Title: Missing Measures and Compliance Elements Standard Drafting Team CESDT


1
Missing Measures and Compliance Elements Standard
Drafting Team (CESDT)
  • Team Members
  • Maurice Casadaban (Chairman) Entergy
    Services
  • John Blazekovich (Vice Chairman)
    Commonwealth Edison
  • Robert Millard Mid-American
    Interconnected Network
  • Norbert Mizwicki Mid-American
    Interconnected Network
  • Narinder Saini Entergy Services
  • Charles Waits Michigan Electric
    Transmission
  • John Wolfmeyer Southeastern Electric
    Reliability Council
  • Other Contributors
  • Benedict Deutsch (Former Chairman) NERC
    (Formerly with MRO)
  • Joseph Wilson PJM Interconnection
  • Dick Worthen Southeastern Electric Reliability
    Council
  • Ed Davis Entergy Services
  • Ev Lucenti Power Decisions Consulting
  • Maureen Long NERC
  • Ed Ruck NERC
  • Richard Schneider NERC

2
SAR Development (SAR - Standard Authorization
Request)
  • Develop Compliance Elements for 22 Standards
  • Measures
  • Compliance Monitoring and Data Retention
  • Levels of Non-Compliance
  • Industry comments said no changes to the
    Requirements
  • NERC Standard Committee (SC) directive to
    compress the schedule from 4 years down to 1 year.

3
Standards Development - CESDT
  • Develop a template for all 22 standards
  • On 2/17/06 the CESDT posted one standard
    (COM-001)
  • Modify all 20 standards based on template
  • (Note INT-002 was retired and VAR-001 was
    picked up by another team and therefore these
    were removed from the CESDTs list)
  • On 4/21/06 CESDT posted 20 revised standards
  • Incorporate changes based on industry comments
  • On 7/10/06 CESDT posted 20 revised standard
  • Included Implementation Plan with posting
  • The CESDT recommended balloting with minor
    changes to the standards
  • SC approved standards for balloting on 9/5/06

4
CESDT Minority views
  • To prove compliance an entity shall provide
    evidence that could include, but is not limited
    toor other equivalent evidence
  • Delay balloting until Requirements are improved
  • Ballot standards individually
  • Modify Levels of Compliance to match the
    Sanctions Guidelines filed with the ERO
    application