Section 20 Command Data Handling (CDH)
. . . Philip Luers NASA/GSFC
. . . Steve Schumacher Swales Aerospace, Inc.
2
ACDS Contents
  • Block Diagram (for reference)
  • Recent Activities
  • Residual Risk
  • Problem Reports
  • Special Topics
  • A/D converter anomaly
  • MOC timekeeping
  • Statement of Readiness

3
ACDS Box Block Diagram
Power System Electronics (PSE)
1773 Fiber Optic Data Bus
ACE
CDH
Inertial Reference Unit (IRU)
Coarse Sun Sensors (4x)
GPS Receiver (GPS)
Three-Axis Magnetometer (TAM)
HOP Actuators (HOPS)
Autonomous Star Tracker (AST)
Light Flex Solar Array (LFSA)
Reaction Wheels (RWA, 3x)
WARP Science Data Recorder
Magnetic Torquer Bars (MTB, 3x)
S-band Transponder
Reaction Control System (RCS)
Spacecraft Heaters (Bays 1-6)
Pulsed Plasma Thruster (PPT)
Spacecraft Temperature Sensors
Solar Array Drive (SADA/ECU)
Solar Array (Hinge pots and Htr)
Solar Array (Dep HTR and pot)
Solar Array Drive Temperature
Umbilical and APTS Racks
4
As Run Verification Matrix
5
Projected Power On Time
6
ACDS Recent Activities (1 of 2)
  • Recent changes to the verification matrix since
    the initial red team review
  • None
  • Configuration changes since the initial red team
    review
  • None
  • Recent test results associated with T/V II
  • Trending results showed no correlation of changes
    of voltage nor current with temperature of ACDS
  • 4 temperatures, 4 voltages, 4 currents every 5
    minutes for a total of 135,924 points
  • S/C timekeeping verification performed
  • GPS ON verified to be identical in character to
    test results from 12/15/99
  • GPS OFF verified to be identical in character
    to TV I results

7
ACDS Recent Activities (2 of 2)
  • Technical peer reviews since the initial Red Team
    Review
  • None
  • Operating time since last modification
  • Total on time since beginning of environmental
    test
  • 7/31/99 - 7/28/00 2553 hours on spacecraft
  • On time since last modification (Interpoint power
    converter stiffener rework)
  • 3/13/00 - 7/28/00 679 hours on spacecraft
  • Open action items
  • None

8
ACDS Residual Risk
  • Remaining work to be completed
  • None
  • Open action items that are still being worked
  • None
  • Open test anomalies
  • None
  • Could-not-duplicate test anomalies
  • None
  • Redbook candidates
  • None

9
ACDS Problem Reporting
  • Flight Hardware Issue
  • WOA 1095-20-5 185-1509 RCS Tank Pressure
    telemetry point varying by 3 PSI. Telemetry is
    toggling from 77F to 784 hex with no intermediate
    values
  • See A/D converter special topic. Use as is.
  • Misinterpretation of test results by ACDS Lead
  • WOA 1099-20-23 Spacecraft time jumping
    erratically with GPS ON. Behavior with GPS OFF
    is nominal
  • Magnitude of time jumps (with GPS ON) is 1-2 ms,
    mostly below 1 ms. Review of test data from
    12/15/99 showed that this is nominal behavior.
    ACDS Lead did not have access to prior test data
    when PR was opened. Requirement for spacecraft
    time to be no greater than 10 ms away from ground
    time is met with 80-90 margin.

10
Special Topic A/D Conversion Anomaly
. . . Harry Culver EO-1 CDH Systems Lead
11
Special Topic A/D Converter
  • A/D conversion anomalies during MAP MAC box-level
    thermal vacuum led to investigation
  • Stuck LSBs were found near A/D converter decision
    points (½-scale, ¼-scale), referred to as holes
    in data
  • Readings of smoothly varying signals stick at
    point below decision point and then jump point
    above with no reading in between (for example 7F4
    straight to 804)
  • All affected EO-1 subsystems in agreement at
    initial red team review that systems could be
    used as is
  • Investigation of cause was undertaken by GSFC
    Code 561
  • Performed extensive probing of MAP MAC
    housekeeping RSN ETU on extender card to identify
    character of signal
  • Modified software to perform various instructions
    before start of conversion, and during
    conversion, noted high correlation between
    instructions and noise on analog signals

12
Special Topic A/D Converter
  • Determined cause and recommended solution
  • ESN MCM (which includes microprocessor and analog
    in same package) has A/D converter analog signal
    input pin and instrumentation amp signal input
    pin interspersed with digital signals
  • Source of noise is coupling of instruction
    address and data bus onto A/D input and
    instrumentation amp input pins
  • MAP Flight Software engineer assisted in
    determining optimum instruction mix before start
    of conversion and during A/D conversion that made
    analog signals quietest and eliminated holes in
    A/D data. Tested on MAP HK RSN and others.
  • Impact of flight software change to ACE, PSE, and
    HK RSNs was too great to implement at this point
    in program
  • All subsystems in agreement that use as is is
    best policy
  • Lowest 4 bits of A/D converter value are
    operationally unimportant

13
Special Topic MOC Timing
. . . Harry Culver EO-1 CDH Systems Lead
14
Special Topic MOC Timing
  • Verified proper operation of S/C timekeeping
    12/99
  • S/C verified with GPS ON, within 1 ms of ground
  • S/C verified with GPS OFF, drift was measured and
    demonstrated compensation features of flight
    software
  • Testing of the ground system was not complete at
    time of initial Red Team Review
  • Ground station PTP generates ground time-tag of
    incoming marked frame.
  • MOC software compares ground time-tag with
    telemetered S/C time of marked frame. Accounts
    for delays through flight system and ground
    system, and calculates difference to 1 ms
    resolution.
  • PTP was unable to time-tag data to high enough
    accuracy to meet 10 ms requirement

15
Special Topic MOC Timing
  • Ground station PTP hardware and software were
    modified
  • Fixed problems that arose due to telemetry
    sequence breaks
  • Ground station personnel assembled procedure for
    correct usage of PTP
  • Fixed drift problem with PTP
  • Performed retest of PTP in full ground station
    configuration 7/18/00 during Thermal Vacuum II
  • PTP version 1.49 software and drivers
  • Same time reference configuration
  • Operational MOC software
  • No retest required

16
Summary of Open Items from MarchRed Team Review
  • Test and Verification flow -- no update necessary
    (page 19-13)
  • Verification Matrix -- no update necessary (page
    19-14)
  • PR 797-70-02 Bus Buster showed non-uniform
    distribution of retries when run with minimal
    spacecraft bus traffic (page 19-16)
  • Further bus busting retest was performed
    following March Red Team Review with expected
    uniform distribution of retries
  • PR 818-20-02 MOC issued commands when not enabled
    for commanding (page 19-16)
  • MOC and IT have successfully handed over dozens
    of times without confusion and loss of commands.
    Issue resolved.
  • Updated operating hours are included in this
    package on page 20-5 (page 19-19).
  • Results of retest of Ground System time
    correlation verification (page 19-21 and 19-25).
  • Retest detailed in special topic. Issue resolved.

17