TRANSMISSION IMPACT OF KEYSTONE XL PIPELINE LOAD

Description:

TRANSMISSION IMPACT OF KEYSTONE XL PIPELINE LOAD. POSSIBLE SCOPE ... Big Bend-Whitten 230. Grand Island Line Tap. Possible Transmission Additions $344,250,000 ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 8
Provided by: A434
Category:

less

Transcript and Presenter's Notes

Title: TRANSMISSION IMPACT OF KEYSTONE XL PIPELINE LOAD


1
TRANSMISSION IMPACT OF KEYSTONE XL PIPELINE LOAD
  • POSSIBLE SCOPE OF REQUIRED ADDITIONS
  • July 2008

2
TransCanada 13 Pumping Stations 2012 Load
143MW, 11MW/Station 2014 Load 286MW,
22MW/Station
3
West ND Phase 2 Option 1
Williston-Dawson- Charlie Creek 230
Glen Ullen 345/230 Belfield 345
4
West ND Phase 2 Option 2
Williston-Dawson 230
Garrison-Tioga 230
Glen Ullen 345/230 Belfield 345
5
West ND Phase 2 Option 3
Ft.Peck-Williston 230
svc
Garrison-Tioga 230
svc
Glen Ullen 345/230 Belfield 345
6
West SD and NE
Caps
Big Bend-Whitten 230
Caps
SVC
2nd Stegall 345/230
Grand Island Line Tap
7
Possible Transmission Additions
!!Rough Estimates!!