Title: Ann Arbor District Library
1Going GreenBuilding a Sustainable Library
- Ann Arbor District Library
- Malletts Creek, Pittsfield and the proposed
Northeast branches - Josie Parker
- Director
- parkerj_at_aadl.org
- www.aadl.org
2Sustainability Theme WHY?
- Sustainability is a new and critical Big Idea
- Resonates with customers
- Aids permitting process
- Planning process
- Storm water concerns
- Personal convictions about what is Right
3Sustainability and Civic Art
- Civic Art is.
- Public bodies have a duty to lead
- Libraries are key institutions in community
learning efforts
4Budget (and Irony)
- Sustainability Theme grew out of 00/01
embezzlement and financial crisis - Established firm budget footing and financial
controls - Branch building program Cashflow Financing
- 12-14,000 SF - 5.0 million each
- Evaluate sustainability within operations
- Building and Systems use less energy
- Personnel enable function at wide range of
staffing
5Malletts CreekSustainable Architecture
Carl Luckenbach, FAIA Luckenbach Ziegelman
Architects PLLC
6Public Entry
7View towards Reading Room
8Sustainable Design
9Winter
10Summer
11Vegetated Roof
12Glulam Structure
13Life Cycle Analysis
- Present Worth (PW) todays cost
- Annualized method equivalent uniform annual
cost method - Payback method
- Breakeven point
14Life Cycle Analysis
15Site Landscape
- Case Study
- Sandy soil
- 65 of site for native plantings
- Eliminated piping
- No irrigation required
- Vegetated roof
- Shared parking
- Fill site
16Site Landscape
Bio-Swale
Conventional
Total Life Cycle Costs (PW)
175,688 192,557
Total Life Cycle Costs (Annualized)
13,178 14,444
17Vegetated Roof
- Case Study
- Roof system design
- Conventional ballasted roof 11 lbs/s.f.
- Mallets Creek Library 15 lbs/s.f.Thermal
performance - Conventional roof R-19
- Mallets Creek Library R-30 min.
- Reduction of stormwater runoff
- 50 storm runoff
- 0 runoff in light rain
- Gutter and downspout spill onto grade
- Alternatives
- Standing seam metal roof
- Copper standing seam roof
Courtesy Charlie Miller, Roofscapes, Inc.
18Vegetated Roof
Vegetated Roof
Standing Seam Metal
Total Life Cycle Costs (PW)
263,132 264,229
Total Life Cycle Costs (Annualized)
19,737 19,820
19Energy HVAC Systems
Alternatives Fin-tube radiation DX cooling
Conventional controls Conventional roof
- Case Study
- Ground-mounted condenser unit
- In-building AHU
- Energy recovery unit
- In-floor radiant heat
- Roof R-value
- Capture sunlight for solar gain
20Energy HVAC Systems
Design with Energy Recovery
Conventional
Total Life Cycle Costs (PW)
231,145 448,069
Total Life Cycle Costs (Annualized)
17,338 33,609
21Spatial Quality
22Reading Room
23Site Planning Goals
- Storm water part of design early in process
- Reduce imperviousnessshared parking
- Minimize the use of Underground Structuresspend
money above ground - Use the Site Native Plants to Clean Storm Water
- Visitor experiences storm waternot hidden
24Storm Water Management
Roof-clean water
- Storm Water is Broken up for Appropriate
Management - Separate the clean from the dirty
- The path of the clean Storm Water flowing off
the roof
Parking Lot-dirty water
25Storm Water Management
- Move Storm Water along the Longest Path
- Increase Infiltration Groundwater Recharge
- Slow, Clean, Cool Storm Water
26Installation Issues
Materials
Contractor Experience
Specifications
Construction Sequencing
27- MonitoringCMI Grant
- Roof
- Bioswales
- Detention
- Measuring
- Pollutants (water quality)
- Water Quantity
- Vegetation
- Volunteer and professional
28One project can make a difference!
29Pittsfield Branch
30Pittsfield Branch
31Pittsfield Youth Area
32Pittsfield Circulation Area
33New Northeast Branch Site
34Northeast BranchElevations
Michael Guthrie, AIA Van TineGuthrie Studio of
Architecture
35Continuing Sustainability
- Each Site offers unique opportunities
- Site attributes will dictate which technologies
are applicable - Examine all viable options to develop a
sustainable design that works for the site and
for the local government - Work with experts who stay current on emerging
techniques
36Sustaining Sustainability
- Make an Organizational Commitment to creating a
Sustainable Community - Educate Staff, Boards, and the Public
- Plan to spend more up front
- Examine the sustainability of the entire
organization, not just facilities - Lead the way for your community
37Thank You! Josie Parker Director Ann Arbor
District Library parkerj_at_aadl.org