Title: ACTIVITY REPORT
1- ACTIVITY REPORT
- on EU Funds absorption
- May 2008 May 2009
Meglena Plugtschieva Deputy Prime Minister
2PHARE ProgramMay 2008
- Total budget of PHARE Program 2000-2006 1480
mln EUR breakdown - EU funding Financing Memorandum 2000-2006 1152
mln EUR - National co-financing 327 mln EUR
- Four PHARE Program Implementing Agencies (IAs)
at Ministry of Finance (MF), Ministry of
Regional Development and Public Works (MRDPW),
Ministry of Economy and Energy (MEE), Ministry of
Labor and Social Policy (MLSP).
3PHARE ProgramMay 2008
- In March 2008 the EC suspended payments to the
PHARE Implementing Agency at the MF the CFCU,
and to the PHARE Implementing Agency at the
MRDPW. - The suspension of payments affected the CFCU (MF)
36.6 mln EUR and the MRDPW 14.1 mln EUR. - The total budget of the two IAs under 2005
Financing Agreements amounts to 102 mln EUR and
under 2006 Financing Agreements, to 0.7 mln EUR. - Real risk that the accreditation of the IAs at
the MF and MRDPW might be withdrawn. - Problems were identified in
- Public procurement procedures
- Project management
- Administrative capacity
- Backup and storage of documents
- The system of timely reporting suspicions of
fraud and irregularities, etc.
4PHARE ProgramMay 2008
- As of May 2008 of the total budget of the active
Financing Memoranda (2001-2006) amounting to 966
mln EUR for the 4 PHARE IAs, 553 mln EUR were
contracted and 296 mln EUR were paid. - To be contracted till 30.11.2008
- under Financing Agreements (2005 and 2006) - 311
mln EUR. - Outstanding payments
- on the active Financing Memoranda and Financing
Agreements (2001-2006) - 567 mln EUR till end
2010. - When the accreditation was withdrawn in July
2008 323 mln EUR were frozen, the breakdown
being - 197 mln EUR for contracts made in conditions
subject to control by the EC Delegation in
Bulgaria and - 126 mln EUR for contracts made after 29.06.2007.
5PHARE Program May 2009
- Actions taken following the EC July 2008 report
and decision to take away the accreditation of
the CFCU and the IA at the MRDPW - The EC noted the positive steps taken by the
Bulgarian institutions to improve the programme
management systems in line of transparency,
competency and firm will to overcome problems
from the past. - Further to the European Commissions
recommendations, measures were taken to
strengthen the management and control systems,
i.e. Senior Programme Officers were appointed in
every beneficiary institution to take charge of
on-going projects, and Operating Agreements were
signed between the Senior Programme Officers and
the Programme Authorizing Officers (PAOs). - The Bulgarian administration implemented and
reported to the EC its Action Plan with specific
measures corresponding to the ones outlined in
Appendix No. 1 to the Decision. - Additional monitoring controls were introduced.
Measures, addressed at the management levels,
aiming to ensure the functioning of the systems
in accordance with good financial management
principles. - The Instructions of the National Authorizing
Officer (NAO) to all PAOs were updated to
regulate the entry of information in the Early
Warning System. - The NAOs instructions are being followed and
procedures for reporting irregularities are
published on the web-page of the respective
Ministry and are included in the tender dossier.
5
6PHARE Program May 2009
- Strengthened administrative capacity,
- ?he role and functions of the NAO was amended
expanding the NAOs powers in order to guarantee
and strengthen the NAOs leading role in the
process of managing the PHARE funds. - Personnel changes were made within the management
of the CFCU and the PHARE IA at the MRDPW. - The programme implementation is regularly
reported to the Council of Ministers. - Day-to-day monitoring of problem projects
according to a project implementation schedule. - The NAOs supervisory role in the control
architecture was stepped up through amendments to
several normative acts. The regulatory framework
was amended with respect to the human resource
management policy in the PHARE sector.
6
7PHARE Program May 2009
- Implementation of the coordinated and uniform
policy on irregularities has been ensured by
protection of the persons who report
irregularities. Immediate investigation of such
cases is encouraged whereas the use of public
means for personal benefit is precluded. - Priority is given to sensitive issues of great
public significance such as public procurement
transparency, the approval of a Law on the
Detection and Prevention of Conflicts of
Interest, administrative capacity strengthening,
improving the process of irregularity treatment
and rejection of contractors involved in cases
of irregularities under contracts co-financed by
EU funds. - Management and control systems have been
strengthened on the basis of best practices to
find a lasting solution in the prevention of
established irregularities and the achievement of
convincing results with guaranteed stability and
irrevocability in the long run.
7
8PHARE Program May 2009
- The other two IAs at the MLSP and the MEE, which
had only contracted a total of 5 under the 2006
FA until June 2008, have reported contracting
almost 90 of the funds. - As at May 2008, out of the total budget of Euro
966 million under the FM for the four PHARE IAs,
Euro 553 million had been contracted and Euro 296
million had been disbursed. - As at May 2009 , Euro 1008 million have been
contracted and Euro 796 million have been
disbursed. - To have the payments suspension measure lifted,
the Bulgarian administration prepared and sent
the EC detailed information, an analysis and
assessment of the legality of contracts, signed
prior to the Extended Decentralized System. The
EC is expected to react to the Payment Requests
sent in by the MF for contracts signed prior to
the EDIS. - The Bulgarian administration has implemented the
recommended corrective measures and has thus
proven the firmly declared will of the Bulgarian
government to ensure transparency, control and
reliability of the programme management systems.
The Management and Control Systems have been
changed and improved. - The National Fund has sent in 5 Payment Requests
to the EC in connection with contracts signed
prior to the EDIS - The national co-financing component for payments
under PHARE-FA 2006 has been ensured by Council
of Ministers Decree (CMD) 243/2008 and CMD
89/2009.
8
9SAPARD ProgramMay 2008
- Total budget 591 mln. EUR (AFA 2000-2006).
- Completion of the Program scheduled for end
2008. - Bulgaria asked for an extension of the period of
payments end 2009 however, the Commission did
not reply. - There was a real risk to lose some of the AFA
financing for 2005 and 2006. - As of May 2008 just 23 mln. EUR were paid out of
the AFA 2005 and 2006 total budget amounting to
210 mln. EUR.
10SAPARD ProgramMay 2008
- Suspension of payments for 3 measures and one
sub-measure - Measure 1 investment in farms (270 projects,
cost 96 mln BGN) - Measure 2 improvement of the processing and
marketing of agricultural and fish products (47
projects, cost 77.5 mln BGN) - Measure 3 promotion and diversification of
economic activities, multiple activities and
alternative income (302 projects, cost 86.7 mln
BGN) - Measure 5 (sub-measure) wholesale markets (4
projects, cost 12 mln BGN). - Prior to the suspension of payments for the
measures, 623 contracts had been signed worth
272.2 mln BGN (139 mln EUR).
11SAPARD PROGRAMME May 2009
- Status of the SAPARD Programme as of May 2009
- The programme management and control systems have
been improved in line with the EC recommendations
of June 2008 - The effective period of the 2006 Annual Financial
Agreement has been extended until the end of 2009
in order to make all payments to the programme
beneficiaries - Payments under the four suspended measures of the
SAPARD programme have been resumed. As of May
2009, the total amount of the European subsidy
due for approved projects under such measures
amounts to approximately Euro 76 million (148,6
million levs).
11
12SAPARD PROGRAMME May 2009
- Based on the positive results from the Action
Plan implementation and the assurance of the
audit company Ernst Young, payments to end
beneficiaries under the suspended 3 measures and
1 sub-measure were resumed in the middle of
October 2008. - From the programme start (2000) to 15 May 2009, a
total of 3,509 projects were approved under
SAPARD with a subsidy of BGN 1,375,931,680. Of
these, full payments were made under 2,218
projects with a subsidy of BGN 757,387,340. - Council of Ministers Decree No. 74 of 30 March
2009 on Payments out of the Agriculture State
Fund under Contracts with End Beneficiaries to
the SAPARD Programme allowed the Agriculture
State Fund to expend BGN 100 million. - After the meetings in the EC in May some tasks
remain to be finalized
12
13ISPA ProgramMay 2008
- ISPA period of implementation from 2000 to 2010.
- Total budget 1,603 mln EUR (EU financing 880
mln EUR, national co-financing 723 mln EUR). - The ISPA Program is implemented in two sectors
Transport and Environment. - In May 2008 the Monitoring Committee on Cohesion
Fund assistance (Regulation 1164/94) identified
14 projects at risk of which 3 in the Transport
sector and 11 in the Environment sector.
14ISPA Program Transport sector May 2008.
- The total number of FMs for CF/ISPA Transport
sector is 11. - The total sum of the FM is 909 mln EUR.
- The ISPA Program Monitoring Committee identified
3 projects at risk in the Transport sector - - Construction of a new cross-border combined
road/railway bridge at Vidin-Calafat on the
Danube - - Laying a second track and electrification of
the Plovdiv-Svilengrad railway - - Construction of Lyulin Motorway Sofia
Bypass Daskalovo Road Junction. -
15ISPA Program Environment sectorMay 2008
- The total number of FMs for CF/ISPA Environment
sector is 25, the breakdown being - Water sector 19
- Waste sector 2
- Protection of the environment 1 (flue gas
desulphurization plant at TPP Maritsa East 2) - Technical assistance 3
- The FM sum total is 639 mln EUR.
- In June 2008 a total of 12 risk projects were
identified (7 in the Water sector, 1 in the
Protection of the Environment sector, 1 in the
Waste sector and 2 Technical Assistance
projects). - As of May 2008 the amount of the non-contracted
funds is 196 mln. EURO
16ISPA Program - Transport Sector
- Status of the ISPA Programme, Transport Sector as
at May 2009 - Contracted Euro 793 mln Paid Euro 309 mln
(39). - Completed Projects which have to a very high
degree cached up with the delay in
implementation - Sofia Airport Reconstruction, Modernization and
Expansion - Transit Roads ??? Lots 3, 4, 8 and 9.
- On-going Projects
- Construction of a New Cross-Border Combined
Road/Railway Bridge over the Danube at
Vidin-Calafat. Doubling and Electrification of
the Plovdiv Svilengrad Railway Connection - Construction of Lyulin Motorway Sofia Bypass
Daskalovo Road Junction - Technical Assistance for the Modernization of the
Railway Lines along Pan-European Transport
Corridors (TEN-T) - Technical Assistance for the Reconstruction of
the Plovdiv-Burgas and Mezdra-Gorna Oryahovitsa
Railway Lines in Bulgaria - Technical Assistance for the Modernization of the
Vidin-Sofia Railway Connection - Technical Assistance for Preparation of Road
Projects along Pan-European Transport Corridors
(TEN-T) located in Bulgaria. - Substantial progress in the organization and
implementation of the projects is registered
16
17ISPA Program Transport Sector May 2009
- THE EC RELEASED EURO 115 MLN UNDER THE ISPA
PROGRAMME ON 12 MAY 2009 - THE EC REACHED THIS DECISION FURTHER TO THE
FOLLOWING ACTIONS TAKEN BY BULGARIA - Amendments to the existing legislation (Roads
Act, Detection and Prevention of Conflicts of
Interests Act, Public Procurement Act, Rules and
Regulations of the National Road Infrastructure
Agency etc.). - Changes in the existing administrative structures
(The National Road Infrastructure Fund was
transformed into the National Road Infrastructure
Agency (NRIA) a new Executive Director and
Supervisory Board were appointed NRIF was
transformed into an intermediate body reporting
to the Managing Authority at the Ministry of
Transport. Agreements signed between the Managing
Authority at the MT and the Intermediate Body at
NRIF) - The administrative capacity of the National Road
Infrastructure Agency was enhanced by the
appointment of new staff members and the conduct
of training. - External audits were made, which confirmed the
absence of conflicts of interest and the
effective functioning of the management and
control systems in this field. - An advisor from the Federal Ministry of
Transport, Construction and Urban Development of
the Federal Republic of Germany was appointed in
support of the management of the National Road
Infrastructure Agency.
17
18ISPA Program Transport Sector May 2009
- On 12 May 2009, the European Commission
officially announced the release of Euro 115 mln.
under the ISPA programme for Bulgaria. - Pending
- Visit of EC DG Regional Policy Director General
Mr. Dirk Ahner, 26-28 May 2009. - Visit of Commissioner for Regional Policy, Ms.
Danuta Hübner, 17-19 June 2009.
18
19ISPA PROGRAMME Environment Sector May 2009
- Waste water treatment installations were built
and put into operation in Pazardjik and
Blagoevgrad. - All tender procedures for the selection of
contractors under approved projects have been
conducted, and the final tender procedure for the
selection of a contractor for the Development of
the Sofia Water Supply and Sewerage Grid, Tender
2 has been announced. - As of May 2008 there are non-contracted funds of
196 mln. EURO - CMD 267/03.11.2008 approved the allocation of
earmarked additional national co-financing for
the successful completion of ISPA projects in the
Environment Sector in 2008 to the amount of BGN
11.49 mln, and another BGN 45.28 mln for 2009 and
2010.
19
20SCHENGEN FACILITY May 2008
- National Indicative Program (2007-2009) cost
161 mln EUR. - Deadline for contracting 31.12.2009.
- As of May 2008 3 contracts, total cost 44,000
EUR. - Shortage of capacity to prepare and hold
tendering procedures for the Schengen Facility as
the CFCU at the MF had to complete in parallel
the contracting under PHARE 2005 and PHARE 2006. - Late start of the tendering procedures scheduled
for 2007 and 2008.
21SCHENGEN FACILITY May 2009 .
- Contracts have been signed to the amount of over
Euro 7 mln. These are 7 procurement contracts
(among which for the delivery of two 200-ton
ships, 6 river-going vessels, 200 vehicles) and 6
contracts for the hiring of independent experts. - A tender organization timetable is observed. So
far 25 selection procedures have been completed
to the amount of approximately Euro 101 mln. - The Central Financing and Contracts Unit at the
Ministry of Finance received documentation from
the beneficiaries for tender procedures to the
amount of Euro 90 million. Projects for over Euro
37 mln more are ready to submit to the CFCU. - In 2009, public procurement and contracting
procedures are expected to take place in the
fields of aerial surveillance of the borders (3
helicopters), special police operation equipment,
automobile equipment, renovation of the Border
Police Directorate General buildings and
construction of a specialized hostel for illegal
immigrants near the border with the Republic of
Turkey, means of communication, technical
equipment and software for joining the Schengen
Information System and Visa Information System,
raising the qualifications of employees in
implementing the Schengen legislation.
21
22OPERATIONAL PROGRAMMES AS OF MAY 2008
- Overall delay of OPs.
- Contracts concluded from 1.01.2007 till May 2008
amount to BGN 93,132,149 (EUR 47,617,712). - Problems with the administrative capacity
- UMIS tendering procedure has failed
- Need to strengthen the capacity of the Audit
Authority (Audit of EU Funds Directorate, MoF) - Speeding up the acquisition of positive
compliance assessment of management and control
systems. - Completion of UMIS.
- Insufficient control
- Complex and clumsy procedures
- Insufficient transparency
- Lack of public feedback
- The preparation of starting FLAG Fund was
blocked
23OPERATIONAL PROGRAMMES May 2009
- Contracting under all OPs is expedited
- The contracts concluded as of May 2009 amount to
- BGN 2,435,726,077 (EUR 1,245,366,968)
- The Administrative capacity of the units is
strengthened - The Audit Authoritys capacity is restructured
and strengthened - Work on the conformity assessment is expedited
- A UMIS is in operation
- Procedures are streamlined and the time frames
for conducting and decision-making are shortened - Transparency, communication and relation with the
public are enhanced
24OPERATIONAL PROGRAMMES May 2009
- Control mechanisms are improved
- A number of legislative amendments are made to
the primary and secondary legislation - The interaction and cooperation with the European
Anti-fraud Office (OLAF), SANS, Supreme cassation
Prosecutors Office, State Receivables Agency,
Agency Public Financial Control Inspectorate is
improved
25Operational Programmes Implementation (2007-
2013) May 2009
26RURAL DEVELOPMENT PROGRAMME (RDP) AS OF MAY 2008
- RDP (2007-2013) was approved on 19 February
2008 by European Commission Decision No. 755. - As of May 2008 8 measures out of 22 in total
have been launched. - The RDP budget for 2007 and 2008 amounts to EUR
722,713,481 which have to be paid by the end
2010. - The amount paid as of May 2009 is EUR 56 million.
27RURAL DEVELOPMENT PROGRAMME (RDP) - M?? 2009
- 20 ordinances for implementation of the RDP, out
of 22, were published. The remaining two measures
are scheduled to be launched by the end of 2009.
20 measure have been launched. - Regulatory amendments were made for streamlining
of procedures of applying for, approval, and
funding of projects reduced number of required
documents, ex officio provision of some of them,
and shorter time frames. These amendments will
come into effect from 1 June 2009. - With Decree No. 53 of 4 March 2009 of the
Council of Ministers the reimbursement of VAT
expenses of public beneficiaries under RDP
projects was approved for 2009. - With regard to the measures related to
compensatory payments for underprivileged
regions, a total of 67756 applications were
accepted for the 2007 and 2008 campaigns, and
1462 applications under the measure of
agro-ecological payments. - As of 11 May 2009, a total of BGN 345.618 million
were paid to the farmers, which is 24. 8 of the
budget (BGN 1,414 million) which is to be paid
out by the end of 2010. - Interface with UMIS is under construction
28RURAL DEVELOPMENT PROGRAMME (RDP) - M?? 2009
Data not included in Total
29Funds paid under the RDP - M?? 2009
30DIRECT PAYMENTS, MARKET MECHANISMS AND TECHNICAL
INSPECTORATE OF THE PAYING AGENCY MAY 2008
- Direct payments are received under an upward
scheme expressed in of the level applied to
such payments in EU15 - 25 - 2007 40 - 2010 70 - 2013
100 - 2016 - 30 - 2008 50 - 2011 80 - 2014
- 35 - 2009 60 - 2012 90 - 2015
- Payment per hectare EUR 53.1 for 2007 and EUR
65.38 for 2008 - As of May 2008 73,792 producers received
direct payments to the amount of BGN 321,287
million (EUR 164,271 million) - The on the spot checks performed by the
Technical Inspectorate are on track. - The schemes under the market mechanisms are
functioning. - The 2008 Single Area Payment Scheme (direct
payments) budget amounts to EUR 240 million from
the European Agricultural Guarantee Fund. The
national co-financing budget is EUR 140 million
of which EUR 75 from RDP and EUR 75 million from
the national budget. - The Paying Agency is in a probation period.
31DIRECT PAYMENTS, MARKET MECHANISMS AND TECHNICAL
INSPECTORATE OF THE PAYING AGENCY MAY 2009
- Under the Single Area Payment Scheme, the
National Co-Financing Scheme and the measures for
the disadvantaged regions the total budget
amounts to 428 714 055 EUR. By 30 April 2009 the
resources paid under this budget for the campaign
2008 amount to 668 345 722.51 BGN (341 719 528
EUR) - The sums paid under SAPS for the period from 1
December 2008 to 30 April 2009 under the campaign
2008 in EUR amount to 199 266 055.00 (389 730
527.66 BGN) or 85,4 of the annual budget, and
those under NCFS - 129 371 146.00 EUR (253 027
968.04 BGN) or 91,84 of the 2008 budget
32OPERATIONAL PROGRAMME FISHERIES SECTOR
DEVELOPMENT
- OP Fisheries Sector Development (2007-2013)
provides funding for measures for adaptation of
the Bulgarian fishing fleet, developing of
aquacultures, inland fishing, processing and
marketing of fishery and aquaculture products,
sustainable development of fisheries areas,
technical assistance. - Total budget EUR 107 million (EU funding EUR
80 million national co-financing EUR 27
million) - Managing Authority National Executive Agency of
Fisheries and Aquaculture (NAFA) - Intermediate Body State Fund Agriculture as a
Paying Agency
33OPERATIONAL PROGRAMME FISHERIES SECTOR
DEVELOPMENT May 2008
- The Programme was approved on 14.12.2007
- Managing Authority appointed
- Communication Strategy prepared
- No launched procedures.
- No legislation (ordinances) on the terms and
procedure for extending grants under the
measures. - No project selection criteria endorsed.
- National Agency of Fisheries and Aquaculture
units not adequately staffed.
34OPERATIONAL PROGRAMME FISHERIES SECTOR
DEVELOPMENT ??? 2009
- On 6 December 2008, the call of project proposals
was launched under - Measure 1.3 Investments on Board Fishing
Vessels and Selectivity in the amount of EUR 1,2
million, of which EUR 0,9 million from ?FF. - Measure 2.1 Productive Investment in Aquaculture
in the amount of EUR 6.3 million, of which EUR
4.725 million from EFF - 9 project proposals under measure 2.1 were
submitted - Ordinances on the implementation of 7 measures
under this OP were published, the remaining ones
are in the process of approval by the MAF - Activities started on Priority Axis Technical
Assistance for a total value of EUR 5.334
million, of which EUR 4 million from the EFF - On 8 May 2009, the European Commission approved
the Audit Strategy for OP Fisheries Sector
Development - A new website www.oprsr.government.bg is in
operation. There is an effective electronic data
exchange agreement with UMIS and IACS - The communication plan and the publicity
campaign are actively implemented
35OPERATIONAL PROGRAMME "TRANSPORT"
GENERAL INFORMATION
- OP Transport (2007-2013) finances large-scale
infrastructure projects - Total budget EUR 2,003 million, of which EUR
1,624 million EU funds and EUR 379 million
national co-financing. - Managing authority Programme and Project
Coordination Directorate at the Ministry of
Transport. - Beneficiaries National Railway Infrastructure
Company, National Road Infrastructure Agency,
Executive Agency for Exploration and Maintenance
of the Danube River Maritime Administration
Executive Agency, Metropoliten EAD
36OPERATIONAL PROGRAMME TRANSPORT
CURRENT STATUS
- As of May 2008
- A contract was concluded for a grant at total
value of BGN 7,027,200 (EUR 3,592,950) - As of May 2009
- 19 contracts were concluded for grants totalling
approx. BGN 601,112,943 (EUR 307,344,168) - 5 operating agreements were concluded for the
preparation, selection, management,
implementation, monitoring and control of
projects/operations funded under OPT with all
beneficiaries under the programme
37OPERATIONAL PROGRAMME TRANSPORT
- Contracts were concluded between Metropoliten
EAD, Metro Trace" Consortium and Dogus Insaat ve
Ticaret A.S. for the construction of the Sofia
Metro extension along the route Nadezhda
Interchange Central Railway Station St.
Nedelya Square - NDK Cherni Vrah blvd. - A tender procedure for selection of a contractor
for design and construction of the railway
section Svilengrad Turkish Border is underway.
The deadline for the evaluation committee to
complete the evaluation is 22 May 2009 - The National Road Infrastructure Agency, as the
beneficiary under Priority Axis 2 of OP
Transport, was completely restructured and its
administrative capacity was strengthened - The National Road Infrastructure Agency concluded
an operating agreement with the Managing
Authority at the Ministry of Transport, thus
ensuring better control over the implementation
of the projects
38OPERATIONAL PROGRAMME ENVIRONMENT
GENERAL INFORMATION
- OP Environment (2007-2013) provides the funding
for the preparation and construction of
infrastructure projects for treatment of wastes,
drinking and waste water projects for
preservation and restoration of biodiversity. - Total budget EUR 1,800 million or BGN 3,520
million (EU financing EUR 1,466 million
national co-financing EUR 334 million) - Managing Authority Cohesion Policy for
Environment Directorate at the MOEW - Intermediate Body EU Funds for Environment
Directorate at the MOEW - Beneficiaries municipalities water companies
basin directorates regional associations
regional MOEW structures and the State Forestry
Agency administrations managing NATURA 2000
NGOs
39OPERATIONAL PROGRAMME ENVIRONMENT
PROGRESS OF IMPLEMENTATION OF OP "ENVIRONMENT" AS
OF MAY 2008
- As of May 2008, 3 procedures were opened for
providing grants under OPE - 2 procedures under Priority 1 - Waters a
procedure for Technical Assistance for
Preparation of Investment Projects and a
procedure for Improvement and Development of
Drinking and Waste Water Infrastructure - 1 procedure under Priority 2 Wastes
Management a procedure for Technical Assistance
for Preparation of Investment Projects
40OPERATIONAL PROGRAMME ENVIRONMENT
PROGRESS OF IMPLEMENTATION OF OP "ENVIRONMENT"
(MAY 2008 - MAY 2009) I
- As of May 2009, a total of 252 contracts were
concluded under the programme for a total value
of BGN 734,671,429 (EUR 375,631,537). - Priority Axis 1 - Waters
- Under a procedure of Technical Assistance for
Preparation of Investment Projects 157 contracts
were signed at a total value of approx. BGN 154
million - Under a procedure of Improvement and Development
of Drinking and Waste Water Infrastructure 32
projects were approved at a total value of
approx. BGN 586 million, and 29 contracts were
concluded at a total value of approx. BGN 536
million. Two major projects of the Vratsa and
Gabrovo municipalities were approved at a total
value of BGN 260 million - 2 new procedures were announced for selection of
investment projects for agglomeration communities
with more than 10,000 equivalent inhabitants and
agglomeration communities with 2,000 to 10,000
equivalent inhabitants. The procedures are at the
stage of evaluation of the proposals submitted - Under a direct provision procedure for
Development of River Basin Management Plans a
decision was issued for a grant of BGN 36
million.
41OPERATIONAL PROGRAMME ENVIRONMENT
PROGRESS OF IMPLEMENTATION OF OP "ENVIRONMENT"
(MAY 2008 - MAY 2009) II
- Priority Axis 2 Wastes Management
- Under a procedure of Technical Assistance for
Preparation of Investment Projects 35 contracts
were concluded at a total value of approx. BGN 25
million. - At an extraordinary session on 24 March 2009, the
OPE Monitoring Committee approved by a consensus
a concept of direct provision of funding by a
grant under this priority axis. - Priority Axis 3 Preservation and Restoration of
Biodiversity 24 projects approved for 18 BGN
million. - Priority Axis 4 Technical Assistance
- 30 orders were issued under a direct provision
procedure at a total value of BGN 8,056 million.
42OPERATIONAL PROGRAMME ENVIRONMENT
Legislative Amendments
- MOEW has prepared and submitted to the Parliament
a proposal for amendment of the Environmental
Protection Act aiming at establishing a legal
ground for repeated procedures for preparation of
environmental impact assessment of road projects - A National position for the water sector is
prepared - Amendments to the existing legislation in
relation to the water supply sector reform were
submitted to the Parliament and their adoption
at second reading is pending.
43OPERATIONAL PROGRAMME COMPETITIVENESS
GENERAL INFORMATION
- OP Competitiveness (2007-2013) provides funding
in support of innovations, assists Bulgarian
companies, improves the conditions for the
development of business, provides funding
opportunities, strengthens the position of the
Bulgarian economy in the international market. - Total budget EUR 1,162 million, of which EU
funding of EUR 988 million and national
co-financing of EUR 174 million. - Managing Authority
- European Funds for Competitiveness
Directorate at the MEE - Intermediate Body
- Executive Agency for Encouragement of SMEs.
- Beneficiaries small and medium enterprises,
large companies, universities, scientific and
research centres, NGOs, etc.
44OPERATIONAL PROGRAMME COMPETITIVENESS
CURRENT STATUS
- As of May 2008, a serious delay was reported in
the implementation of the Operational Programme,
as a total of 0 projects at a value of BGN 0 were
approved. Significant delay was also reported in
the organisation of the evaluation committees. - As of May 2009, a total of 341 projects were
approved, and 327 contracts at a total value of
BGN 246,303,865.33 were concluded, and - Three procedures are in the process of
implementation - 2007BG161PO003/1.1.1-01/2007 Support for the
Creation and Development of Innovative Start-up
Companies - 2007BG161PO003/2.1.1-01/2007 Upgrade of
Technologies in Enterprises - 2007BG161PO003/2.1.2-01/2007 Achieving
Compliance with Internationally Recognized
Standards - In May 2009, four evaluation committees completed
their work on the following procedures - BG161PO003-1.1.02 Support for Commercialization
of Innovative Products, Processes and Services - BG161PO003-2.1.03 Achieving Compliance with
Internationally Recognized Standards - BG161PO003-2.1.04 Upgrade of Technologies in
SMEs - BG161PO003-2.1.05 Upgrade of Technologies in
Large Enterprises - The approval of the evaluation reports by the
Managing Authority is pending.
45OPERATIONAL PROGRAMME COMPETITIVENESS
THE JEREMIE INITIATIVE
- Operations under Priority axis 3 of the
Operational Programme will be implemented by
establishing a Holding Fund to be managed by the
European Investment Fund (EIF) in accordance with
the JEREMIE Initiative. The Holding Fund will be
registered in Bulgaria as a Special Purpose
Vehicle (SPV). The budget allocated under this
priority axis for the programme period amounts to
BGN 391,166,000. - The Framework and the Funding Agreements under
the JEREMIE Initiative should be signed on 27 May
2009 in Sofia. The ratification of the agreements
by the Parliament of the Republic of Bulgaria is
pending in due time.
46OPERATIONAL PROGRAMME HUMAN RESOURCES
GENERAL INFORMATION
- OPHuman Resources (2007-2013) is aimed at
improving the quality of life of people in
Bulgaria through improving the human capital,
achieving high levels of employment, increasing
productivity, access to high quality education
and life-long learning, and strengthening of
social inclusion. - Total budget EUR 1,213,869,575
- Managing Authority
- General Directorate European Funds,
International Programmes and Projects at the
Ministry of Labour and Social Policy - Intermediate Bodies
- Ministry of Education and Science,
Employment Agency, Social Assistance Agency - Beneficiaries municipalities, NGOs, government
institutions, social enterprises, representatives
of various communities, educational, training and
research institutions, scientific organisations,
employers, industry and sectoral organisations,
etc.
47OPERATIONAL PROGRAMME HUMAN RESOURCES
- As of May 2008, 6 procedures were opened for
provision of grants at a total value of BGN
87,718,976 (EUR 44,850,000) - As of May 2009, 39 procedures were opened for
provision of grants at a total value of approx.
BGN 660 million (EUR 337.4 million) - The Monitoring Committee of the Operational
Programme has approved selection criteria for 57
operations in the amount of BGN 1.314 billion.
(EUR 0.672 million)
48OPERATIONAL PROGRAMME HUMAN RESOURCES
- As of May 2009, a total of 797 contracts
amounting to BGN 254.4 million (EUR 130.07
million) are concluded. - Funding is provided for the following
- 84 municipal projects
- 180 NGO projects
- 203 projects in high schools
- 37 projects in higher education establishments
- 6 projects in extra-curricular educational
establishments - 14 projects in institutes of the Bulgarian
Academy of Sciences - 16 projects in government institutions
- 255 projects in companies of various sectors and
industries. - In 2008 only, about 100,000 people benefited from
various activities funded under the programme. - The health programme for 76 mln EURO has started
and will be implemented by the Ministry of
Health
49 OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT
2007-2013
GENERAL INFORMATION
- OP Regional Development (2007-2013) provides
funding for infrastructure projects for
integrated urban development regional and local
infrastructure, including health infrastructure
sustainable development of tourism regional and
local cooperation networks. - Total budget EUR 2,601million, of which EU
funding - EUR 1.361 billion and national
co-financing EUR 240 million - Managing Authority General Directorate
Programming of Regional Development at the
MRDPW, which has 6 divisions in the planning
regions - Beneficiaries municipalities, municipal
companies, associations of municipalities,
locally represented NGOs, individual
beneficiaries
50 OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT
2007-2013
- As of May 2008
- There were no concluded contracts
- As of May 2009
- There are 236 concluded contracts amounting to
- BGN 472,483,184 (EUR 241,576,816)
- Paid out funds are
- BGN 13,792,558.60 (EUR 7,052 023)
51OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT
2007-2013
- CONTRACTS CONCLUDED WITH BENEFICIARIES BY
PLANNING REGION AND MUNICIPALITY - ?AY 2009
52FORECAST OF PAYMENTS IN 2009 UNDER OP REGIONAL
DEVELOPMENT BY PRIORITY AXIS AND A REPORT ON THE
I-ST QUARTER OF 2009
OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT
2007-2013
53OPERATION OF FLAG
OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT
2007-2013
APPROVED APPLICATIONS FOR LOANS FROM THE FLAG
FUND FOR IMPLEMENTATION OF PROJECTS UNDER OPRD
May 2009
54OPERATION OF FLAG (2)
OPERATIONAL PROGRAMME REGIONAL DEVELOPMENT
2007-2013
APPROVED APPLICATIONS FOR LOANS FROM THE FLAG
FUND FOR IMPLEMENTATION OF PROJECTS UNDER OPRD
May 2009
55OPERATIONAL PROGRAMME ADMINISTRATIVE CAPACITY
GENERAL INFORMATION
OP Administrative Capacity provides funding in
support of good governance, development of human
resources in the government administration
structures, the judiciary, and the civil society,
improving the quality of administrative services
and development of electronic government. Total
budget (2007-2013) EUR 181 million, of which EU
funding EUR 154 million and national
co-financing EUR 27 million. Beneficiaries
public administration, the judiciary, civil
society. Managing Authority Projects and
Programmes Management Directorate, MSAAR.
???? ??????????
56 OPERATIONAL PROGRAMME ADMINISTRATIVE CAPACITY
CURRENT STATUS
- As of May 2009
- A total of 25 procedures opened
- 202 approved projects for BGN 108,266,404 (EUR
55,355,734) - 181 beneficiaries under the programme
- 197 concluded contracts for BGN 105,088,673 (EUR
53,730,985) - 591 applications for payment considered
- BGN 43,149,647 (EUR 22,062,064) actually
disbursed funds, or 100 of the 2007 funds and
46.31 of the 2008 funds
56
57Operational ProgrammeTechnical Assistance
- Subject The programme provides funding for
strengthening the capacity of the EU funds
management structures on national level
setting-up of UMIS enhancing awareness of the EU
cohesion policy. - Total budget EUR 56,8 million, of which EU funds
amounting to EUR 48,3 million, and national
co-financing amounting to EUR 8,5 million. - Managing Authority Department Operational
Programme Technical Assistance in the MoF
Management of EU Funds Directorate. - Beneficiaries specific beneficiaries the
entities under the MoF and the entities under the
Council of Ministers Administration
58Operational ProgrammeTechnical Assistance
CURRENT STATUS
- As of May 2008, 11 contracts were concluded at a
total value of BGN 13,302,020. - As of May 2009, 21 contracts were concluded at a
total value of BGN 25,914,612, as payments amount
to a total of BGN 2,381,735. - In the third quarter of 2009 the approval of a
project currently under development for
setting-up of information centres for publicity
of the EU cohesion policy is forthcoming.
59AUDIT AUTHORITY
- To strengthen the independence of the Audit
Authority, Council of Ministers Decree No. 305
of 11 December 2008 transformed the Audit of EU
Funds Directorate into an Audit of EU Funds
Executive Agency reporting to the Minister of
Finance, as of 1 January 2009 - Council of Ministers Decree No. 346 of 30
December 2008 approved the Rules and Regulations
of the Audit of EU Funds Executive Agency. The
Rules and Regulations envisage the setting up of
an Audit Committee with the Agency to act as the
Agencys specialized support body for monitoring
and advisory purposes. The Audit Committee was
appointed by an order of the Minister of Finance
of 30 January 2009 and is made up of three
members, one of whom is the chair - To strengthen the capacity of the Audit Authority
and to improve its functions, in January 2009
contracts were signed with the international
audit companies Pricewaterhouse Coopers,
Deloitte, Ernst Young and KPMG. The contracts
were designed to support the audit approach and
methods to conduct qualification and
requalification training for the audit authority
staff in accordance with the European and
national legislation and with the international
standards and best practices to guarantee the
hiring of international experts on the joint
audit teams for audits of the Structural and
Cohesion Funds organized jointly with the Audit
Authority
?????????? ???????? ???????? ????, ?????????? ?
??????????
59
60AUDIT AUTHORITY
- The revised audit strategies of the Operational
Programmes were sent to the European Commission
in April 2009 via the SFC 2007 system. - The process of updating the description of
management and control systems, of the conformity
assessment reports and of the opinions under the
seven OPs is still under way. The updated
documents will be presented to the EC by the end
of May and beginning of June 2009
?????????? ???????? ???????? ????, ?????????? ?
??????????
60
61Unified Management Information System
- The UMIS functional capabilities, which comply
with the requirements of Regulation 1083/2006 and
Regulation 1828/2006, were developed and put into
operation. They include the following modules - Registration
- Evaluation of project proposals
- Contracts
- Project management
- Financial module, the component Payment Request
and Financial Report (on the contract level) - Inspections and Management of Irregularities,
the component On-the Spot Inspection and
Suspected Irregularities - Monitoring.
- The Council of Ministers adopted Decree
322/6.1.2009, which provides the conditions,
process and mechanism of operation of the UMIS in
Bulgaria - On 21 January 2009 a Help Desk was opened, which
gives assistance on work with the UMIS
?????????? ???????? ???????? ????, ?????????? ?
??????????
61
62Unified Management Information System
- Tests were successfully completed and on 6 April
2009, the interface between the Unified
Management Information System (for monitoring and
control of funds from the EU Structural and
Cohesion Funds) and the SAP/R3 system was put in
operation - In accordance with Art. 10, par. 1 of the
Council of Ministers Decree No. 322 of 19
December 2008 on the Conditions, Procedures and
Mechanism of IMUS Operation, an Agreement on the
electronic exchange of data between the UMIS, the
Integrated Administration and Control System
(IACS) under the Rural Development Program and
the Project Monitoring System under the Fisheries
OP (Axter Popeye) was drafted and signed by the
Minister of Finance and the Minister of
Agriculture and Foods - The authorized personnel at the managing
authorities and the intermediate bodies is still
feeding information into the UMIS. As at 22 April
2009 there were 1,701 contracts, 6,494
applicants, 1,869 beneficiaries and 117 grant
procedures registered in the system.
?????????? ???????? ???????? ????, ?????????? ?
??????????
62
63LOTAR
- An Excel-based system was developed in
cooperation with the EC for the elaboration of
financial forecasts about the absorption of funds
from the Structural instruments - An Operational Programme Financial Implementation
Forecast Tracking Mechanism was developed and put
in place - The LOTAR implementation has given results which
reflect progress on the OP financial
implementation - The results achieved and the reported progress
have been forwarded to the EC.
?????????? ???????? ???????? ????, ?????????? ?
??????????
63
64REGULATORY FRAMEWORK (1)
- Law on Amendment and Supplementation of the
Public Procurement Act, passed by the National
Assembly on 16 October 2008. - Takes into account the Action Plan as per Annex
1 to the EC Decision (? 2008) 3937/2 of 23 July
2008 concerning the measures with respect to
financial control structures and procedures - Creates registers of persons, who by an
effective court ruling have been found guilty of
default on contract under an OP creates a
central data-base of applicants or participants
in tender procedures in accordance with Art. 95
of the EU Council Regulation (?C, Euratom) No.
1605 of 25 June 2002. - Law on the Prevention and Detection of Conflicts
of Interest, passed by the National Assembly on
16 October 2008. - Main objectives to guarantee the government and
public interest to prevent the actions of
persons in a managing position being influenced
by their personal interests or by the interests
of other related persons to create conditions
for the prevention and curbing of corruption - Limitations and bans on participation in OP
procedures or in procedures related to the
provision of EU funds.
64
65REGULATORY FRAMEWORK (2)
- Law on Amendment and Supplementation of the
State Financial Inspectorate Act, passed by the
National Assembly in November 2008 - Stepping up control over the absorption of
funds, provided out of the EU budget - Improving communication and cooperation with EU
institutions and authorities. - Creating a regime and procedures for the
application of the respective provisions of
Council Regulation ? 2185/96 (Euratom, ?C) of 11
November 1996 concerning control and inspections
on site, performed by EC controllers. - Ordinance on preliminary control over public
procurement procedures, financed in full or in
part out of European funds, adopted by the
Council of Ministers on 23 April 2009. - Preliminary control main objectives to ensure
the legality of public procurement, financed out
of European funds.
65
66REGUALTORY FRAMEWORK (3)
- CM Decree No. 197 of 5 August 2008 on the
provision of material incentives to employees,
which perform functions related to the
utilization of structural funds and of funding
under the EU pre-accession programmes - CM Decree No. 224 of 10 September 2008 on the
creation of a Council for Coordination and
Operational Monitoring of EU Funding - CM Decision No. 319 of 7 May 2009 approving the
Report on the Implementation of the JASPERS
(Joint Assistance to Support Projects in European
Regions) Action Plan in the Republic of Bulgaria
in 2008 and the Implementation of the JASPERS
Action Plan in the Republic of Bulgaria in 2009.
66
67AFCOS AND COMMISSION FOR PREVENTING AND
COUNTERING CORRUPTION
- Transferring AFCOS from the Ministry of Interior
to the Council of Ministers - Amendments to Decree of the Council of Ministers
N 18/ 2003 adopted by the Council of Ministers on
April 30th 2009 - New members of AFCOS
- New mechanism for reporting irregularities to
OLAF in force as of October 1st 2009 - Executing administrative control and checks by
AFCOS Directorate in force as of October 1st
2009 - The AFCOS Directorate will be the national
liaison body in compliance with Regulation /EC,
Euroatom/ N 1302/2008 of the Commission, dated
December 17th 2008 referring to the central data
base on elimination. - With Decree 145/12.03.2009 of the Council of
Ministers the Deputy Prime Minister Mrs. M.
Plugtschieva became the head of the Commission
for Preventing and Countering Corruption. - OLAF missions since June 2008.
68VI. Transparency and public awareness May 2008
May 2009
- 295 Information days dedicated to the
Operational Programs - 62 discussions with beneficiaries
- 6 public awareness campaigns with more than 17
thousand participants - 29 press conferences on the Operational programs
- 42 workshops
- 6 polls
69 Transparency and public awareness May 2008
May 2009
- Public Council to the Deputy Prime Minister
consisting of employers, trade unions, media and
NGOs discusses on a monthly basis the most
important topics in the EU funds management
agenda - Open door days at all Operational programs
facilitated the access to the state experts - Mobile teams explained the measures within the
framework of the Rural Development Program
regions - Hot line to the Deputy Prime Minister answers all
questions, signals and complaints related to the
use of EU funds - New web sites of the Operational Programs provide
more information and transparency
70Transparency and publicit awarenessMay 2008
May 2009
- Public presentations of the communication plans
of the Operational Programs - Consultations office on the OPs opened in the
National Association of the Municipalities in
Bulgaria - Public awareness campaigns together with the
BNTv, BNR, Darik Radio, BTA presenting the good
pre-accession programs practices - Regular press conferences of the Deputy Prime
Minister reporting on the current problems and
progress achieved - Monthly information bulletin presenting Bulgaria
in the EU - A national campaign is being launched to make
the public aware of EU Structural instruments in
Bulgaria - JASPERS office opened in Sofia
71Measures in response to the global economic and
financial crisis
- FLAG FUND
- Signing of JEREMIE and JESSICA on 27.05.2009
- Credit agreement with the EIB for 700 mln. ????
- Bridging financing facility for the
beneficiaries - Bulgaria received from the EC around 88 million
Euros additional advance payments for the OP for
2009 as an anti-crisis measure. 64 million Euro
out of this sum were provided by the European
Regional Development Fund while 23 709 197 Euro
come from the European Social Fund within the
framework of the cohesion package for 2007-2013.
The additional advance resources envisaged for
Bulgaria make up 2. The total amount received by
the country under the form of advance payments is
547 million Euro. - By Decree of the Council of Ministers 143/2009
the advance payments for projects and activities
of beneficiaries of OP Regional Development and
OP Environment were increased. The
municipalities receive advance payments that
amount up to 20 of the EU financial support as
well as national co-financing for infrastructure
projects to the amount of 1 million and more and
up to 30 of the EU financial support as well as
national co-funding for all other operations they
are beneficiaries of. The NRIA (National Road
Infrastructure Agency) receives advance payments
that amount up to 20 of the EU financial support
and national co-financing for projects it is a
beneficiary of. - 28 million Euro were provided within the
framework of Rural Development Program (RDP) as
an additional package for the funding of
renewable energy sources - Reduced deadline for the interim payments (15
days).
72USE AND CONTROL OF EUROFUNDSHIGHLIGHTS FOR 2009
- Infrastructure development transportation,
environment, regional development - Support for small and medium size enterprises in
a global economic crisis environment - Speeding up the project implementations and
achieving synergy effect in the OPs. - Guaranteeing of transparency and effective
control - Achieving positive Compliance assessment of the
management and control systems of the OP
73European funds
74- Not that is difficult we do not try,
- it is difficult because
- we do not try
- SENECA