2Heat Exchangers 2 3 years old
3Reasons for measuring CO2?
- By-product of combustion ( gt1ppm)
- Equipment warranty, cost and complexity
- Many existing commercially available meters
- Simple and direct process
- Portable instrumentation
4Propane Emissions1-AP -42 Compilation of Air
Pollutant Emission Factors Vol. 1 - Stationary
Sources USEPA, 5th ed. Section 1.5.
- CO2 12500 lb/1000 gallons
- NOx 14 lb/1000 gallons
- 1 ppm NOx 1 ppm TSNA
- Thereforegtgtgtgtgtgtgt
- CO2 893 ppm
- NOx 1 ppm
Crack
Typical Ambient CO2 Levels 300 450 ppm
5Effect of Fuel Source on TSNA
- Burner TSNA NOx
- Barn Type Configuration (ppm) (lbs) (kg)
- RD Electric Heat Exchange 0 n/a n/a
- RD LPG Direct-fired 2 0.4 0.18
- Commercial LPG Direct-fired 13 2.5 1.14
Flue-Cured Tobacco, 1998
6Direct Fired LP 5,400 9,000 ppm CO2 Pilot
Light Only 700 ppm CO2
7Direct Heat
Heat Exchanger
Heat Exchanger
8Barn Testing Procedure
- Barn must be empty
- Connect the CO2 meter to a 120 volt source and
allow a 10 minute warm up period - Close all air dampers to allow recirculation
- Place probe through front exhaust vent or viewing
port on back wall into air stream
9Close all fresh air dampers
10Insert Probe in Curing Air stream after Heat
Exchanger
11Barn Testing Procedure
- Measure Ambient CO2 after 5-10 minutes
- Set thermostat 30-40oF above outside air
temperature (maximum 140oF) - Measure CO2 after 5-10 minutes
12CO2 Meter Results
- If ppm increases lt 100 No cracks
- If ppm 200-300 possible small leaks (check
again later in season or next season) - If ppm increase by a factor of 2 or more (gt900
ppm) inspect closely for cracks and repair or
replace heat exchanger and Notify Heat Exchanger
Manufacturer
13Detecting Heat Exchanger Leaks
- Examine combustion chamber and all welds.
- Remove heat exchanger and examine closely
(Bright flash light) -
14Check all Exhaust Flue connections within Curing
chamber
Use high temperature sealant- 2,300oF to
repair?????
15Stack height should be 24 inches above the
highest point of roof line
Repair Flue Pipes
16CO2 Meters