Title: GEO TEXTILE: PERSPECTIVE FROM THE RAILWAY SECTOR
1GEO TEXTILE PERSPECTIVE FROM THE RAILWAY SECTOR
- A K Shrivastava. Executive Director Railway Board
- Rajesh Agarwal Geo-technical Engineering
Directorate RDSO - Presentation on 19.11.2010 at New Delhi
2Introduction
- Geo textile / Geo synthetics a Polymer based
product of Polypropylene, Polyester, PVC,
Polyamide, Polyethylene - Various types of Geo synthetics
- Geo textiles
- Geo grids
- Geo nets
- Geo cell
- Geo membranes
- Geo composites
- Prefabricated Vertical Drains (Band Drains)
3Functions of Geosynthetics
- Geo-synthetics improve mechanical and hydraulic
behaviour of formations - Basic functions of geo-synthetics
- Separation
- Filtration
- Drainage
- Reinforcement
- Barrier
- Basal Layer
4RAILWAY TRACK FORMATION
- Railway Track is porous Road
- Varying formation soil across country v/s need of
uniform track formation response. - Cumbersome and costly to transport specified soil
material at all places. - Specifications of formation, Ballast Blanket
materials are different from highway - Geo-synthetic can be an economical aid in
improving train load carrying capability. - Geo-synthetic works as separation barrier,
prevent rutting, ballast puncturing, improve
soil bearing capacity, distribute load better
5-
-
- Steep Slope Construction ( Non Railway
Loading) - Embankment Slip repairs
- Construction of high banks on soft soil
- Erosion control of slope
- Protection against rock falls
Application In Railway (General)
6 Application In Railway (Specific to railway loading)
- Track Bed Design
- Reinforced Earth Embankment
- Formation Rehabilitation
7Application In RailwayNew Constructions
- Dedicated Freight Corridors
- High Speed Corridors.
- Heavy axle loads / high speed railway track
require stable track formations. - Geo-synthetics can help to avoid repeated
maintenance and provide stable railway formation - Need to be designed as per site boundary
condition -
8 Application In Railway Open-line / Revenue line)
- IR is upgrading infrastructure to meet future
demand of higher axle load traffic. - About 700 km track is on weak formation
- cause of ballast penetration, higher fuel
consumption, passenger discomfort, extra
maintenance cost to track and rolling stock, - Rehabilitation / strengthening of such track can
help to eliminate speed restrictions
9Use of Synthetic Geogrids for Erosion Control of
Natural Existing Slopes
10Construction of RE Embankment
11Typical Cross Section of Embankment with
Prefabricated Vertical Band Drains
Sand Blanket
Initial Embankment
Band drains
Soft Clay Layer
Firm Soil
11
12Band drains installed above initial embankment
12
13GEOSYNTHETICS APPLICATION IN RAILWAY FORMATION
USES OF GEO-GRID
14GEOSYNTHETICS APPLICATION IN RAILWAY FORMATION
15PROJECT JAMMU-UDHAMPUR RAIL LINK.
- At km 54/043 near bridge no 162 in Udhampur
yard, embankment constructed with 35 m height . - Due to space constraint and close proximity of
irrigation canal and Tawi river at the bottom of
hill, not possible to provide designed slope of
2.5H 1V. - RE slope was constructed with Uniaxial Geogrid
of slope of 1.5 H 1V.
16Why do the Industry should develop customized geo synthetics for railway track formation application?
- Railway Loading are different
- Cyclic Vibrations Effects
- Traction (mainly Electrical)
- Seismic Effects when train is running
- Impact loading
- Maintenance of track should not be infringed by
geo-synthetics - Rehabilitation methods after completion life
cycle of geo-synthetics
17FORMATION REHABILITATION
- Work is to be done on running traffic condition
- Methods available for formation rehabilitation
such as - With aluminium alloy girder, Track dismantling
method, With manually operated portals, With c.
c. crib rail clusters (SE Railway Method), With
rail clusters (Eastern Railway Method), Lifting
of track with deep screening, Fully mechanized
methods. - Above methods are tedious in operation,
alternative method need to be explored. - Railway is interested in develop cost effective
easy to lay geo-synthetics.
18- HISTORY OF GEO-SYNTHETICS TRIED IN IR
- First time Geo-textiles were tried in Sothern
Railway (Madras - Gudur section, RDSOs report
no.C-261, July, 83) for prevention of Mud pumping
under ballast. - Geotextile were tried over 12 no. of different
sites all over Indian Railways in 80s and a
compilation report State of the Art Use of
Geotextile in Railways, Nov. 89 was prepared by
RDSO giving recommended specification of
geo-textile for track formation. - Trials of geo-jute along with blanket layer have
been done in Eastern Railway but not added
strength to blanket layer. Geo-jute can improve
only drainage properties. - Geo-grid was tried in Cuttack Paradeep section
for track construction over soft soil and design
of geo-grid reinforced embankment, retaining wall
and on bridge approach in Jammu-Udhampur section,
N .Rly (RDSO Report no. GE-13 14, May.1997.
19Geo-grid in IR
- Biaxial geogrid has been used in South Central
Railway, Northern Railway (Polypropylene
strength 30 kN/m with aperture size of 61mm x
61mm) for formation rehabilitation. - Field observations on SCR NR indicate
improvement in overall track performance after
the application of geogrid.
20Geo-grid Geotextile on IR
- NF Railway has tried use of Geo-grid (Polyester
based knitted coated with strength of 40 kN/m
aperture size of 25mmx25mm) in combination of
geo-textile and sand layer for formation
rehabilitation. The performance report of the
trial section is satisfactory. - For low density routes, geotextile along with
sand layer and brick soling has been used in
Sitamarhi Darbangha project, ECR.
21CURRENT PROCETS WITH GEO- SYNTHETICS
- Issues involved
- Aperture size of Bi-axial geogrid
- Junction strength
- Material type
22WORLD RAILWAY PRACTICE ON USE OF GEO-SYNTHETICS
- Geo-synthetics being used on many world
railways. - American Railways
- Use of geo-synthetics is on experimental basis
and specific to the nature of problem.
Specification of geo-synthetics is in draft
stage. - Australian Railways
- specify use of geotextile and Geogrid for
reconditioning/ rehabilitation of existing track
(Draft guideline). - UIC European Railways
- UIC consist of different railways. Their loading
conditions are different for different railways
and based on the soil type. It is recommendatory
in nature
23CURRENT PROCETS of GEO- SYNTHETICS
- Railway Budget Speech (2010-11) lay emphasis on
use of Jute-geo-textile is to enhanced for
formation rehabilitation under track.(Rehabilitati
on) - Project with IIT/Kharagpur for improving tensile
strength of jute-geotextile with synthetic
polymers - Project with IIT/Delhi to study behavior of
different Geo-synthetics to be used in Railway
Formationsvalidation through Lab model, FEM
model site measurements
24Recent Documentation on Geo-synthetics in IR
- Draft Guidelines for use of Geo-synthetics on
Indian Railways has been prepared by RDSO
provisional specifications of various
geosynthetics items based on relevant literature
survey - Extended field trials on geogrid are being done
on IR to validate assess the specifications of
geogrid.
25FOR INDUSTRY
- Geo-synthetics can find its use in railway
application for - track bed stabilization,
- track drainage, erosion control, interface
protection, construction over soft soil, - steep slope construction, mud pumping, etc.
- There is need to develop cost effective easy to
lay geo-synthetics for application in
construction of new formations rehabilitation
of existing formations for running of heavy axle
loads and high speed trains. - IR look forward active participation of industry
in this sector.
26THANKS