Andy Inglis Dallas, October 10, 2005 SPE ATCE Chairmans Address - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Andy Inglis Dallas, October 10, 2005 SPE ATCE Chairmans Address

Description:

First of a kind wide azimuth towed streamer survey in 2005. Multi-boat acquisition with Veritas ... Narrow Azimuth Acquisition. BP Wide Azimuth Acquisition ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 14
Provided by: martin247
Category:

less

Transcript and Presenter's Notes

Title: Andy Inglis Dallas, October 10, 2005 SPE ATCE Chairmans Address


1
Andy Inglis Dallas, October 10, 2005SPE ATCE
Chairmans Address
  • The role of technology in securing sustainable
    clean energy

2
energy security role of technology
  • focused technology leadership
  • moving the technical limit
  • leveraging knowledge
  • applying at scale

3
focused technology leadershipadvanced seismic
imaging
Autonomous Ocean Bottom Seismic Sensors New
seismic acquisition hardware - collaboration with
Fairfield Industries
Novel Seismic Acquisition
First of a kind wide azimuth towed streamer
survey in 2005. Multi-boat acquisition with
Veritas
Complex Salt
Innovative Seismic Processing Combine in-house
expertise and contractor capability to deliver at
scale
Standard Narrow Azimuth Acquisition
BP Wide Azimuth Acquisition
Z3000
Poor, variable illumination
Superior, uniform illumination
4
energy securityreplacing reserves
BP reserves replacement ratio (3yr rolling
average)
Replacement ratio extensions and discoveries
average 2000-04
200
1.4
BP
1.2
150
1.0
Total
0.8
100
0.6
CVX
Shell
0.4
50
XOM
0.2
0
0.0
0
1
2
3
4
96
97
98
99
00
01
02
03
04
finding cost (/boe)
Source company reports subsidiaries only
5
moving the technical limitextending the drilling
envelope
Lateral (k ft)
0
10
20
30
40
0
5
1995
A18
10
Amberjack A32
2000
2005
15
Vertical (k ft)
20
Wytch Farm
25
Thunder Horse
GoM Exploration
30
35
6
leveraging expertise
  • Sharjah Coiled Tubing Drilling
  • Pioneering technology developed in Alaska
  • Successfully transferred from Alaska to Middle
    East
  • 140 sidetracks drilled from 32 wells to date

BP acquisition
Daily Production (mboed)
Jan-65
Jan-70
Jan-75
Jan-80
Jan-85
Jan-90
Jan-95
Jan-00
Jan-05
  • Cerro Dragon
  • Application of BPs seismic, reservoir
    description, petrophysics and waterflood
    expertise resulting in
  • proved reserves up 70
  • production rate more than doubled

7
applying at scaledeveloping the ACG field
Baku-Tbilisi-Ceyhan (BTC) Pipeline
Azeri, Chirag, Gunashli (ACG) Field
Sangachal
Gunashli
Chirag
West Azeri (WA)
Central Azeri (CA)
East Azeri (EA)
Elevation
Innovation through Standardisation
  • Worlds longest oil pipeline, traversing three
    countries, 14 seismic faults and gt1500
    watercourses
  • One of the largest oil terminals in the world
  • Well, platform and facilities infrastructure to
    deliver gt1 million barrels of oil per day

Direct Engineering Costs ()
Construction Cycle Time
8
sustainable energy supply CO2 capture and
storage at In Salah
9
sustainable energy supplyhydrogen power station
Demonstration plant in Peterhead, Scotland
10
mutual advantage
  • collaborative research and development
  • partnerships with academia
  • building local capability

11
mutual advantangepartnerships with academia

12
mutual advantage - building local
capabilityTrinidad and Tobago Cannonball
platform
La Brea, October 2003
La Brea, February 2005
13
Andy Inglis Dallas, October 10, 2005SPE ATCE
Chairmans Address
  • The role of technology in securing sustainable
    clean energy
Write a Comment
User Comments (0)
About PowerShow.com