Title: Figures of the RWTH 2004
1Figures of the RWTH (2004)
- Staff 10.000 (11.469 incl. Affiliated
Institutes, FhG) - 80 Study programs
- 418 Professors
- 2.000 Academic staff
- 2.000 Non-academic staff
- Students
- 28.454 Students in total
- 5.374 Newly enrolled students (WS 05/06)
- Research network
- 15 Collaborative research centres
- 11 Affiliated Institutes, 4 Fraunhofer Institutes
(FhG) - 6 Graduate Colleges
- Total turnover 510 (593) Mio.
- Basic funds 368 Mio.
- External funds 142 Mio.
- Affiliated Institutes and FhG 83 Mio.
Source Dez. 6
2Faculty of Mechanical Engineering 2004
- Staff 2.204 (3.152 incl. Affiliated Institutes,
FhG) - 50 Professors
- 120 Tutors, lecturers from research and industry
- 640 Academic staff
- 540 Non-academic staff
- 854 Student co-workers and scientific staff
- Degrees
- 356 Graduates
- 171 Doctorates
- Students
- 5.625 Students in total
- 1.362 Newly enrolled students (WS 05/06)
- Total turnover 123,1 (173,8) Mio.
- Basic funds 72,4 Mio.
- External funds 50,7 Mio.
- Affiliated Institutes and FhG 50,7 Mio.
Sources Dez. 6 RWTH-Zahlenspiegel, 2004
3Financing of Faculty of Mechanical Engineering
2004 (2003)
Affiliated Institutes, FhG 50,7 Mio.
External funds 50,7 (53,1) Mio.
Basic funds 72,4 (69,3) Mio.
Source Dez. 06, Stand 2004
4Equipment Planning
Calculation base 208 positions for academic staff
Basic equipment Teaching Research W3
(C4) 3WM according to calculation
Dissertations and W2 (C3) 1WM of load , without
diss. external funds approx. 78 load
approx. 22 load ? ? 126 positions ? ? 64
positions ? ? 18 positions ? approx. 60
load ? approx. 31 ? approx. 9 (approx. 40
teaching, approx. 20 research)
Faculty service pool long-term control of
teaching load target 20 of faculty median
Total Teaching approx. 70
Research approx. 30
5Extension of the Premises IKA / WZL
Institut für Kraftfahrwesen Extension of the
office building of the FKA as offices for the
IKA, now it covers twice as much space as before.
Werkzeugmaschinenlabor The building, which has
been constructed since may 2003, has been in use
since 11.10.2004 (costs approx. 16 Mio. , 4.000
m² total area).
6Extension of the Premises IKV / ITA
Institut für Kunststoffverarbeitung Start of
construction was in the beginning of 2004, the
topping-out ceremony on 13.08.2004 and the
inauguration on 25.11.2005 ( costs 9,8 Mio. ,
2.300 m² total area ).
Institut für Textiltechnik The laboratory
building accomodates a prime spinning and
texturing installation total area 600 m², costs
1.5 Mio. . It is in use since 23.11.2004.
7Extension of the Premises VKA / ZMB
Lehrstuhl für Verbrennungskraftmaschinen The
exhaust roller dynamometer test bench of the
chair offers 1.100 m² total area with costs of
3,5 Mio. .
Zentrum Metallische Bauweisen With total costs of
1,9 Mio. and about 1.000 m² total area this
building accommodates a laboratory for a group of
6 professors (Bildsame Formgebung,
Eisenhüttenkunde, Kraftfahrwesen,
Schweißtechnische Fertigungsverfahren, Stahlbau,
Werkstoffwissenschaften).