Diesel Emissions - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Diesel Emissions

Description:

Diesel Emissions Emissions Task Force Divided into 6 sub groups Locomotive Group Car Group Ventilation Group Fuel Group Emissions Testing Group Funding Group Metra's ... – PowerPoint PPT presentation

Number of Views:465
Avg rating:3.0/5.0
Slides: 21
Provided by: JTre6
Category:
Tags: diesel | emissions

less

Transcript and Presenter's Notes

Title: Diesel Emissions


1
Diesel Emissions
2
Emissions Task Force
  • Divided into 6 sub groups
  • Locomotive Group
  • Car Group
  • Ventilation Group
  • Fuel Group
  • Emissions Testing Group
  • Funding Group

3
Metra's Testing Timeline
  • 3 Phases
  • Phase 1 Rail cars
  • Phase 2 Station Platforms
  • Phase 3 Engineer locomotive cabs, cab cars, and
    shops

4
Phase 1 Rail Cars
  • Three sampling sites per train, first two cars
    after engine and rear cab car
  • Testing runs already completed on Rock Island,
    Burlington Northern, Milwaukee District, and
    Union Pacific as of this week.

5
Diesel Exhaust Components
  • Particulate matter
  • Polynuclear aromatic hydrocarbons
  • Carbon (elemental and organic)
  • Aldehydes
  • Benzene
  • Carbon monoxide
  • Nitric Oxide
  • Nitrogen Dioxide
  • Sulfur Dioxide

6
Metra's Testing Protocol
  • Direct read instruments
  • Provides real time data collection
  • Sampling for Total Particulate, PM 2.5, Carbon,
    Carbon Monoxide, Nitric Oxide, Nitrogen Dioxide,
    and Sulfur Dioxide
  • Includes same aethalometer used in Tribune
    article

7
Metra's Testing Protocol
  • Active sampling instruments
  • Provides laboratory analytical results
  • Sampling for Polynuclear Aromatic Hydrocarbons,
    Benzene Vapors and Carbon

8
Metra's Testing Protocol
  • Metra Locomotive Tiers
  • Unregulated
  • Tier 0
  • Tier 0
  • Tier 1

9
Relevant Regulatory Agencies
  • EPA Environmental Protection Agency
  • Establishes National Ambient Air Quality
    Standards
  • Establishes Locomotive Standards

10
Relevant Regulatory Agencies
  • OSHA Occupational Safety and Health
    Administration
  • Deals with occupational exposure and establishes
    permissible exposure limits for employees

11
Relevant Regulatory Agencies
  • No exposure guidelines for elemental carbon or
    black soot have been established for the general
    public (Metra's ridership)

12
Metra In-House Committees
  • All Groups have had a committee meeting
  • Emissions Testing Group
  • Established no regulatory agency has a threshold
    for carbon 2.5 or nano-particles and therefore
    has no level established
  • Asking group to come up with recommendation
    based on a study or guideline

13
Metra In-House Committees
  • Locomotive Group
  • Exhaust after treatment (Doc)
  • 25 particulate reduction on Tier 0, Tier 1, Tier
    0
  • Engine changes to turbocharger and possible
    injectors

14
Metra In-House Committees
  • Car Group
  • Filters
  • Air intake on cars
  • Car pressurization
  • Ventilation design of older cars for future
    changes during rehabilitation

15
Metra In-House Committees
  • Ventilation Group
  • Working with Amtrak to discuss contracts and
    agreements with adjacent building owners for
    maintenance and operation at CUS
  • Procedures for shutting down equipment and using
    standby power at all locations

16
Metra In-House Committees
  • Fuel Group
  • Switching to Ultra Low Sulfur Diesel Fuel (ULSD)
    April 1, 2011
  • Has industry proven reduction in particulate of
    8
  • Fuel additives were discussed and not a
    verifiable reduction
  • Alternate fuels
  • Grants have recently been awarded to look at
    Bio-Diesel

17
Metra In-House Committees
  • Funding Group
  • Small allocation are only available which we
    will pursue
  • Metras needs are significant to reduce these
    emissions and will require a large capital
    investment

18
Phase 2 Station Platforms
  • Air sampling completed at Chicago Union Station
    in July 2010
  • Sampling to be performed at Ogilvie
    Transportation Center and LaSalle Street Station
    in January 2011

19
Phase 3 Engineer Cab Cars
  • Plans to test engineer locomotive cab and cab
    cars after station platforms
  • Identify any engineer exposure during a work day
  • Test our shops and layover facilities

20
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com