Acadiana Load Pocket Project - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Acadiana Load Pocket Project

Description:

load growth, changes to generation dispatch in the Acadiana Load Pocket (ALP) ... to N-1, G-1 which will prevent load shed in the event of a extended outage on ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 15
Provided by: jennifers1
Category:

less

Transcript and Presenter's Notes

Title: Acadiana Load Pocket Project


1
Acadiana Load PocketProject
2
(No Transcript)
3
Project Background
  • Summer of 2002
  • load growth, changes to generation dispatch in
    the Acadiana Load Pocket (ALP) and reduced
    ratings on lines which were damaged during
    Hurricane Lili result in TLRs with in the ALP
  • Summer of 2005
  • Wells Substation was built which provided an
    additional source to the ALP and provided more
    import capability into the ALP
  • Summer of 2007
  • Company specific imports are established which
    reduce the number of TLR level 5s

4
Project Background Continued
  • SPP coordinates a joint planning effort with
    Cleco, Entergy and LUS
  • Group evaluates multiple options to fix
    reliability concerns and provide possible
    economic benefits
  • In January 2009 Cleco, Entergy, LUS reach
    agreement on a project to be built with each
    party having some responsibility for the
    construction.

5
ALP Reliability Concerns
  • Difficult to perform maintenance on transmission
    system even during off peak conditions (N-2)
  • Catastrophic loss of Teche 3
  • Operationally the configuration is N-1,G-1
  • Rolling blackouts within the ALP
  • Voltage concerns
  • 2012 N-1 Summer Peak overloads with all
    generation in the ALP online.
  • Rolling blackouts within the ALP.

6
ALP Project
7
Reliability Benefits
  • Plans the ALP to N-1, G-1 which will prevent load
    shed in the event of a extended outage on Teche 3
    or Bonin 3.
  • Creates additional 230 kV sources into the ALP
    which will provide maintenance and operational
    flexibility.

8
Economic Benefits
  • Majority of economic benefit will be in fuel cost
    savings for Cleco and LUS who currently have must
    run requirements on generation within the ALP
    during certain times of the year.

9
Construction Time line
10
Construction Time line
11
Construction Time line
12
Construction Time line
13
Construction Time line
14
Questions
Write a Comment
User Comments (0)
About PowerShow.com