Title: Consumption-based Planning
1Consumption-based Planning
2Material Planning
Material Planning (MRP Procedures)
SAP Terms
Independent Demand (Consumption-based Planning)
MRP-Material Requirements Planning
Reorder point planning
Forecast-based planning
Time-phased planning
SAP Exercise
Manual reorder point
Automatic reorder point
3Planning Process
Can be automatic
4Planning Process
- Planned Order
- Recommendation by the MRP planning process of
quantity and timing of production or purchase
order - Production Order
- Actual order given to shop floor to commence
production. May be electronic or paper. Can
include production details (routing, quality
requirements, drawings, instructions, etc.)
5Planning Process
- Purchase Requisition
- Request to purchasing to create purchase order
- Purchase Order
- Request to vendor to supply materials
- Schedule Line
- Direct request to vendor for materials, covered
by scheduling agreement (blanket PO)
6Reorder Point Processing
Lot Size
Reorder Point
Safety Stock
Time
Replenishment Lead Time
7Reorder Point Processing
- When the inventory level for a product that is
planned using consumption-based planning reaches
the ROP, an order for the material is NOT created
automatically - Consumption-based planning uses the Material
Requirements Planning (MRP) planning process to
create purchase orders - The MRP planning process is typically run
overnight on a daily basis - Historically, might have used weekly runs
- Time until MRP planning run is executed should be
considered in ROP calculation (daily runs, add 1
day to lead time)
8Forward Scheduling forExternal Procurement
9MRP Planning Process
- For a company with thousands of materials to
plan, the computing resources needed to calculate
material plans can be significant - To make sure that
- Only those calculations that are necessary are
performed - Only on materials that need planning
- Two filters are used
- Planning Run Type
- Planning Horizon
10Planning Run Types
- NETCH Net change in the total horizon
- In the MRP Planning Process, materials are
planned if there have been any - Changes in material stocks (receipts, issues)
- Addition of purchase requisitions, purchase
orders, planned orders, dependent requirements - Changes in Material Master Data (Lot Size, ROP,
etc.)
11Planning Run Types
- NETPL Net change in the planning horizon
- Same at NETCH, EXCEPT
- Changes must occur within the planning horizon
- Planning horizon keeps MRP planning process from
making plans for future periods that - Do not impact current operations
- Will be made irrelevant through the dynamics of
business
12Planning Run Types
Order/ Requisition
Requirement
Time
13Plant Parameters Planning Horizon
14Planning Run Types
- NETUPL Regenerative Planning
- Plans all materials for total planning horizon
- Good idea to run this option regularly (e.g.
every weekend), even though it is more resource
intensive - Customizing changes dont trigger planning under
NETCH or NETPL - Time passage problem with NETPL
15NETPL Potential Problem
Planning Horizon
NETPL
Today
Passage of time is not an event Would require
monitoring to detect
Planning Horizon
NETPL
Today
Solution Run NETUPL
16Planning File
- A Planning File entry exists for each material
- Keeps track of changes that would require
material to be planned under NETCH or NETPL
options - MRP Planning process looks at planning file
entries for each material to see if it should be
planned
17Planning File
Low-level Code
NETCH Indicator
NETPL Indicator
18Planning Run Options
Planning Run Type NETCH NETPL NETUPL
Create Purchase Req 1 Purchase
Requisitions 2 Purchase Requisitions in
Opening Period 3 Planned Orders
Defined by Schedule Margin Key Usu. does not
impact consumption-based planning
19Planning Run Options
Create MRP List 1 Yes 2 Depending on
Exception Messages 3 No
Planning mode Determines how system deals
with previous plans (planned order, purchase
requisitions)
Scheduling Determines level of detail in
schedule calculation for production orders
Display results before they are saved Lets
planner make changes before the results are
saved
20Planning Run Options
- With consumption-based planning in practice
- You would not run MRP for a single material, but
do it as part of a group (MRP Area based on
storage location) - You would have it scheduled to run automatically
- You would have it either
- Create purchase requisitions automatically
- Create schedule lines
21Net Requirements Calculation
How does safety stock figure into this process?
22Exercise Material Master Data
MRP Type VB sets consumption-based
planning Reorder point Lot size FX is fixed
lot size Fixed lot size Quantity in an order
23Exercise Material Master Data
Plnd delivery time Vendor part of lead
time SchedMargin key Sets opening period,
among other things Safety stock Desired
stock level when replenishment order arrives
How does it work in SAP R/3?
24Exercise Stock/Requirements List
Stock/Requirements List Your one-stop
shopping location for all things material
25Exercise MRP Planning Run
MRP control parameters Planning run
parameters discussed previously
26Exercise MRP Planning Run
Planning run results displayed Purchase
requisition created
27Exercise Purchase Requisition
Can easily create purchase order from S/List
28Exercise Purchase Order
Purchase order screen is where the requisition is
converted to a purchase order Vendors
selected Price determined
29Exercise Receive Purchase Order
Goods Receipt Screen In practice, could just
be a bar-code scan Links receipt to purchase
order Tell SAP R/3 system where goods have
been stored
30Exercise Goods Issue
Goods Issue Screen When goods are issued,
something has to absorb costs (project,
production order, cost center) In this
case, we will charge costs to the warehouse
cost center (P020) What is the downside to
charging to a cost center?