Title: National Vision: Making Accelerated Bridge Construction Standard Practice
1National Vision Making Accelerated Bridge
Construction Standard Practice
IOWA DOT Accelerated Bridge Construction Workshop
Aug 11-12, 2008
By Vasant Mistry Federal Highway
Administration vasant.mistry_at_fhwa.dot.gov
2Topics
- Accelerated Bridge Construction
- Standardizing Prefabricated Bridge Elements and
Systems (PBES) - A 6 Minute Video of Pier Construction using
Prefabricated Columns and Caps - Available Tools and Resources
3Accelerated Bridge Construction
- is to build the bridge first before you set
cones, - then quickly move it into place like in hours
or a weekend!
4Standardizing Prefabricated Bridge Elements and
Systems
5Precast Abutments
6Precast Abutments
7Precast Piers
8Precast Piers
9Precast deck on precast concrete girders
10Precast Decks on Steel Framing
11Precast Decks
12FRP Decks
13Total Bridge Prefabrication
14Total Bridge Prefabrication
15Superstructure Prefabricationwith Continuity
16Superstructure Prefabricationwith Continuity
17Retaining Walls
- Mechanically Stabilized Earth Walls
- Precast Gravity Walls
- Precast Cantilever
18A 6 minute video on pier construction using
prefabricated caps and columns
19Available Tools and Resources
- Learn more
- www.fhwa.dot.gov/bridge/prefab
- Tools
- Decision-Making Framework for the Use of
Prefabricated Bridges - Self-Propelled Modular Transporters (SPMT) Manual
- Connection Detail Catalog for PBES
- FHWA ABC Workshops for DOTs
- FHWA Contacts
- Vasant Mistry at Vasant.Mistry_at_dot.gov
- Kathleen Bergeron at Kathleen.Bergeron_at_dot.gov
20Prefabricated Bridge Elements and Systems (PBES)
- PBES offers significant advantages over
Cast-in-place construction - Reduces onsite construction time
- Reduces Traffic and Environmental impact
- Lowers First and Life-Cycle Costs
- Improves Safety and Quality
-
21Thank You
Accelerated Bridge Construction