Gammasphere - PowerPoint PPT Presentation

About This Presentation
Title:

Gammasphere

Description:

Note: 68% P/T achieved on bench. ... Goal: Provide user with 101 Ge detectors on ... for annealing when FWHM 3 keV - anneal 15-20 detectors every 3-4 months. ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 14
Provided by: phy2
Learn more at: https://www.phy.anl.gov
Category:

less

Transcript and Presenter's Notes

Title: Gammasphere


1
Gammasphere
  • ATLAS Users Meeting
  • August 8, 2009

2
(No Transcript)
3
Detector Status
  • Goal Provide user with 101 Ge detectors on
    continuing bases (maximum possible at FMA).
  • Continued cycles of annealing, Ge detector
    becomes a candidate for annealing when FWHM gt 3
    keV - anneal 15-20 detectors every 3-4 months.
  • HV-Filters for segmented GS Ge detectors are
    no-longer available in market, and home-made has
    been tested and used.
  • BGO bases continue to fail. Prototype replacement
    for bases using surface mount components have
    been constructed. Replacement of bases to begin
    in 2010 (replacement parts on order).
  • Bottom line Gammasphere detectors are aging and
    need more attention to assure optimal use of
    device.

4
Experiments
  • A total of 18 experiments with 89 days (43 of
    total ATLAS running time) of beam time have been
    performed in FY08.
  • 15 Experiments have been performed in FY09.
  • 32 Gammasphere publications appeared thus in
    2008.

5
Recent Upgrades
  • New VME based acquisition system has replaced
    original DAQ.
  • Data can be written to USB drives.
  • Throughput issues for high-spin measurements have
    been addressed with new VME processor (T.
    Lauritsen and C. Lionberger).
  • Upgradeable path should allow us to write
    3Mbytes/sec of data equivalent to 6 Exabyte
    tapes writing simultaneously.
  • System is extremely stable (rarely crashes or
    hangs up).
  • Online ROOT based analysis package GSSort, has
    been developed using the Root package from CERN.
  • BGO base replacement to begin in 2010 not
    sooner due to long lead time on some parts.
  • Electronic logbook (ELOG) has been implemented.
  • Phase I construction of Digital Gammasphere has
    begun.

6
Gammasphere Limitations
  • Count Rate Limitations
  • processing time for Ge shaper is 10?sec which
    gives 6 pileup at 10,000 cps, 20 pileup _at_
    30,000 cps and 30 pileup _at_ 50,000 cps.
  • Solution reduce Ge shaping time allows higher
    rates. Measured resolution degrades from 2.3 keV
    to 3.0 keV when going from 10 msec to 2.3 msec
    processing time.
  • Trigger limitations
  • Gammasphere is dead for at least 25?sec for
    triggered events.
  • Single and 2-fold Ge triggers saturate
    Gammasphere rate capability.
  • Readout can only be aborted at main (300-1500ns)
    and late (6?sec)?
  • Solution flexible trigger incorporating
    triggerless option.

7
Digital Gammasphere
  • Decreasing processing time of Ge shaper from 10
    to 2?sec should allow Ge to run at 40,000 cps
    with same throughput.
  • Trigglerless option will improve throughput
    limits imposed by current trigger.
  • These upgrades would allow Gammasphere to take
    data in excess of 10 times current limited rates.
  • Adaptive pileup algorithm could increase
    throughput further.
  • Extended Gammasphere reach in these areas of
    interest.
  • 100Sn region
  • Z gt 100 ?
  • Exotic modes (Hyperdeformation)?
  • Competitors are implementing or retrofitting
    arrays with digitizers e.g. Juroball, Clarion,
    SeGA, Tigress, Gretina, Agata.

8
Digital Gammasphere
  • Met with GRETINA group to discuss using GRETINA
    digitizers as basis for digital Gammasphere (May
    2008).
  • Two stage plan
  • Digitize only high-resolution Ge channel and read
    as external data. Compton suppression done by VXI
    electronics (Phase I)?
  • Full digitization of both BGO and Ge detectors
    (Phase II)?
  • Submitted LDRD proposal to ANL for startup money
    (denied)?
  • Project seeded with 125k from PHY base budget to
    begin Phase I (June 09).
  • Project underway July 09 with GS scientific
    staff, Phil Wilt (PHY) and John Anderson (HEP).

9
Phase I - Instrument Gammasphere with Gretina
Digitizers
  • Instrument current Gammasphere electronics with
    Gretina digitizers.
  • 16 Gretina digitizer boards
  • 2 VME crates 6 backplanes (4
    digitizers/backplane).
  • 3 Gretina trigger modules.
  • New VXI board to sit in GS master crate to pass
    GS clock and trigger information to DGS.
  • System will also be stand alone and can be used
    with other detector systems i.e. 80x80 DSSD.

Provide
GS and DGS will take data simultaneously,
triggered by GS and using syncronized time
stamps. Recover GS pileup in DGS.
10
Phase II Full Digital Gammasphere
  • A Gammasphere module provides up to 10 signals
    for processing
  • 1 Ge central contact
  • 2 Ge outer contacts
  • 7 BGO signals
  • One Gretina digitizer card could instrument one
    Gammasphere Module.
  • Most expensive option 350k for digitizers
    alone.
  • Is full digitization of individual BGO energies
    necessary?
  • One Gretina digitizer card could instrument 3
    Gammasphere Modules
  • Digitize 3 signals, Ge central contact, 1 side
    channel, BGO Sum Energy
  • Generate externally BGO hit pattern to enable
    nearest neighbor suppression.
  • Individual BGO energies not available.
  • One Gretina digitizer card could instrument 2
    Gammasphere Modules
  • Digitize 5 signals - Ge central contact, 1 side
    channel, 3 multiplexed BGO signals (2,2,3)
    individual BGO energies available.

11
(No Transcript)
12
Slopebox Control (Phil Wilt)?
13
CARIBU and Gammasphere
  • Reaccelerated beams
  • Coulomb Excitation (Safe/Unsafe)?
  • Transfer
  • Deep Inelastic
  • Fusion Evaporation (?)?
  • Decay studies (gamma/beta)?
  • Decay from high-spin state
  • Angular Correlations - spins
  • Polarization (Gretina) multipolarity
  • New Equipment
  • Tape Station
  • Electron detectors - decay coincidence,
    multipolarity)?
  • Fast Scitillators (LaBrCe) state lifetimes
  • Plunger - lifetimes
  • Heavy-ion Counter (Super-Chico, Annular DSSD) -
    Coulex
Write a Comment
User Comments (0)
About PowerShow.com