ISM Commercial Yachts - PowerPoint PPT Presentation

1 / 30
About This Presentation
Title:

ISM Commercial Yachts

Description:

Why do we need to give a Seminar on ISM for IOM yachts. ... Bilge pumping. Emergency Fire Pump. Emergency Lighting. Emergency Steering Gear ... – PowerPoint PPT presentation

Number of Views:146
Avg rating:3.0/5.0
Slides: 31
Provided by: simc6
Category:
Tags: ism | bilge | commercial | yachts

less

Transcript and Presenter's Notes

Title: ISM Commercial Yachts


1
ISM - Commercial Yachts
  • Isle of Man Marine Administration

2
ISM
  • Why do we need to give a Seminar on ISM for IOM
    yachts.
  • What do we want to see on IOM yachts during the
    External Audit.
  • What can be done to help IOM yachts meet and
    maintain an acceptable standard.

3
WHY (a Seminar on ISM)
  • During External audits of some IOM yachts we have
    found a considerable number of areas where there
    is little or no EVIDENCE to show that the Safety
    Management System onboard meets the ISM Code or
    that the procedures of the SMS are being
    followed.

4
Problem Areas
  • Document Control
  • Masters Review
  • Passage Planning
  • Safety Officer - Responsibility and Duties
  • Drills not done - especially when on Charter
  • Critical equipment not identified
  • No planned maintenance system in place
  • Lack of ISM knowledge or formal training
  • High turn around of staff

5
What (do we want)
  • We want to be proactive and help the Industry
    raise the standards.
  • We want to encourage an effective Safety Culture
    where following the SMS system is second nature.
  • We want to encourage the use of Simple and
    effective SMS Systems.
  • We want the co-operation of the Industry to
    effectively manage and implement their SMS
    systems onboard and in the office.

6
Internal Audits
  • A tool used to monitor how well the SMS system is
    implemented onboard.
  • Internal Audit should be carried out at least 4
    weeks prior to External Audit.
  • This allows some corrective actions to be carried
    out from the findings of that audit on NCs and
    Observations.
  • Shows EVIDENCE of the SMS working and that the
    procedures are being followed.
  • DPA Involvement in corrective action and feedback
    to the ship.
  • Possible changes to SMS System ?

7
External Audits
  • Audit against what is required in the
    International Safety Management Code.
  • Audit against the Safety Management Procedures in
    the SMS onboard.
  • Looking for EVIDENCE onboard to show that it
    meets both ISM Code and SMS Procedures.

8
EVIDENCE
  • Written EVIDENCE
  • Physical EVIDENCE
  • Oral EVIDENCE

9
EVIDENCE
  • Written in the form of completed SMS forms,
    checklists, logbook entries, minutes, emails,
    Internal Audit reports, non-conformances and
    corrective actions.
  • Physical in the form of the Yacht Inspection and
    a Drill by the crew.
  • Oral confirmation from the crew during the audit.

10
External Audits (format)
  • Opening Meeting
  • Document Review
  • Audit
  • Audit Review
  • Discussion of Audit Findings
  • Closing Meeting

11
Opening Meeting
  • Held onboard with as many of the crew available
    to attend.
  • Explanation as to what the ISM Audit is for and
    that we are looking for EVIDENCE that shows the
    SMS is being used onboard.
  • Sampling Process.
  • Confidential.

12
Document Review
  • Normally with the Master.
  • Last Internal Audit, External Audits and
    findings.
  • Masters Duties and Responsibilities.
  • Yachts Certificates, Crews Certification, IOM
    Endorsements, Medicals checked at same time.
  • Safety Management System any changes or
    revisions, how document control is handled.
  • Policy Statements.
  • DPA Function and who she/he is with contact
    details.
  • Safety Committee Meetings, minutes of the
    meetings, safety issues raised, reporting
    feedback with DPA.
  • Masters Review.
  • Any problem areas.

13
Audit
  • To include as many of the crew as possible, will
    include all officers.
  • Responsibilities and duties onboard and how they
    carry them out.
  • EVIDENCE that the crew know and are using the SMS
    onboard.
  • Accident and/or near miss reporting.
  • Garbage Management Plans.
  • Familiarisation Training.
  • Safety Drills.

14
Audit Areas of particular Interest
  • Safety Officer Duties.
  • Planned Maintenance System.
  • Passage Planning.
  • Permit to Work System.
  • ISM Training.
  • Emergency Procedures and Critical Equipment.

15
Audit Review
  • Auditor will review the EVIDENCE he/she has found
    onboard.
  • Consider EVIDENCE against what is stated and
    required in the Safety Management System.
  • Raise findings in the form of Non Conformances
    and/or Observations.

16
Discussion of Audit Findings
  • Discuss the findings of the audit, normally with
    the Master.
  • Review the findings if further EVIDENCE is put
    forward.
  • Agree on what will be raised as Non Conformances
    and/or Observations.
  • Consider any corrective actions proposed at that
    time and comment on them.
  • Agree on the timescale to complete any corrective
    actions.

17
Closing Meeting
  • Held with as many of the crew available to
    attend.
  • Summarise the findings giving brief details of
    the good areas and the bad areas (if any).
  • Thank them for their help and answer any
    questions they have on the Audit or ISM matters.

18
WHAT (can be done to help)
  • What can be done to help IOM yachts meet and
    maintain an acceptable standard.
  • DPA Involvement
  • ISM Training / ISM Seminars
  • Masters Review
  • Simple procedures
  • Crew assistance

19
DPA Involvement
  • DPA should be easily contactable.
  • Willing and able to help on any safety issues
    affecting the ship.
  • Willing to approach the Owner or act on his
    behalf in resolving safety issues.
  • Take the responsibility for ensuring the SMS is
    implemented and used on the yacht.

20
ISM Training / Seminars
  • All crew should read the Safety Management System
    and understand their duties and the procedures
    used.
  • DPA and Captain should go through it with them.
  • Where possible external training should be done
    by Master and Chief Engineer and others where
    possible.
  • Attendance at Seminars etc. help to improve
    understanding of what is required by ISM Code.

21
Masters Review
  • This is probably the most important part of ISM
    that never gets done properly.
  • Master should review the Safety Management System
    procedures used onboard.
  • Review process allows for free reporting and not
    too restrictive.
  • If parts of the SMS system doesnt work then tell
    the DPA and get it changed to what does work.
  • The simpler the system the easier it is to
    understand and use.
  • Frequency of Review ?

22
Crew Assistance
  • Highly motivated and intelligent.
  • Have come along way in a short space of time with
    regard to ISM.
  • Willing to learn and share experiences.
  • Best way to get feedback on the SMS.
  • Are there to discuss and assist with areas that
    dont work or could be improved.

23
Simple Procedures
  • Drill Matrix
  • Portfolio for Passage Planning
  • Plasticised checklists
  • Pre-Departure / Pre-Arrival / Musters Bunkering /
    Drills
  • Guest Safety Brief
  • Entries in Logbook

24
Drills
  • A simple matrix of intended drills giving details
    of when they were carried out and when the next
    one is going to be carried out.
  • Typical drills to include -
  • Fire Drills
  • Musters Boat Drills (Liferafts)
  • Man Overboard
  • Abandon Ship
  • Oil Spill (SOPEP Drill)

25
Familiarisation
  • All crew should be given some form of
    familiarisation when they come onboard.
  • They should be shown where life-saving and fire
    fighting equipment is stowed.
  • They should also be shown the basics in how to
    use and operate specific safety and/or critical
    equipment.

26
Familiarisation
  • Alarms and Signals used onboard
  • Basic Communications
  • Bilge pumping
  • Emergency Fire Pump
  • Emergency Lighting
  • Emergency Steering Gear
  • Launching liferafts
  • Man overboard and recovering a person from the
    water
  • PA System
  • Watertight Door operations

27
ISM - Commercial Yachts
  • Isle of Man Marine Administration
  • Cartoons Courtesy of Alert! - The International
    Maritime Human Element Bulletin

28
Non Conformances / Observations
  • Major Non Conformance Issues where corrective
    action must be carried out immediately to meet
    the ISM Code, failure to do so would result in
    the withdrawal of the Safety Management
    Certificate and/or the Company Document of
    Compliance.

29
Non Conformances / Observations
  • Non Conformances Issues where corrective action
    must be made to meet the ISM Code and/or ensure
    that the Procedures in the Safety Management
    System onboard are being followed correctly.
  • Time limited.

30
Non Conformances / Observations
  • Observations Issues where improvements in the
    Safety Management System and procedures are
    recommended.
  • These do not have to be complied with, however
    they should be considered.
Write a Comment
User Comments (0)
About PowerShow.com