CostBenefit Analysis: Kingsford Manufacturing Company Parsons, WV - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

CostBenefit Analysis: Kingsford Manufacturing Company Parsons, WV

Description:

Cost-Benefit Analysis: Kingsford Manufacturing Company Parsons, WV ... http://www.cep.unep.org/pubs/Techreports/tr32en/fig5.gif. Mitigation Analysis. Levee ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 16
Provided by: josephcarr
Category:

less

Transcript and Presenter's Notes

Title: CostBenefit Analysis: Kingsford Manufacturing Company Parsons, WV


1
Cost-Benefit AnalysisKingsford Manufacturing
Company Parsons, WV
  • Joseph Dillon
  • Thomas Hogdahl
  • Nic Moore
  • Han Nguyen

2
Introduction
  • Kingsford Manufacturing Company
  • 100,000 tons of charcoal per year
  • Provides 23 Million directly to
  • Parsons economy per year
  • Parsons, West Virginia
  • Rural coal-mining town
  • Problem for KMC
  • Plant located in 100-year flood plain
  • Flood mitigation

3
Economic StatisticsShowing importance of KMC
plant
factfinder.census.gov
factfinder.census.gov
factfinder.census.gov
4
Flood History
  • 3 Major Floods
  • November 1985
  • From impact of Hurricane Juan
  • 11 million in flood damage
  • Flood of 1996
  • From Blizzard of 1996
  • 3 million in flood damages
  • May 1996
  • 1 million in flood damages

fema.gov
5
Peak Flow Analysis
Daily
Yearly
usgs.gov
usgs.gov
6
Plant Location
maps.google.com
7
FEMA Insurance Rate Maps (FIRM)
fema.gov
8
Mitigation Analysis
  • Diversion Swale
  • Long grass covered channel
  • 2-foot deep by 2-foot wide

http//www.cep.unep.org/pubs/Techreports/tr32en/fi
g5.gif
9
Mitigation Analysis
  • Levee
  • 3,400-foot earthen levee 6 to 12 feet high
  • Three sides of compound

http//www.design.upenn.edu/landscape/student/miss
issippi/hydraulics/levee/images/aerial20levee.jpg
10
Mitigation Analysis
  • Cut-off wall and toe drain
  • Impermeable 2-foot barrier
  • Drain collects accumulation

11
Mitigation Analysis
  • Pumping Stations
  • 10 thousand gallons per minute
  • Lower elevations of compound
  • Total Mitigation
  • 2.85 million
  • Saves 4 million in damages

12
Possible Mitigation
  • Relocation
  • Flood Wall
  • Elevating Equipment
  • Hardening equipment

13
Costs
  • Costs were analyzed for the four tactics used at
    the site.
  • The total cost for implementing these systems in
    2008 came to about 7.7 million.
  • This number was generated by using values
    provided by FEMA, the EPA, and various other
    sources.

14
Benefits
  • The value of the protection provided by these
    tactics in 1985 was approximately 3.9 million
    dollars.
  • Adjusting this value to 2008, the values because
    roughly 8 million.

15
Cost-Benefit AnalysisConclusion
  • Costs 7.7 Million
  • Benefits - 8 Million
  • ...it is clear that the measures taken by
    Kingsford Manufacturing Company to protect its
    manufacturing facilities in Parsons, West
    Virginia were cost effective and worthwhile.