ESR RPC Link Warsaw 8'7'03 - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

ESR RPC Link Warsaw 8'7'03

Description:

Barrel: 60 LBB i.e. 12 / wheel distributed around yoke. End caps: 48 LBB distributed around disks. 12 LBB in HE ... Cut Italian Bakelite delivered to Korea ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 22
Provided by: walterva8
Category:
Tags: esr | rpc | bakelite | link | warsaw

less

Transcript and Presenter's Notes

Title: ESR RPC Link Warsaw 8'7'03


1
ESR RPC Link Warsaw 8.7.03
  • RPC Link Board Integration
  • FW RPC installation schedule

2
Link Board Box Integration
  • Initially
  • Barrel 60 LBB i.e. 12 / wheel distributed
    around yoke
  • End caps 48 LBB distributed around disks
  • 12 LBB in HE cutout zone for RE1/1
  • ? Keep cable length short ( ? 12 m )
  • Boxes require cooling ( 250 W )
  • safety - grounded shield ( metallic box )
  • - smoke detection
  • - N2 inertion
  • ? Complicated project for 10812 boxes with up to
    96 cables/box
  • ? Engineering design in Finland
  • ? Cost and production in nobodys scope

3
January 2003 _at_ Warsaw
  • 108 LLB to become 6 U VME like crates ( mechanics
    ) put inside standard CMS racks on the metallic
    structures
  • ? Cooling safety provided by CMS racks
  • ? Points of concern ( mainly in barrel)
  • - length of skew clear cable
  • - space in the racks on the metallic structures
  • 12 LLB for RE1/1 remain special
  • - choke point occupancy
  • - cable length

4
HE cutout zone
5
Skew of Kabelwerk cable
F.Loddo , A.Ranieri
6
Degradation of signal
F.Loddo , A.Ranieri
7
Cabling RE1/2 and 1/3 signalsLink Board Boxes in
Racks
L max 11.5 m
8
YE-1 Racks on Towers
9
YE-1 Racks on Towers x side
10
Barrel cabling
S.Bally
11
Barrel cabling
12
Rack occupancy YB0
13
Rack occupancy YB1
14
Rack occupancy YB2
15
RE production and installation
  • Initial RE system tailored to fit within the
    available budget
  • 3 RPC stations at low ? i.e. RE1/2,3 ( China )
  • RE2,3/2,3 ( Pakistan )
  • 1 HV channel/chamber modules in USC ( CAEN )
  • - magnetic field radiation tolerances
    irrelevant
  • - easy upgrade as new funds become available
  • 2 LV channels/chamber ( analog digital )
  • - 48V provided by AC-DC converter to distri mods
    in racks

16
The proposed initial system
17
Coverage of initial system?4 stations up to
1.24 3 up to 1.6
18
Initial system
19
Gap production schedule
?
?
?
20
Schedule YE1
21
Status summary
  • Cut Italian Bakelite delivered to Korea
  • for 20 FW RPC pre-series according to EDR
    recommendation
  • Korean oiling facility ready being commissioned
  • Gap production schedule in accordance with CMS
    V33
  • RE installation schedule
  • station 1 is critical since behind CSCs
  • station 3 installation underground
  • LBB only RE1/1 ( 12 special boxes ) on critical
    path
  • all other LBB in crates fitted in the racks on
    the metallic structures
Write a Comment
User Comments (0)
About PowerShow.com