NORM MANAGEMENT IN THE OILFIELD - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

NORM MANAGEMENT IN THE OILFIELD

Description:

We have solutions for your NORM problems N We have solutions for your NORM problems S O L U T I O N S R Geri Cooley, MS, REM, CSP Radiation Safety Officer – PowerPoint PPT presentation

Number of Views:493
Avg rating:3.0/5.0
Slides: 16
Provided by: Presentati59
Category:

less

Transcript and Presenter's Notes

Title: NORM MANAGEMENT IN THE OILFIELD


1
NORM MANAGEMENT IN THE OILFIELD
We have solutions for your NORM problems
N
We have solutions for your NORM problems
S
O
L
U
T
I
O
N
S
R
  • Geri Cooley, MS, REM, CSP
  • Radiation Safety Officer

M
PERMIAN BASIN STEPS NETWORK MAY 11, 2010
2
WHY DO COMPANIES DECON EQUIPMENT?
  • Avoid Pollution
  • Maximize Storage Capability
  • Comply With Regulations
  • Protect Workers
  • Property Transfers
  • Continue Operations

3
TEXAS AGENCIES
  • Railroad Commission of Texas
  • Disposal Only of Oil Gas NORM
  • Department of State Health Services
  • Possession, Handling, Worker Protection,
    Transportation EVERYTHING UP TO DISPOSAL
  • Department of Transportation
  • Transportation of Radioactive Material

4
LICENSEE CATEGORIES
  • General Licensee - Producers, operators,
    equipment yards, pipe yards, etc.
  • Specific Licensee - A company that applies to and
    is approved by the regulatory authority for a
    license to perform NORM work.
  • Is it Routine Maintenance or Decontamination?

5
NORM SPECIFIC LICENSEES IN TEXAS
  • Aecom Technical Services Inc
  • Alamo Environmental Inc
  • Almac LLC
  • Dunagin Transport Co
  • Enercon Services Inc
  • Etech Environmental Safety Solutions
  • Four Lane Inc
  • Lighthouse Environmental Services
  • Lotus LLC
  • Newpark Environmental Services LLC
  • NORM Decon Services LLC
  • Nuclear Sources Services Inc
  • Protechnics Environmental
  • PSC Industrial Outsourcing LP
  • Radiation Environmental Mgmt
  • SYMB Environmental LLC
  • United States Environmental SVCS
  • US Ecology Texas LP
  • USA Environment LP
  • Reciprocity Licensees
  • American Pollution Control Corp LA
  • Dade Moeller And Associates Inc MD
  • Dynamic Industries Inc LA
  • Energy Solutions LLC TN
  • Grand Isle Shipyard LA
  • Major Equipment Remediation Svcs LA
  • Rice Operating Company NM
  • Trussco Inc LA

6
HANDLING NORM
  • General Licensee Required to have a NORM
    Worker Protection Plan 25 TAC 289.202
  • Worker Protection Worker Training get trained!
  • NORM Awareness
  • NORM Worker
  • NORM Surveyor
  • Radiation Safety Officer (RSO)
  • Secure the location/equipment with notices signs

7
RRC MARKING RULE16 TAC RULE 4.605
  • All Operators/Producers in Texas MUST mark their
    NORM-Contaminated Equipment with the letters
    NORM
  • Clearly visible waterproof tag or marking with a
    legible waterproof paint or ink
  • Must be conspicuous to the worker (by the valve,
    man way, etc.)

8
SURVEY TECHNIQUES
  • Survey within 1 centimeter of the surface
  • Check the response of the meter every time you
    conduct a survey
  • Meters must be calibrated every 12 months
  • Record the results of the survey on a report form
    with a schematic of the site
  • Take Pictures

9
EQUIPMENT WASTE
  • Vessels/Pipe are Contaminated at 50 µR/hr
  • Determines if a specific licensee is required to
    decon the vessel
  • Waste/Soil is contaminated at 30 pCi/g of Ra226
    Ra228 or 150 pCi/g of the associated daughter
    products (Pb210)
  • Waste Characterization
  • Disposal

10
RADIATION UNITS
  • Roentgen Measures Exposure (R/hr)
  • Exposure Radiation that is emitted from an
    object
  • REM Measures Dose
  • Dose Radiation that contacts the body
  • RAD Measures Absorbed Dose
  • Absorbed Dose Radiation that enters the body
    and can cause damage

11
SHIPPING SAMPLES
  • DO NOT SHIP SAMPLES VIA THE U.S. POSTAL SYSTEM!
  • It is illegal to ship radioactive material USPS
  • Use a Private Carrier (FEDEX, UPS, DHL, etc)
  • Packages that measure over 50 µR/hr require
  • UN2910 must be written on the inside package
  • The outer package must not exceed 500 µR/hr

12
NORM TRANSPORT
  • Determine if the load is considered Radioactive
    per DOT 2 steps
  • Rule of Thumb Calculation - Gamma Spectroscopy
  • Ra226 Analysis / 2,700 pCi/g
  • Ra228 Analysis / 2,700 pCi/g
  • Th228 Analysis / 270 pCi/g
  • Total gt 100 Radioactive, lt 100
    Non-radioactive
  • If Radioactive, survey outer package gt 500 µR/hr
    then placard Radioactive and manifest with
    proper shipping name

13
AUTHORIZED DISPOSAL16 TAC RULE 4.614
  • Authorized by Rule
  • Disposal in plugged abandoned wells
  • Burial At the Same Site where the NORM was
    generated
  • Land farming At the Same Site where NORM was
    Generated
  • Disposal at a licensed facility
  • Injection If NOW Waste
  • Permit Required
  • Non-retrieved Flowlines/Pipelines
  • Commercial Surface Waste Management Facilities
  • Disposal into plugged abandoned wells
  • Injection into Enhanced Oil Recovery Injection
    Wells
  • Injection

14
NORM COMMERCIAL DISPOSAL FACILITIES
  • All Facilities use injection disposal methods
  • New Park Resources Winnie TX
  • Inject Into Domal Salt
  • MB Energy Liberty TX
  • Inject Into Domal Salt
  • Lotus LLC Andrews TX
  • Salt Cavern Disposal Into Bedded Salt

15
QUESTIONS?
We have solutions for your NORM problems
N
We have solutions for your NORM problems
S
O
L
U
T
I
O
N
S
R
  • Geri Cooley, MS, REM, CSP
  • Radiation Safety Officer

M
Office (432) 847-9698Fax (432)
355-4404gcooley_at_normsolutions.comwww.normsolutio
ns.com
Write a Comment
User Comments (0)
About PowerShow.com