFRDCs.
ATMS Thread
12A technical library supports the distributed
Cal/Val Team
- Sensor data, analyses, algorithms, formats,
tools, reports
13The technical library includes the algorithms and
their supporting documentation
- ATBDs, code, test data, formats, results, etc.
14All code, including algorithms and tools is under
configuration control for Cal/Val
15Cal/Val Anomaly Resolution Ops Change
- The IPO/NASA/NGST SSPR Cal/Val Team will perform
analysis and validation of calibration and
SDR/EDR performances - Cal/Val anomalies will be investigated by expert
SSPR CV Anomaly Resolution Teams - Anomaly findings and resolutions will be
submitted to the CVCCB for consideration and
subsequent recommendation to the ACCB and the OS
CCB for operational implementation
16Algorithms and Validation
Infrastructure
Validation Data Sources
Data Quality Subsystem
Validation Data Tools
Cal/Val Database
Cal/Val Activities Today
Internal Govt Studies
Quality Flags/ Intermediate Products
NPP Science Team
OATs Interface
Analysis Tools
MOUs/MOAs
Long Term Monitoring Requirements and Tools
Pre-launch Testing
S/C Attitude Maneuvers
Sensor Algorithms (SDRs)
Transition to OS
Cal Coefficients/Look-up Tables
OPSCON Scenarios
NPP Cal/Val Plan
Sensor Calibration
Operational Issues
17Two Questions and an Opportunity
- Are there Cal/Val concerns specific to the Direct
Readout community? - Global look-up tables
- Radiometric calibration consistency
- Cross-instrument geolocation
- What can the direct readout community bring to
the Cal/Val program? - Validation concepts
- http//ipo.noaa.gov
- Internal Government Studies Program Announcement
18NPOESS Calibration Verification Validation
Program Participants
Development Activities
Performance Advisory Activities
Exploration Exploitation Activities
- Integrated Product Teams (IPTs)
- Systems Engineering
- (SE, SI, STE)
- Payloads
- IDPS
- Operations and Support
- IPO Cal/Val Team
- NPOESS Operational
- Algorithm Team (NOAT)
- Science
- Algorithms
- Sensors
NPOESS Internal Government Studies
NASA NPP Science Team
- Integrated Product Teams (IPTs)
- Systems Engineering
- (SE, SI, STE, Cal/Val)
- Payloads
- IDPS
- Operations Support
- NGST Cal/Val Team
- NGST Science
- Advisory Team (SAT)
- Science
NGST SE IPT Science Team
NPOESS Customer Forum
NOESS P3I
Calibration/Validation Working Group
(CVWG) Calibration/Validation Teams
(Participation from Govt Labs, Universities,
FFRDCs, Centrals)