Title: HARPS-NEF PDR


1
HARPS-NEF Program
  • Project Manager
  • Tim Norton

2
HARPS NEF Project Teams
  • Harvard University
  • Funding through the Harvard University Origins of
    Life Initiative
  • Overall Instrument Responsibility at the Center
    for Astrophysics
  • Harvard College Observatory
  • Smithsonian Astrophysical Observatory
  • Geneva Observatory
  • HARPS Design Background
  • Science and Engineering Resource Contributor
  • Major Funded Hardware Contributor
  • INGs William Herschel Telescope
  • ING Facility Operations as agreed thru MOU

3
HARPS-NEF Program Schedule
4
Schedule Comments
  • Fast schedule to Build/Assemble/Test relies on
    significant reuse of design
  • Orders MUST be placed in January with expected
    9-12 month lead times for gratings/grisms/optics
  • Procurements before CDR of items with 4-6 month
    lead times (i.e. major machining)
  • Installation at WHT requires early facility
    agreement/processing
  • Design verification requires early prototype
    and/or field work ( i.e. fiber run/rotator)

5
Budget Overview
  • Commitment from Harvard
  • Geneva Proposal Accepted for Hardware Funding
  • Status of Major Capital Expenditures
  • CCD order placed with E2V
  • Cryostat Build at ESO in Process, Model Delivered
  • Calibration Light Box Fabrication in Process
  • RFQs submitted/received responses
  • Echelle Grating (ASz prepared Spec RFQ)
  • Cross Dispersion Grism (ASz prepared Spec RFQ)
  • Collimator Parabola (ASz working alternate
    vendors)
  • Camera Optics (RFQ updates in process)

6
ING/WHT Facility Questions
  • Facility Modifications and Installations
  • What does the ING/WHT require in terms of
    building modification processes, documentation,
    building code review, inspection or other?
  • Does the ING/WHT recommend we use local
    contractors or can we make arrangements for staff
    support?
  • Site preparation, electrical preparation, general
    labor for construction services
  • Prototype of Fiber Routing
  • Will access to the WHT be available for
    prototyping?
  • When is the best time (least impact to WHT
    operations)?