Simulation / Reconstruction Working group - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Simulation / Reconstruction Working group

Description:

Albedo gammas. Trigger. Level 1. Level 2/3. Reconstruction. Framework or ... Albedo protons (realistic) Sky sources. Reconstruction. Latest tracking. Latest CAL ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 10
Provided by: tob79
Category:

less

Transcript and Presenter's Notes

Title: Simulation / Reconstruction Working group


1
Simulation / Reconstruction Working group
  • Toby Burnett
  • University of Washington
  • 11-13 Jan 2000

T
2
Primary goals
  • Driven by written requirements
  • Clear separation of simulation/reconstruction
  • Allow migration to Geant4
  • Definition of data formats
  • Parameter system
  • Integrated Menus and command-line options
  • Reconstruction framework

3
Suggested Procedure
  • Create a topic list is it complete? Does it
    overlap other working groups? (A proposed one
    follows)
  • Topics are usually implemented as packages
  • For each item, prepare a document with
  • A description of the item
  • The current situation
  • Requirements for the new version
  • Relative priority
  • Person who has taken responsibility
  • Target date based on priority
  • Note that often we can, and should just copy
    someone elses solution, concentrating on what is
    unique to GLAST

4
List of Topics for discussion
  • Services
  • exception handling
  • parameters
  • error logging
  • persistency
  • n-tuple creation
  • Detector description geometry
  • Non-active
  • Active
  • Detector/Event/Recon display
  • Data formats
  • Raw to IOC
  • Digis input to recon
  • Recon output
  • GUI/command line options
  • Documentation
  • Simulation
  • Use GEANT4 (G4)
  • Realism Tracking configuration Validation
  • Nuclear interactions
  • Energy loss fluctuations
  • Background models
  • Proton direct albedo
  • Heavies
  • Albedo gammas
  • Trigger
  • Level 1
  • Level 2/3
  • Reconstruction
  • Framework or Architecture
  • Tracker
  • Calorimeter
  • ACD
  • Alignment/calibration

5
Example exception handling
  • Description
  • Represents need to notify user of an unusual
    situation, with (at least) two levels of
    severity.
  • Current practice
  • Globals warning and fatal write message to cerr,
    and/or dialog box, aborting in latter case
  • Requirements
  • Three severity levels info, warning, fatal
  • Control over logging
  • Easy generation of names
  • Discussion
  • There is a very complete package from FNAL,
    called Exceptions.
  • Priority high
  • Responsible person ?
  • Target date 1 Feb

6
Short Term Plan
  • Until CHEP2000 (Feb 14)
  • Finish repackaging, make code available for
    checkout (Toby, Paul)
  • Implement dlls, integrated testing (Toby ,
    Sawyer)
  • Decide reconstruction architecture (Traudl, Toby)
  • Integrate L3 prototype (Saywer, Dan)
  • Mar 1
  • New Tracker and Calorimeter code checked in and
    verified. (Jose, Arache)
  • He, CNO added to flux and gismo interactions
    (Arache, Toby)

7
Basic requirements
  • Maintain operational status while
  • Improving realism of material and digitization
  • Restructuring (packageizing) code
  • Introducing an architecture
  • Moving all constants to parameter files

8
Whither glastsim?
Geometry
Digitization
Irf
Raw
Simul
Recon
Source
Event
PostRecon (merit)
ntuple?
PSF, Aeff
9
Unsatisfied Requirements (to-do list)
  • Simulation
  • Nuclear interactions
  • Realism
  • Energy loss fluctuations
  • External geometric description
  • Alignment control
  • Enable G4 alternative
  • Background sources
  • Albedo protons (realistic)
  • Sky sources
  • Reconstruction
  • Latest tracking
  • Latest CAL
  • Define new architecture
  • Data
  • (Persistent service)
  • Raw data
  • Event (recon output)
  • Parameter handling
  • Documentation
  • Integrated tests
Write a Comment
User Comments (0)
About PowerShow.com