Title: Equipment Status


1
Equipment Status
  • ARCS equipment status
  • Single module and 4 hybrid
  • DAQ equipment status
  • Vienna box, Single rod, Multi-rod
  • Needed Spares
  • Mostly power supplies

2
ARCS equipment-modules (UCSB)
  • UCSB need 1 DEPP and 1 LED board for 3rd module
    stand
  • Should ship next week (LED system 2 months away)
  • UCSB also needs to rotate the 3 ARCS controllers
    here with 3 with new firmware
  • Otherwise, false problems found
  • Bad MUX in fast test
  • High noise channels in noise
  • Low injection channels in Pinhole/Cal Injection
    Test
  • Should ship next week
  • DEPP boards all inject noise into system
  • Sending 3 TOB modules to Aachen for DEPP debug
  • Need to use Keithley until problem fixed
  • New order of Keithley needed

3
ARCS equipment-hybrids (UCSB)
  • UCSB 4 hybrid thermal cycler functional
  • Critical equipment (spares)
  • Old ARCS controllers (Correct trigger stuffing)
  • No old spares, but new ARCS boards maybe stuffed
    correctly
  • NIM components
  • Spares of all modules in-hand
  • A spare NIM crate would be good
  • Peltier Power Supply
  • Need to order spare from CERN Electrics Pool
  • Peltier element
  • In hand
  • Coolie Box
  • 1 spare in US in hand by next week

4
ARCS equipment-modules (FNAL)
  • All 4 stands fully operational
  • Use DEPP boards- Do you see same problem?
  • Which version of firmware in ARCS controllers?
  • With new firmware delay between clock and ARC ADC
    clock 2-3 ns
  • With old firmware delay closer to 7-8 ns
  • Need to send back all ARCS controllers with old
    firmware for upgrade
  • Are DEPP boards injecting noise into system?
  • Causes higher noise in opens and sensor edges
  • 2 Keithley HV supplies on site sufficient back up

5
ARCS equipment-hybrids (FNAL)
  • 4 hybrid thermal cycler functional
  • Critical equipment (spares)
  • Old ARCS controllers (Correct trigger stuffing)
  • Lenny indicate FNAL has at least one additional
    old controllers
  • NIM components
  • Spares of all modules and crate in-hand
  • Peltier Power Supply
  • Need to order spare from CERN Electrics Pool
  • Peltier element
  • Did we order this???
  • Coolie Box
  • 1 spare in US by next week

6
ARCS equipment-hybrids (Mexico)
  • 4 hybrid thermal cycler in assembly
  • All ARCS equipment in hand next week
  • Critical equipment (spares)
  • Old ARCS controllers (Correct trigger stuffing)
  • No spares on site, will have to be sent by
    UCSB/FNAL
  • NIM components
  • Spares of all modules in-hand
  • NEED NIM CRATE SPARE
  • Peltier Power Supply
  • Need to order supply spare from CERN Electrics
    Pool
  • Peltier element
  • Need to order spare

7
Vienna Box (FNAL UCSB)
  • Both Vienna Boxes operational
  • UCSB Peltier power supply is having switching
    problem (see below)
  • Enough adapter boards in-hand to make second set
    of cold plates
  • UCSB needs 10 TEC adapter boards for cold box
  • Should be delivered next week
  • Critical equipment
  • All spare DAQ equipment in hand except
  • No spares for eMUX components
  • Will order 1 spare set of each component as US
    spare pool
  • TPO
  • Can take from single rod stand if needed (Will
    need 3 FED per single rod stand w/o TPO)

8
Vienna Box (FNAL UCSB)
  • Critical equipment
  • Peltier power supply
  • Both sites have had fuse housing melt and UCSB
    supply is not switching correctly
  • Ordered spare power supply per site (Delivery in
    2 months)
  • LV Power supply
  • UCSB had high current Leader power supply
    overheat, replaced with Agilent PS for single
    rods
  • Need to order spare Agilent PS (E3633A) for each
    site
  • Should I do this?

9
Rod Test Stands
  • All DAQ equipment in hand except for
  • TPO-like object
  • Both multi-rod stands need this spares
  • No idea when this will arrive
  • Electrometer
  • No clear if we will ever get this
  • Should we try to find acceptable multi-channel
    nano-anameter
  • Need to run stands to see weak points
  • Potential problems
  • DELPHI PS failures
  • MUX failures
  • oFED/oFEC failure
  • Not clear if spares are sufficient (or if we even
    have all we need) until stands operational

10
Total Equipment Needed (Not Already En-route)
  • 3 NIM Crates
  • 4 Peltier PS
  • 2 Peltier Elements
  • At least 4 TPO-like objects
  • 2 Agilent E3633A PS
  • At least 1 Keithley PS
  • 4 Electrometers (or equivalent)
  • eMUX spares