Title: PELC 2005
1GE Advanced Materials Outsourcing Process and
Document handling of the Bergen op Zoom Plant
Engineering Department Jan Hellings
2A global and diversified technology, media, and
financial services company.
Commercial Finance
Energy
Transportation
Healthcare
NBC Universal
Consumer Finance
Infrastructure
Consumer Industrial
Advanced Materials
Insurance Solutions
Equipment Services
3A company with a strong track record of
performance for all stakeholders
Automotive Plastics Polymershapes Quartz Sealants
Adhesives Silicones Specialty Film Sheet
2003 Revenues (USD billions)
- Advanced Materials
- Commercial Finance
- Consumer and Industrial
- Consumer Finance
- Equipment Services
- Energy
- Healthcare
- Infrastructure
- Insurance
- NBC-Universal
- Transportation
- Total GE Consolidated Revenue
7.0 20.8 12.8 12.8 4.4 19.0 10.1 3.0 26.2 6.8 13.5
134.1
4A company whose actions and values go hand-in-hand
Actions
Values
5Our Company has Global Reach 15,000 Employees
in 79 Locations in 21 Countries
4
4
2
1
4
1
2
31
1
2
6
2
4
2
3
2
2
1
3
1
1
Locations worldwide, includes manufacturing,
technology and joint-venture sites
79
6GE Advanced Materials BOZ
- 6 Compounding Plants
- Noryl
- Lexan
- FCP
- Lexan-sheet
- Slilicones
- Azdel
- 6 Chemical Plants
- 2 BPA Plants
- PC Resin
- Phosgene Plant
- Chlorine Plant
- PPO Plant
7The need
TOP down directive
- Problem definition
- We had to hit our indirect spend and headcount
targets in a fast and effective way. - We created a leaner organization meaning 67
reduction of our GE-AM engineering headcount (9
to 3 FTEs) and all engineering freelancers
(ca.40FTEs) - This had a direct impact on how we can execute
projects.
GE-AM personnel focus on core activities Cost
Variable with demand Optimal use of external
expertise Respecting company regulation and
legislation
Change Systems and Structures to Maintain
Performance
8Finished good
Raw mat.
Production
Technical Support Organization
- Content of Agreement with
- Engineering Service Provider
- Project management risk control full cycle
- in Time, Cost and Quality
- Engineering services
- Procurement
- Specs and Standards
- Document Control
- Consultancy
- Environmental, health, Safety Risk
- Maintenance
- Strategy
- Safe reliable Operation
- Cost variable with demand
- Optimize usage of external expertise
- GE-AM-Focus on core activities
- One team One approach, Synergy
- Compliance to Asset (psm)
- integrity legislation
9 The Model
Described in an outline strategy
- Selection criteria
- Flexibility / Ability to adopt GE culture .
- Understand the Vision/Strategy
- Price
- Size of Organization
- Global Player
- Local Presence
- EHS Performance
- Management Commitment
- Level of knowledge GE facility
- Both Services Project management
- Proven capability, benchmarked
Engineering Service Contract
Project Identification
Scope Definition
Operation Close-Out
Project Deliverables
T 3
T 4
T 5
T6
DFSS Checkpoints
Project Identification
Scope Definition
Conceptual Design
Basic Engineering
EPC Comm
Operation Close-Out
T1
T2
T3
T4
T5
T6
GE-AM DFSS process owned by GE- project owner
GE-AM selected
10DFSS approach as a Tool
Big Ys External CTQs Growth
Customer satisfaction EHS Employee
satisfaction Cost
Virtual defect free Improvement Meeting all CTQs
Project Identification
Scope Definition
Conceptual Design
EPC Comm.
Operation Close-Out
Basic Engineering
Aker Kvaerner
GE
GE
Project Specification Work Order
CDP GEP Purchase order
Commis- sioning Pinkcard
BEP Release for Construction
Close-Out Blue card
E-MOC
GAP 20
Sourcing
GATS/WtW
DFSS
1 Process for all Projects
11DFSS approach as a Tool
CDP
BEP
EPC
GEPE drives, Service Provider Powers
12 GE-AM systems
GE-AM project owner
Wing to Wing (Investment system)
Aker Kvaerner project owner
Aker Kvaerner acting as if they are GE-AM
13Document Management between GE-AM and Aker
Kvaerner
14What is system contracting
The next step
System Contractor
Basic Engineering
Conceptual engineering
GE
Basic Engineering
Engineering Procurement Construction
Conceptual engineering
GE
Engineering Procurement Construction
GE
Construction E/I
Construction MP
System Contractor
GE
GE
Construction MP
Construction E/I
Construction P/A
Construction Support
Construction P/A
Construction Support
GE
15Success is all about timing.
Good Plan Strategy