Title: Jacob Chacko/Mike Kapuskar
1Jacob Chacko/Mike Kapuskar
- Fugro-Earth Mechanics Joint Venture
2SUSPENSION SPAN
- Geotechnical and Foundation Installation
Considerations
3Main Span - Geotechnical Explorations
4Main Span - Surface Conditions (Schematic)
5Main Span - Subsurface Conditions
6Main Span - Longitudinal Section
7Top of Franciscan Formation Bedrock
8Thickness of Young Bay Mud
9East Pier Foundations
- Footing
- Structural Steel Frames encased in Concrete
- Two Connected Octagonal Units
- 8 Piles per Unit
- Piling
- 106-meter long, 2.5-meter dia CISS Piles
- Piles are Vertical
- Concrete infill down to El. -54 meters
- Steel Shell wall thickness - 85mm to 45mm
Footing Layout TBA
10East Pier Area - Transverse Section
11UAM Paleochannel Sand
Thickness of Sand Layer
Top of Sand Layer
12Axial Pile Capacity- Pier E2-Westbound
13East Pier Construction Considerations
- Construction Issues
- Presence of 15 to 20 meters of Soft Near-surface
Young Bay Mud - Setup of Pile Capacity
- Increase in Soil Resistance to Driving during
Delays - May require Waiting Period prior to Application
of Construction Loads - Piles to be Driven through Dense Sand Layers
- Piles to be Tipped in Bedrock
- Key Special Provisions
- Requirement for a 1700 kJ primary Hammer
- Piles to be PDA monitored to
- Verify Satisfactory Hammer Performance and
- Reduce potential for Overstressing the Pile
- No Minimum Blow Count Requirement at Specified
Pile Tip Elevation - Piles driven to Specified Tip Elevation (or piles
encountering Refusal with Satisfactorily
performing hammer within 10-meters of Tip
Elevation) to be Accepted
14PIDP Results - Soil Resistance to Driving
- SRD values in Clay are less than Predicted Design
Capacity - SRD values can be predicted using published
Methods - Measured SRD Values for Continuous Driving
Generally correspond to Coring Case Predictions - Increased SRD during interruptions as Pile Setup
Occurs
15PIDP Results - Blow Counts
- With Adequate Hammers Piles can be Driven
(continuously) to Required Tip Elevations with
Reasonable Blow Counts - Increased Blow Counts observed during
interruptions - Measured Blow Counts for Continuous Driving
Generally agree with Coring Case Predictions
16Soil Resistance to Driving - Pier E2-Westbound
17Predicted Blow Counts
Menck - MHU 500
Menck - MHU 1700
18Tower Foundations
- Footing
- Octagonal Footing Layout
- 12 perimeter and 1 center Piles
- Pilecap is 22½ x 24 meters
- Piling
- Piles to be supported in Franciscan Bedrock
- Piling to be Unsupported down to El. -22 meters
- 2.5-meter dia. Permanent Steel Shell down to El.
-30 meters - 2.2-meter diameter rock socket below El. -30
meters - Total length of pile is 68 to 77 meters
- Rock sockets are 46 to 55 meters
19Tower Foundations
- Piling
- Piles to be supported in Franciscan Bedrock
- Piling to be Unsupported down to El. -22 meters
- 2.5-meter dia. Permanent Steel Shell down to El.
-30 meters - 2.2-meter diameter rock socket below El. -30
meters - Total length of pile is 68 to 77 meters
- Rock sockets are 46 to 55 meters
20Pylon Area - Longitudinal Section
21Pylon Area - Bedrock Surface
Top of Intensely Weathered Rock
Top of Slightly Weathered Rock
22Thickness of Weathered Bedrock
23Thickness of Fill in Cove Area
24Pylon Area - Transverse Section
25Pylon Construction Considerations
- No Blasting allowed in Project Permits
- Sloping Bay Floor and Bedrock Surfaces
- Piles to be Drilled through Variable Rock
Conditions including - Rock Fragments and Intensely Weathered Rock (may
cave) - Hard Fresh rock with qu gt 70 MPa
- Presence of Very Soft Clay Fill Near the Surface
- Temporary Casing to return Drilling
Fluids/Cuttings to the Surface - Requirement for Pile to be Unsupported Above El.
-22 meters
El. -22
El. -30
26West Pier Foundations
- 19-meter square, 10 meter thick Footings founded
in Franciscan Bedrock - Base of Footings - El. -4 to -6 meters
- Westbound Footing over Steep Slope
- Footing embedment of 9 to 26 meters (30 to 85
feet) - Design may include 10-meter long CIDH piles
beneath Westbound Footing - Footings to be Cast against Undisturbed Rock
27TRANSVERSE SECTION (West Pier W2)
28West Pier Construction Considerations
- Steep (45 - 55 degree) Ground Surface Slope at
Westbound Footing - Deep Excavations (up to 26 meters) into Very Hard
Sandstone (qu gt 70 Mpa) required for Footing
Construction - Blasting not Allowed in Project Permits
- Temporary Rock Slope Stabilization likely
Required During Construction - Potential for Seepage of Ground Water into
Excavation (Packer Test Data are available for
Design of Dewatering Facilities)
29Main Span - Temporary Towers
- Design and Construction Issues
- Tower Locations depend on Construction Sequence
- Tower Design by Contractorbased on geotechnical
information and design criteria from Caltrans - Presence of Torpedo House
- Variable Surface/Subsurface Conditions
30YERBA BUENA ISLAND
-
- GEOLOGY
- FOUNDATIONS
- CONSTRUCTION ISSUES
31YERBA BUENA ISLAND - Geology
32Northeast Point Hill (North Side)
33Northeast Point Hill (South Side)
34Northern Saddle Area
35Tunnel Approach Slopes (North Side)
36Tunnel Approach Slopes (South Side)
37YBI GEOLOGY
- Variable Terrain Subsurface Conditions
- Soil Rock Slopes
- Competent Soils, Hard Rock
- Extensive Soil Data
- (53) Soil Rock Borings 1,830 m, (17) CPT
300m - P-S Logs, Video Logs, Pressuremeter, Packer Tests
- Seismic reflection surveys, geologic mapping
- Laboratory strength tests
- Addl holes from 2 prior Caltrans SR Projects
- (2) YBI Site Characterization Reports
38LOG OF TEST BORINGS
39YBI GEOLOGY
- Major Geologic Units
- GRANULAR FILLS, up to 10m (af)
- w/ gravel, cobbles/boulders in USCG
- SEDIMENTARY ALLUVIUM, up to 40m (Qs/Qal/Qb)
- competent silty sands, some sandy silts clays
- LANDSLIDE DEBRIS (Qls, Qols)
- TRANSITION, decomp. rock/hard sandy clay, upto 5m
(Qbr) - BEDROCK, graywacke sandstone interbedded w/
siltstone/claystone (JKf)
40YBI GEOLOGY
Fresh Rock
Weathered Rock
41YBI GEOLOGY
Bedrock and Groundwater
42YBI GEOLOGY
WB TRANSITION ALIGNMENT
43YBI GEOLOGY
EB DETOUR ALIGNMENT
44YBI GEOLOGY
BENT W4
45YBI GEOLOGY
BENT W5
46YBI FOUNDATIONS
- Permanent Foundations
- (25) large ftgs w/ 80-150T W360x237 HP360x132
piles 15-20 m - (5) very large spread footings on rock
- (2-3) ftgs w/ 2.4/2.5 m CIDH Shafts in soil
rock upto 10 m
47YBI FOUNDATIONS
- Temporary Foundations
- (38) spread footings on soil or rock
- (50) 30-110T HP360x132 x108 piles 12 m
- (6) 16 OD Pipe piles lt 8 m
- 60-ton tiedowns at some footings
- (3) 24 dia. CIDH (w/ cantilever steel pipe ext.)
48YBI FOUNDATIONS
- Viaduct modifications
- (11) spread footings on soil w/ tiedowns
- (1) Footing on HP360x108 piles
- (5) Concrete shear key blocks under exist. walls
49YBI FOUNDATIONS
- Temporary excavation at Bent 48
- (2) Exist. ftgs underpinned (chemical grouting)
- Requires careful settlement monitoring,
- Hydraulic conductivity tests,
- Core extraction for qu testing
- (2) Temp. tieback walls w/ CIP conc. facing
- 15-ton anchors thru grouted blocks and
pilegroups -
50YBI FOUNDATIONS
- New retaining wall (Southgate Rd relocation)
- Exist. retaining walls remove/reconstruct
- New utility trench
51CONSTRUCTION ISSUES
Variable Soil,Rock Groundwater Conditions
52CONSTRUCTION ISSUES
Steep, Vegetated Slopes at EB2 EB3
1974 LANDSLIDES AT USCG SLOPES NOW RETAINED AND
REGRADED
SLIDE 98C
53CONSTRUCTION ISSUES
- Slope access?
- Shoring
- Install 80-110T HP360x or
- or 16 OD pipe piles w/ tiedowns
- Build pedestal footings, partially exposed
- or embedded w/ slurry backfill
54OTHER CONSTRUCTION ISSUES
- Challenging Site Access
- Nearby Archael./Historical Sites, Buildings
- Cobbly Fills _at_ USCG
- Rock Excavations
- Exist. Underground Utilities