Title: SNS INSTRUMENTS OVERVIEW


1
SNS INSTRUMENTS OVERVIEW
HYSPEC IDT Meeting
  • R. K. Crawford
  • Instrument Systems Senior Team Leader

September 10, 2004
2
The Spallation Neutron Source
  • The SNS will begin operation in 2006
  • At 1.4 MW it will be 8x ISIS, the worlds
    leading pulsed spallation source
  • The peak neutron flux will be 20100x ILL
  • SNS will be the worlds leading facility for
    neutron scattering
  • It will be a short drive from HFIR, a reactor
    source with a flux comparable to the ILL

3
Target Region Within Core Vessel
Target Module with jumpers
Outer Reflector Plug
Target
Moderators
Core Vessel water cooled shielding
Core Vessel Multi-channel flange
4
Instrument Layout
5
Instrument Status
  • Final design review for 5 SNS Project instruments
    Sept 28-Oct 1
  • Installation has started
  • Evacuated scattering tank for backscattering
    spectrometer
  • Core vessel inserts
  • First 3 ready for commissioning April 2006
  • CNCS and ARCS progress review held in August
    both scheduled for completion by end of FY2006
  • SNAP and SEQUOIA preliminary design review held
    in May both currently undergoing baseline
    review and scheduled for completion in 2008
  • Other instruments in various stages of design

6
Instrument Installation has begun!
13th March
7
Installation
8
Core Vessel Inserts
Core vessel inserts in various stages of
fabrication and assembly
9
SNS Component Development/Support
  • Data Acquisition System
  • Detectors
  • Neutron Choppers
  • Sample Environment
  • Analysis Software

10
Data Acquisition
  • Basic hardware and software components for data
    acquisition all exist in prototype form. System
    design is standard to all instruments.
  • Integrated system demonstrated provided at April
    EFAC meeting

11
Detector Selections
12
Neutron Choppers
  • Fabrication and assembly of T0 chopper for powder
    diffractometer underway.

BW Choppers for Backscattering Spect.
  • Five 60-Hz bandwidth choppers have been delivered
    by Astrium, and have completed testing in the
    chopper lab at Argonne.
  • Second procurement for 60-Hz bandwidth choppers
    has been awarded to Revolve. These will be
    magnetic bearing choppers.

13
Sample Environment Activities
  • Standards
  • Documented standards for sample environment
    mechanical interfaces to instruments
  • Communication protocols developed and
    standardized
  • Functioning communication system tested
  • Prototype development
  • Procuring several equipment items to develop
    sample holders, cryostat tails, etc
  • SBIR/STTR with Containerless Research, Inc to
    develop automated sample changing at low and high
    temperatures
  • Developing rapid-change refrigerator in
    collaboration with Penn State

14
Sample Environment Activities contd
  • Basic suite of general sample environment
    equipment will be procured in FY06-FY07 using
    operating budget
  • Inventory will be adequate to meet all needs for
    standard sample environments
  • Operating staff adequate to support needs for all
    operating instruments will be ramped up beginning
    in FY2005
  • Working with user groups to identify needs and
    pursue development of equipment for specialized
    sample environments
  • White paper and draft policy on magnetic field
    interference issues
  • Self-compensated high-field magnets

15
Analysis Software
  • SNS is assuming an active role in the development
    of data analysis software
  • The NESSI workshop to document requirements for
    such software was held at SNS October 13-15, 2003
  • Draft requirements document prepared
  • SNS team leader for scientific computation (Steve
    Miller) on board
  • Preliminary implementation plan prepared
  • Extensive international collaboration
  • Part of team is already at work

16
Present Experimental Facilities Organization
17
Summary
  • 16 instruments in various stages of design,
    procurement, and installation (5 of them in SING
    Project)
  • Common components infrastructure development is
    active data acquisition, detectors, choppers,
    sample environment, analysis software
  • Starting to change staffing mix to support
    installation and operation
  • First instruments begin commissioning in 2006