Kings Cross St Pancras - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Kings Cross St Pancras

Description:

Presentation to HST 4 i and Connect ... Interface with Great Northern Hotel and Argent Development ... LCR, Argent, DfT, Network Rail, TfL, GLA and Camden ... – PowerPoint PPT presentation

Number of Views:421
Avg rating:3.0/5.0
Slides: 15
Provided by: gas106
Category:
Tags: argent | cross | kings | pancras

less

Transcript and Presenter's Notes

Title: Kings Cross St Pancras


1
Kings Cross St Pancras
2
  • Kings Cross St Pancras Interchange
  • Presentation to HST 4 i and Connect
  • Project Visit
  • 8 December 2005
  • Helen Beaumont (TfL Interchange Programme)
  • and Mike Crabtree (LUL)

www.tfl.gov.uk/interchange
3
Kings Cross St Pancras Overall Plan
4
Aims and Challenges
  • Aims
  • To create an world class International Gateway
    and London Terminus
  • New transport infrastructure and public realm
  • Channel Tunnel Rail Link (CTRL)
  • London Underground (LULL station enlargements
  • New Thameslink Station
  • New Network Rail station concourse
  • Cross River Tram
  • Olympic services
  • Incorporation of surface facilities and good
    design
  • Regeneration of Railway Lands

5
Challenges
  • Numerous Stakeholders
  • LCR, Argent, DfT, Network Rail, TfL, GLA and
    Mayor and Camden
  • Ambitions and timescales
  • Finance
  • Planning mechanisms
  • Land ownership
  • Phasing of Construction

6
Passenger Demand Morning 3 hour peak arrivals
2004
  • Kings Cross 15,000
  • Kings Cross suburban 11,000
  • Kings Cross Intercity 4,500
  • St Pancras (MML) 4,000
  • Kings Cross Thameslink 7,000
  • London Underground 6 lines 2 way total 65,000
    grown from 55,000 in 1999
  • Overall Total around 90,000 passengers

7
2016 Forecast Demand Morning 3 hour peak
  • St Pancras arrivals (33,000)
  • CTRL International 5,000
  • Kent Services - 8,000
  • Mainline 4,500
  • Thameslink 15,000
  • Kings Cross arrivals (12,000)
  • Intercity 8,300
  • Suburban 2,000
  • London Underground 2 way total 102,000
  • Overall Total around 147,000 passengers

8
Current Works
  • LUL Phase I Ticket Hall Opening 2006
  • Channel Tunnel Rail Link (CTRL) completion 2007
  • Privately funded
  • St Pancras International services opening 2007
    (privately run)
  • Kent domestic services opening 2009 Government
    funded
  • Olympics 2012 Javelin service to Stratford
    Station Government fund

9
Transport Proposals
  • LUL Phase II (Northern Ticket Hall)
  • National Rail Kings Cross Western Concourse
    Integrated design developed to improve cost
    efficiencies to be funded by Rail Network
  • Thameslink Box Fit Out TfL and Mayor seeking
    funding to complete fit out by 2007/8
  • Cross River Tram (CRT) Terminus location
    identified between stations, within Development.
    To be funded by TfL

10
Surface Interchange Proposals
  • Cycle park for 900 cycles
  • Cycle access
  • 2 way bus movements maintained
  • Taxi facilities for 2 stations
  • Pedestrian areas and public realm
  • TfL leading preparation of Joint Masterplan

11
Network Rail Western Concourse Proposal
12
National Rail Western Concourse
  • Kings Cross station concourse currently a
    temporary building
  • Currently operating at full passenger capacity
  • Network Rail (Rail Infrastructure body) has
    developed proposals to build a new, larger
    concourse to the west of the station, by 2012
  • Planning Application expected by end of 2005
  • Requires approval of business case (with LUL
    Phase II) by Office of Rail Regulator, for
    funding
  • Interface with Great Northern Hotel and Argent
    Development

13
Kings Cross Central Development Proposals
  • Railway Lands Planning Application (Kings Cross
    Central)
  • Under negotiation with TfL, Mayor and Local
    Authority
  • Impacts on the interchange layout between the
    stations and demand for transport services
  • Mixed Use development approx 750,000 sq metres
    office, retail, residential, leisure and
    community

14
Integration, Public Realm and Urban Design
  • Mayor requires a world class interchange
  • Mayor has a Statutory Planning role
  • Need to improve overall integration between
    Stakeholders
  • LCR, Argent, DfT, Network Rail, TfL, GLA and
    Camden
  • Strategic Forum set up to assist programme
    coordination
  • Led by TfL Interchange Team
  • Need to finalise design and funding