PPMNSA Pakistan - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

PPMNSA Pakistan

Description:

PPMNSA Pakistan – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 12
Provided by: baghd
Category:
Tags: ppmnsa | aesc | pakistan

less

Transcript and Presenter's Notes

Title: PPMNSA Pakistan


1
PPM-NSAPakistan
  • PPM planning and budgeting workshop
  • Cairo 25-28 Feb 2007

2
Introduction Pakistan
NA Pop 1M DC 11
FATA Pop 3.7M DC 28
  • Country map and information

AJK Pop 3.7M DC 67
NWFP Pop 21.2M DC 181
Punjab Pop 87.4M DC 435
Balochistan Pop 7.8M DC 80
Sindh Pop 36.3M DC 205
3
TB Epidemiology
  • M/F ratio 49
  • Age trend 15-24 years - highest in numbers

4
Composition of Non-NTP structure
5
PPM rationale and tentative PPM objectives
  • 100 NTP DOTS coverage CDR still 50.
  • PPM projects elsewhere15 - 50 increase in CDR
  • Sizeable non-NTP sector, with high potential
    role.
  • Patients preferences non-NTP options.
  • New Stop TB Strategy enhanced scope of work.
  • PPP aims to
  • Enhance DOTS coverage and quality
  • Face new challenges (MDR, TB-HIV, Hospitals)

6
Utilization of health services
7
NTP preparedness-1
  • National strategic framework for PPP development
    a part of National strategic plan (2005 - 10)
  • PPM model and guidelines development exercise
    TAMA
  • PPM implementation incorporated in public budget
  • Coverage Nationwide
  • Allocation USD 8 M
  • Approach District-led partnership development
  • Strengthening nationwide EQA to support Public
    and Private sector providers.
  • DOTS implementation in Public sector
    satisfactory results

8
NTP preparedness-2
  • Multiple small-scale PPM implementation
    initiatives launched
  • Greenstar - franchising (GFATM)
  • PATA and AKHSP - network strengthening (GFATM)
  • MC and ASD - public sector strengthening through
    PPM (FIDELIS/EC)
  • TAF - ACSM in 20 districts (GFATM)
  • USAID supported PPM Initiative
  • NTP to scale-up the PPM implementation develop
    operational guidelines and materials

9
Preparedness of non-NTP providers
  • Pakistan Chest Society and Paediatric Society
    involved
  • Pakistan Medical Association and Family Physician
    Association contacted
  • ISTC endorsement process not yet started
  • Encouraging small-scale PPM experiences in TB
    control, FP, awareness raising, vulnerable
    populations.
  • Intervention with private hospitals development
    and implementation in selected districts of
    Punjab.

10
Regulatory environment
  • Anti-TB drugs easily purchased from the market.
  • TB notification not mandatory.
  • Almost no regulations (implemented) on
    establishment of private practice
  • Enforcement of the existing regulations very
    weak.
  • Way Forward
  • Short-term basis Peer-regulation (e.g. through
    PMA)
  • Long-term basis Participate in developing
    regulations and enforcement arrangements

11
Tentative task mix table
  • Main provider groups and their contribution
Write a Comment
User Comments (0)
About PowerShow.com