Title: Why the Present Shielding Plan was Abandoned.


1
Why the Present Shielding Plan was Abandoned.
  • Radiation levels in the area of the collimators
    meant that it would require several crews to
    complete the shielding job.
  • The awkwardness of location made it likely that
    the beam pipe or bellows would be damaged
    particularly if we had multiple crews trying to
    work quickly.
  • The existing design did not allow for servicing
    of the motors, LVDTs, or vacuum flanges without
    unacceptable radiation exposure.
  • There was no provision for the eventual removal
    of the system.
  • Conclusion Remove collimators and do it right.

2
Conceptual Design of Collimator
  • Integrate collimator and enough shielding for at
    least twice present Booster flux at 1 high field
    scraping into a movable system which can be
    assembled externally and installed quickly ( 1
    day)
  • Design must include a clear plan to scale up to
    the full shielding (MiniBooNENuMI _at_ 2
    scraping).
  • After extended operation at full flux
  • There must be a reasonable method for servicing
    the motors and LVDTs.
  • There must be a reasonable plan to remove the
    central collimation system (coffin) in the
    event of a catastrophic failure (e.g. vacuum
    leak).
  • There must be a reasonable plan to remove the
    entire system in the event Santa brings us a new
    Booster.

3
Some Ground Rules
  • No quick and dirty temporary solutions. What
    goes in, stays in.
  • No partial designs. Nothing goes in until we have
    a clear plan for the whole system.

4
Some Desirable Features
  • Use existing mover system, if reasonable.
  • Use as much of the steel as reasonable.

5
Basic Design Choices
  • Movable collimator inside a central coffin, all
    on rolling cart, around which full shielding
    could later be placed (Larrys 11th hour
    solution).
  • Bed of steel placed down first, central
    collimation system placed on top ( how ?)
  • Collimator fixed inside central shielding steel.
    Entire assembly is moved.

6
Goal
  • Settle on broad features of design, and move
    ahead.
  • Peter Kasper will be in charge of the project (I
    will cover for him until he gets back).
  • Summer is soon than you think.
Write a Comment