BAE SYSTEMS - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

BAE SYSTEMS

Description:

Piloting COSYSMO within E&IS as part of common systems engineering estimation ... Piloting Workbook across the US and the UK sites. Collaborated with BAE Insyte, UK ... – PowerPoint PPT presentation

Number of Views:127
Avg rating:3.0/5.0
Slides: 4
Provided by: room78
Category:
Tags: bae | systems | piloting

less

Transcript and Presenter's Notes

Title: BAE SYSTEMS


1
BAE SYSTEMS
BAE Systems, Inc. Headquartered in Rockville,
Md. Three operating groups 10 billion annual
sales 45,000 employees
2
Piloting COSYSMO At BAE SYSTEMS
  • Involvement since early development
  • Working groups, Delphi
  • Contributed 10 data points
  • Piloting COSYSMO within EIS as part of common
    systems engineering estimation process
    development
  • Cross-check and Independent Cost Evaluation
  • Cross-LoB bids
  • Potential OG standard SE estimating method and
    tool
  • Developed Systems Engineering Estimation
    Workbook, using SystemStar front-ended with a
    data collection instrument
  • One process, one model, multiple calibrations
  • Collected close to 50 data points from all LoBs
    across US and UK
  • Continuing data collection effort
  • Piloting Workbook across the US and the UK sites
  • Collaborated with BAE Insyte, UK
  • Pilots and data collection

3
Lessons and Challenges
  • Divergence in data
  • Different products, different sites, different
    processes, different legacies
  • Lack of common way of defining work WBS
  • Your SE is not my SE
  • Your life cycle is not my life cycle
  • System of interest is not a common unit of
    measure nor is nominal requirement
  • English is an ambiguous language
  • I am building an LRU (a.k.a. box). How many
    scenarios do I have?
  • Answer 7500!!!
  • If you are wrong all the time, you are not
    wrong. Dan Ligett
  • Prepare to set a policy
  • Count in the way you intend to bid it
  • Clear and present challenges
  • Counting rules classification guidelines
  • Reuse
  • Requirement change
  • Common vs. customer WBS
  • Need a Management Champion
  • We just got started