SiD Muon System H.Band - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

SiD Muon System H.Band

Description:

Late compared to other concept detectors and SiD systems. However, ... Bakelite RPCs. 4/6/09. H. Band - U. of Wisconsin. 6. Workshop Goals. Two main goals ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 8
Provided by: henry67
Learn more at: https://docdb.fnal.gov
Category:
Tags: sid | bakelite | band | muon | system

less

Transcript and Presenter's Notes

Title: SiD Muon System H.Band


1
SiD Muon SystemH.Band
2
SiD Muon System
  • SiD Muon detector effort is starting at this
    workshop
  • Co-conveners - Gene Fisk H. Band
  • Late compared to other concept detectors and SiD
    systems
  • However,
  • Differences in muon detector requirements for
    the different concepts are small
  • Many ILC muon studies to build on
  • Muon Mini workshop next week
  • Chance for real contributions by participants

3
SiD Muon Design
  • Overall size set by other components of SiD
  • ECAL HCAL Solenoid 6L
  • Total steel thickness of 2.4 m needed for flux
    return 14L
  • Total area 5000-15000 m2 depending on of layers

4
Muon Detector Design Questions
  • Assume momentum measured in central tracker
  • What spatial resolution is needed to match tracks
    coming from calorimeter?
  • Isolated
  • Inside jets
  • Will the detector be useful as a tail catcher for
    hadron showers?
  • If so, what segmentation is appropriate
  • How many layers are needed?
  • 32-24-12 ?
  • Are there serious backgrounds?
  • Muon halo
  • Neutrons?
  • Outer endcap layers?

5
Technology Choices
  • The usual arguments apply
  • Large area gtgt inexpensive
  • Hard to replace gtgtreliable
  • Many technologies have been used
  • Extruded scintillator
  • Glass RPCs
  • LSTs
  • Bakelite RPCs

6
Workshop Goals
  • Two main goals
  • Identify and organize interested people
  • Understand detector requirements
  • What are relevant physics benchmarks?
  • HZ,smuons, BB jets
  • Would prefer that requirements dictate design
    choices
  • 15 people have expressed interest in SiD and Muon
    - good base if they came to work
  • Room for many others to contribute

7
Parallel Sessions
  • First meeting of interested participants
  • Wed 830 Jewel(?) Meeting room
  • Other times to be scheduled as needed
Write a Comment
User Comments (0)
About PowerShow.com