IEOR%20E4405.001 - PowerPoint PPT Presentation

About This Presentation
Title:

IEOR%20E4405.001

Description:

Goal of airline industry: Maximization of Profits. ... Airline planning involves processes such as timetable, fleet assignment, crew ... – PowerPoint PPT presentation

Number of Views:11
Avg rating:3.0/5.0
Slides: 10
Provided by: fatima8
Learn more at: http://www.columbia.edu
Category:
Tags: ieor | airline

less

Transcript and Presenter's Notes

Title: IEOR%20E4405.001


1
  • IEOR E4405.001
  • Airline Crew
  • Scheduling
  • Presented by
  • Fatima Khalid

2
Scope
  • Goal of airline industry Maximization of
    Profits.
  • Requirement for reaching the goal Planning at
    strategic, tactical and operational levels.
  • Airline planning involves processes such as
    timetable, fleet assignment, crew pairing and
    crew assignment.
  • Note Focus of presentation Crew pairing and
    Crew assignment.

3
  • Research based on following papers
  • A Stochastic Programming Approach to the Airline
    Crew Scheduling Problem
  • Joyce W.Yen
  • An Optimization Approach to Solving the Airline
    Crew Pairing Problem
  • Amy Cohn and Shervin AhmadBeygi

4
Characteristics of Crew Scheduling Problem
  • Comprises of two components
  • Crew-Pairing Problem Assigning crew pairings
    (crew comprising pilot, co-pilot and flight
    attendants) to flights such that all flights are
    covered.
  • Crew Assignment Crews are assigned to given
    pairings. Most airlines use a kind of bidding
    system to assign pairings to crews.

5
Background on Aircraft Economics
  • Two costs components

6
IP Formulation Crew Pairing
  • Min Sp cp xp
  • st Sp dfp xp 1 for all f
  • xp E 0, 1 for all p
  • Terminology
  • Xp -gt is the binary variable taking the value 1
    if pairing p is included in the solution else the
    solution is 0.
  • dfp -gt is a binary variable with value 1 if
    flight is included in the pairing else 0.
  • Cp -gt cost of pairing p.

7
Solution to the problem formulated
  • First Approach Branch and Bound (as explained in
    class)
  • The Algorithm tries to find the optimal solution
    of the problem, that is root problem.
  • In case the optimal solution could not be found,
    the feasible region is then subdivided into sub
    regions and the algorithm is then applied to each
    respective sub-region, resulting in sub problems.
  • If an optimum solution is found to a sub problem
    it is feasible solution to the root problem but
    not necessarily globally optimal.
  • The optimal solution to the sub problem can be
    used to prune the tree.

8
Solution to the problem formulated
  • Second Approach Carmin Algorithm
  • This algorithm uses reduced costs and dual values
    to find the integer solutions.
  • The IP is formulated as unconstrained non-linear
    problem
  • The reduced cost is found by finding solutions to
    the equation ri c i yi where yi (ri- ri)
    / 2

9
Analysis
  • The advantage of using branch and bound over
    Carmins method is the confirmation of optimality
    that branch and bound solution has.
  • In addition, model doesnt change with duals
  • However, drawback is the lack in efficiency in
    finding the solution.
Write a Comment
User Comments (0)
About PowerShow.com