Gateway Pipelines Safety and Integrity Management - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Gateway Pipelines Safety and Integrity Management

Description:

Gateway Pipelines. Safety and Integrity Management. BC ... Canton. Detroit. Robinson. Buffalo. 11. 3. 1. 4. 2. 6. 10. Fort McMurray. Gretna. Regina. Hardisty ... – PowerPoint PPT presentation

Number of Views:50
Avg rating:3.0/5.0
Slides: 12
Provided by: davidc131
Category:

less

Transcript and Presenter's Notes

Title: Gateway Pipelines Safety and Integrity Management


1
Gateway Pipelines Safety and Integrity
Management
  • BC Oil Gas Opportunities Summit
  • Victoria, BC
  • February 27, 2007

2

Proposed Planned Projects
  • Athabasca Pipeline Expansion (2006)
  • Spearhead Pipeline (2006)
  • Southern Access Mainline Expansion (2006-2009)
  • Waupisoo Pipeline (2008)
  • Line 4 Buildback (2008)
  • Southern Access Extension (2009)
  • Eastern PADD II Access (2009)
  • Southern Lights (2009)
  • Alberta Clipper (2009)
  • US Gulf Coast (2010)
  • Gateway Pipeline (2012-2014)

Puget Sound
Great Falls
Billings
Mandan
St. Paul
Casper
Salt Lake City
Sinclair
San Francisco
Cheyenne
Lima
Denver
McPherson
Bakersfield
El Dorado
Los Angeles
Coffeyville
Ponca City
Tulsa
Cushing
Artesia
Ardmore
Borger/Sunray
El Paso
Big Spring
Port Arthur
Houston
Lake Charles
Texas City
New Orleans
Freeport
Corpus Christi
3
Pipeline Safety - Design
  • Route selection
  • Environmental considerations
  • Soil stability
  • Water crossings
  • Materials selection
  • Pipe specifications
  • Coatings development

4
Pipeline Safety - Operation
  • Control systems
  • continuous monitoring from Enbridges Edmonton
    control centre
  • sophisticated leak detection systems
  • Aerial and ground patrols
  • Emergency preparedness
  • Public awareness

5
Pipeline integrity management
6
Marine transportation safety
  • VLCC and Suezmax size vessels to visit Kitimat
    terminal
  • Over 60 of world oil supply is delivered by
    tanker with an excellent safety record
  • International safety standards would apply to
    transportation within BC waters

7
Marine Transportation Security
  • THREE LEVELS OF SECURITY
  • Tanker Vetting Process
  • Ship and officer screening
  • Pilotage
  • BC Coast Pilots on board
  • Tug escort
  • Minimum of two purpose-built tugs

8
Marine transportation safety
  • Full bridge simulation by Force Technology of
    Denmark
  • Allows crews a virtual tour of tanker and
    tugboat navigation by recreating marine channels
    to the Kitimat Terminal
  • Simulation can recreate a wide variety of
    weather, current and ship conditions

9
Terminal Emergency Response
  • Contingency Planning
  • Oil Pollution Prevention Plan (Canada Shipping
    Act)
  • Oil Pollution Emergency Plan (Canada Shipping
    Act)
  • Emergency Response Plan (National Energy Board
    Act)
  • Response Resources
  • Contract with Certified Response Organization
    (Canada Shipping Act)
  • Project specific response capability would be
    located at strategic locations

10
Tanker Emergency Response
  • Tankers in Canadian waters require
  • Shipboard Oil Pollution Emergency Plan and
  • Contract with Certified Response Organization
    (Canada Shipping Act)

11
Gateway Pipelines Project Summary
  • Enbridge is committed to providing safe
    transportation of Canadas expanding oil sands
    production to new markets
  • Gateway pipeline project is a strategic component
    of this plan
  • Project completion expected 2012 to 2014
Write a Comment
User Comments (0)
About PowerShow.com