Case Study
Chesterfield Borough Councils Operational
Services Division Project CHRIS (Chesterfield
Housing Repairs Information System) Selecting
the best IT solutions Planning the cultural
changes Delivering real improvements
NOMAD / J Howe /Nov 06
2
Operational Services Division
  • In-house contractor- Domestic Housing, Civic
    Industrial
  • General Building Construction Maintenance
    (joinery, plumbing, bricklaying, roofing,
    plastering, painting)
  • Heating and ventilation/gas fitting
  • Electrical installation and repair
  • Statistics
  • Wide client and skills base
  • 17m turnover
  • 220 f.t.e employees (160 craft/productive
    employees)
  • 34,000 responsive repair jobs 24,000 planned
    works orders p.a.
  • 6,000 jobs out of hours emergency repairs.
  • Appointments including evening/weekends are
    offered for all internal works and for certain
    external works orders.
  • Payroll Bonus scheme
  • Depot based stores, Vans with imprest stock
  • Purchases from local builders' merchants for
    non-stock items.
  • Specialist plant and equipment 130 fleet
    vehicles

3
Why change
  • Why change?
  • New Tender Specification Private Sector
    competitors
  • Reduce Cost Base
  • Improve Service Customer Satisfaction Levels
  • Efficiency Demands (Egan / Gershon)
  • What needed to change?
  • Identify key improvement opportunities
  • Update IT
  • Reduce Overhead Structure
  • Strive for excellence (ISO / IIP / EMAS)

4
How good / bad were we?
  • Benchmarks and Best Practice
  • Direct Works Forum (DWF)
  • Association of Public Service Excellence (APSE)
  • Yorkshire and Humberside DLO Managers Group
  • Beacon Authorities
  • Benchmarking Clubs - PS Net / Checkmate etc

5
Understand the business end to end
6
Understand the detail
7
Look for solutions
GPS ?
8
Create the Vision
Manage
Request
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
Complete
QA
9
Create the Vision
Manage
Request
Planning Software
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
Complete
QA
Mobile Handhelds Software
10
I.S. Requirements Specification
Item
Function
Process reference
Vendor Response
Importance
Mandatory
Do Job
11
Implement the vision
  • Plan the organisation cultural changes
  • New Procedures
  • Training in systems AND process
  • Marshall resources
  • Select System Vendor(s)
  • Measure Success
  • Modify
  • Re-implement
  • Roll-out
  • Re-measure Broadcast!

12
Ownership involvement
CBC Management Team
Steering Group
QITs
IT Specification Team
Communication Team
Procurement Team
Training Development Team
13
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
Material
Non- Emergency
  • 3 Planner Supervisors
  • Improved flexibility
  • More appointments
  • Combined visits

Do Job
Invoice
Complete
QA
14
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
Material
Non- Emergency
  • Pre-allocated stock to job
  • Materials automatically logged to job
  • Improved stock management
  • Positioned for e-procurement

Do Job
Invoice
Complete
QA
15
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
  • Improved Out of Hours Qualification

Complete
QA
16
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
Material
  • Improved WIP Control

Non- Emergency
Do Job
Invoice
Complete
QA
17
Benefit Projection
Manage
  • Home based
  • Lone worker
  • Reduced administration time
  • Reduced aborted calls
  • More jobs per day
  • 100 Rubbish collections
  • Reduced variances
  • Lower Fleet Vehicle costs

Request
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
Complete
QA
18
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
  • Reduced manual timecard payroll activity
  • Automated material invoice matching
  • Reduced invoice to council lag time
  • Reduced variance resolution
  • Reduced paperwork
  • Improved auditing

Material
Non- Emergency
Do Job
Invoice
Complete
QA
19
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
Complete
  • Improved Service to Tenant Client
  • Driver for further improvements

QA
20
Benefit Projection
Manage
Request
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
  • Reduced firefighting, better decisions
  • Opportunity to win external contracts

Invoice
Complete
QA
21
80 of ICT improvement projects fail
22
Best practice approach
Best
PROCESSES
Current
Worst
Time
23
Our new processes were not perfect
  • Run the new processes
  • Prevent old habits reappearing
  • Prevent work-arounds
  • Continuous improvement
  • Problem solving
  • Improvement targets
  • Roles and Responsibilities
  • Ownership through involvement

24
Some of the difficulties
  • Persuasion / selling job!
  • Leap of Faith - Elected Members and workforce
  • ICT integration harder than expected
  • Council systems new - interface delays
  • Big Bang approach
  • People issues
  • Implementation ran concurrent with major
    re-structure of service area - morale at a low
    ebb / much re-training needed
  • System discipline
  • Van Stocks
  • Hand-held use (training and repeat training)

25
Timetable
  • Sept 04 - GPS Introduced
  • Operatives working from home and enjoying greater
    flexibility
  • Better work life balance
  • Coping with out of hours appointments / reduced
    emergency call out costs
  • Jan 05 (Phase 1) - 24 Field Operatives with
    Hand-Helds
  • Plumbing, Gas Electrical Fitters
  • May 05 (Phase 2) - 38 more admitted to system
  • Bricklayers Joiners

26
System procurement
Prime contractor - Orange GPS - Orange
Fleetlink Main software application (Metrix) -
CSG Prolog Scheduler - CSG Prolog PDA
software application - Pervasic
27
Capital Outlay and Running Costs
The capital outlay and running costs for the
first 5 years is New technology (software,
hardware, licensing, GPS etc) 500k Training,
downtime and dual running costs 100k
28
GPS Costs
  • Project CHRIS total costs for 5 years
    (Net cost inclusive of
    implementation
    and applied discounts)
    600,000
  • Hardware software costs
    (following discount
    of 160k) 500,000
  • GPS fitted to 125 vehicles
    (GPS Inst and
    5 year running costs before discount)
    198,480
  • GPS (5 Year costs following
    proportional discount) 135,000
  • GPS
    (Cost per
    vehicle) 1,080/year

    (approx 3.00/day)

29
Annual Financial Savings
Initial savings have been realised on a phased
basis during the first 2 years of operation -
projected annual savings based on these results
are- Overhead staff savings of
243,400 Fuel Savings
24,100 Transport Savings
14,400 Productivity increases measured at
10.58 221,400 503,000
30
CHRIS - Cumulative Savings
31
Service improvements achieved (1)
  • 96.4 of all responsive repairs completed on
    time against far tighter targets
  • Void re-let times reduced by average of 20 days
  • Same volume of work produced by fewer employees
  • Gas service access problems improved through use
    of integrated systems
  • More Appointments offered (up to 95 of all work
    carried out by fixed or loose appointments)
  • Customer satisfaction has increased from 80 to
    91
  • Single visit completions achieved through
    improved co-ordination of multiple repair
    requests, better work scheduling, improved
    vehicle stocks and increased number of
    appointments

32
Service improvements achieved (2)
  • Right first time targets improved by on site
    electronic variation request / authorisation
  • Improved management control information (real
    time visibility)
  • Improved rubbish collection service
  • Reduction in fuel and paper use resulting in
    environmental benefits.
  • Lone worker safety and security enhanced by
    better control methods

33
Is the system sustainable?
  • Planned to have a 5 year life to match contract
    duration but has the capability for ongoing
    development especially into other areas of the
    Authority
  • Looking to refine and enhance some processes
  • Improved PDAs and network coverage by adapting
    to 3G
  • Text messaging service linked to appointments
  • On site copying of CP12 certificate etc
  • Pit stop approach for re-stocking vans
  • Electronic ordering of materials from suppliers
  • PDAs to be issued to surveyors for instant
    order raising in the field

34
Why does CHRIS appear to work when other systems
falter?
  • Well researched before embarked - best fit for
    Chesterfield
  • External assistance during feasibility and
    implementation stages
  • Bespoke specification - complete system
    integration
  • Operatives pay linked to correct use of system,
    no outputs no pay
  • Involved operatives, T Unions and back office
    staff from the start
  • Ownership - (QIT teams, focus groups, steering
    groups etc..)
  • Led end to end by senior managers - (needs drive
    and enthusiasm)
  • Regular reviews and corrective actions
  • Linked to scope of ISO QA Scheme - complete
    re-write of systems procedures
  • Data dump/fault logs - griping sessions - Team
    Briefings with regular feedback

35
Project CHRIS - Some external achievements to
date.
  • Winner - IMBM - The British Building
    Maintenance Awards 2006
  • Winner of APSE Best Efficiency Initiative
    2006
  • Seen by IDeA as an E -Gov Best Practice Model
  • Used by Audit Commission as an example of
    Notable practice and forms a benchmark for UOR
    VFM comparisons
  • Has helped to attain and maintain BS EN ISO
    9001 2000 / I.I.P EMAS
  • NOMAD case study

36
End of Presentation
Thank you for your interest
37
Ring-fence our sphere of influence
38
Identify current process problems
39
Create the Vision
Manage
Request
Planning Software
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
Complete
QA
40
Create the Vision
Manage
Request
Planning Software
Schedule Job
Client
Emergency
Material
Non- Emergency
Do Job
Invoice
Complete
QA
Mobile Handhelds Software
41
Create the Vision
Manage
Request
Planning Software
Schedule Job
Client
Emergency
Automatic Scheduling
Material
Non- Emergency
Do Job
Invoice
Complete
QA
Mobile Handhelds Software
42
Look for solutions
43
Create the Vision
Management Reporting
Manage
Request
Planning Software
Schedule Job
Client
Emergency
Automatic Scheduling
Material
Non- Emergency
Do Job
Invoice
Complete
QA
Mobile Handhelds Software
44
(No Transcript)
45
Schedule/Planning
46
Schedule/Planning Board
These Operatives shown as on Holiday for this
period
47
J SMITH
01246 452146
GEORGE
22/8/2006
48
(No Transcript)
49
THE MOBILE DEVICE
THE MOBILE DEVICE WHICH IS USED BY THE OPERATIVES
TO RECEIVE THEIR WORK
50
WHAT THE OPERATIVE SEES
ADDRESS AND JOB DETAILS
APPOINTED JOB FOR MONDAY AT 8.00am
ACCESS NOTES
51
WHAT THE OPERATIVE SEES
ACCESS NOTES DETAILS
52
WHAT THE OPERATIVE SEES
TENANT DETAILS
ACCESS DETAILS
53
WHAT THE OPERATIVE SEES
RELEVANT JOB DETAILS
OPTION TO ORDER MATERIALS IN ADVANCE FROM STORES
54
WHAT THE OPERATIVE SEES
Renew double base unit 2/5/2006 Repair
double socket in kitchen
15/6/2006 Replace damaged
sink base unit (TEAK Effect)
5/9/2006
PREVIOUS ASSOCIATED REPAIRS
55
WHAT THE OPERATIVE SEES
OPERATIVES OPEN UP THIS SCREEN ONCE ON SITE AND
HAVE THE FOLLOWING OPTIONS AVAILABLE TO THEM
56
WHAT THE OPERATIVE SEES
CONFIRMS ON SITE AND STARTS WORK
57
WHAT THE OPERATIVE SEES
RECORDS MATERIALS USED ON THE JOB FROM THE VAN
STOCK
58
WHAT THE OPERATIVE SEES
CONFIRMS THE JOB HAS BEEN COMPLETED
59
WHAT THE OPERATIVE SEES
RECORDS THAT RUBBISH HAS BEEN CREATED AND
REQUIRES REMOVAL
CONFIRMS THE ACTIVITY ON SITE
60
WHAT THE OPERATIVE SEES
THE OPERATIVE CONFIRMS THE JOB IS COMPLETED
TENANT SIGNS TO SAY THE JOB IS COMPLETED AND IS
TO THEIR SATISFACTION
61
WHAT THE OPERATIVE SEES
JOB COMPLETED OFF THE JOB LIST
62
WHAT THE OPERATIVE SEES
RUBBISH JOB HAS NOW BEEN ISSUED TO THE RUBBISH
TEAM ON THE DEVICE FOR COLLECTION
63
(No Transcript)
64
(No Transcript)
65
(No Transcript)
66
GPS VEHICLE TRACKER
67
GPS VEHICLE TRACKER
LOCATION OF VEHICLE
68
(No Transcript)
69
Crystal Report
Write a Comment
User Comments (0)