Title: AMPS
1AMPS Aviation Mission Planning System Briefing to
DAFIF DWG
MAJ Shawn Powell APM AMPS 256-876-3238 (DSN
746) shawn.powell_at_peoavn.redstone.army.mil
Terry Wales AMPS Program Integrator 256-876-3239
(DSN 746) terry.wales_at_peoavn.redstone.army.mil
5-7 Oct 2004
2Purpose of Briefing
- Provide information on Army Aviation Mission
Planning System (AMPS) - Communicate need to thoroughly coordinate changes
in geospatial data used by DoD aircraft flight
management systems
3Agenda
- Overview
- System Description/Status
- Concept of Operations
- Acquisition Strategy
- Software Development Schedule
- Supported Platforms/Common Avionics Insertion
- Conclusion
4Aviation MissionPlanning System
Description
- Planning/battle synchronization tool, which
automates aviation mission planning tasks - Route generation
- Performance planning
- Communications Planning
- Terrain Analysis
- Data Transfer
- Mission Rehearsal
- Provides connectivity to Army Battle Command
System
Concept of Operations
Benefits / Capabilities
- Mission Planning - Disseminates mission and map
data from Brigade to Battalion and Company level - Flight Planning Weather, Performance Planning,
Weight and Balance - Data Loading Navigation, Communications, and
Weapons
5AMPS Hardware (current)
- MILTOPE TSC-750M
- CPU 1.3 GHz Pentium M (Intel Centrino
chipset) - Hard Drive 40 GB
- Display 13.3 Sunlight
- readable (1024x768)
- DRAM 1 GB
- Video RAM 64 MB
- OS Windows 2000
- Meets all AMPS ORD
- environmental and
- ruggedization requirements
- Fielding 3QTR CY03 through 3QTR CY04 in
conjunction with PFPS-Army 3.3 software - Manufactured by MILTOPE Corp., Hope Hull, AL
6AMPS System Density
16
93
17
5
9
4
13
69
2
12
0
8
9
3
30
7
5
4
13
7
24
8
10
8
6
10
13
13
4
8
13
20
3
D.C. - 3
27
23
16
15
87
68
18
12
5
3
8
11
42
Puerto Rico - 3 USVI - 1
8
15
96
20
32
9
4
Total Requirement 1149
7AMPS Battlefield Information Exchange
NGA products
AVTOC
MANEUVER BRIGADE
AMPS LNO
IMETS
CSSCS
ASAS
NGA products
X
AFATDS
FAADC2
MCS
AMPS LNO
I I
I
Tactical Internet
NGA products
8AMPS External Interfaces
Current
Joint
ACTD
ASAS (MIDB)
JMPS
CRD (XML) ATO, ACO (USMTF) SA (XML) MIDB
Queries COP Updates
ACES
Proposed
MCS
Air Force
IMETS
Joint Interfaces
Red Picture (USMTF)
Comms Data
Navy
TAIS
SA JCDB (USMTF)
Weather (USMTF)
SOCOM
Airspace (USMTF)
HF Tracker
AMPS
SA
MCS Light
SA (XML)
Falconview Route File
TUAV/SUAV/OAV
MOTS
Data Transfer Cartridge JVMF TACFIRE AFAPD
Flight Hazard Data (XML)
CRD (XML) SA (XML)
ASMIS
XML .doc file
Airspace (USMTF)
ADOCS
CAPES
AMDWS
9AMPS Program Strategy To Date
- Evolutionary Acquisition
- First baseline was CECOM C2D-developed software
- Initial fielding in 1994 to support OH-58D KW
- PM CHS Non-Developmental Item (NDI) hardware
- Legacy AMPS 4.3, 5.1.1, 5.2.1
- Fielded PFPS-A v 3.3.0 (Falconview) baseline (Sep
03) - To mitigate warfighting deficiencies identified
by then-BG Cody in TF Hawk, primarily Joint
operations interoperability - First platform supported was Lot 7 AH-64D LBA
- Army functionality extensions to Air Force
software (AMCOM SED) - Testing PFPS-A v3.3.0 Release 3 Now!
10AMPS Program Strategy--Future
- Near Term PFPS-Army 3.3.x (Falconview)
- Will field PFPS-A v3.3.0 release 3 in 1QFY05
- Will support all Army rotary-wing Mission Design
Series by Spring 2005 - Supports Army SW Block I and II
- Long Term JMPS
- Multi-service collaborative development under IPT
structure (vice JPO) - All services migration to common core planner
- First Army supported version JMPS 1.2.4 (Sep
2005) - JMPS 1.4 will support Army SW Block III (2008)
- Future Combat System support
11AMPS Software Migration
FY04
FY05
FY06
FY07
FY08
AMPS
KW CDS 2-4 AH-64A Mod LB SW V 6 CH-47D UH-60A/L
JPS-A
JMPS
PFPS-A
KW CDS 2-4 AH-64A Mod LB SW V 1-
6 CH-47D UH-60A/L
AMPSPFPS
PFPS-A
AMPSPFPS
UH-60A/L/Q (HH-60L) CH-47D AH-64A Mod LB SW V6
thru V10 KW CDS 2, 4 IIb, Blk 1CH-47D LB SW V 11
(UAV) CH-47F UH/HH-60M
AMPSPFPS
AMPSPFPS-A
UH-60A/L/Q (HH-60L) CH-47D AH-64A Mod LB SW
V6.1/6.01, 9 KW CDS 2, 4 IIb, Blk 1 LB SW V 10
UH-60A/L/Q (HH-60L)CH-47D AH-64A Mod LB SW V 6,
8 KW CDS 2, 4 IIb LB SW V 6.1/ 6.01, 9 KW CDS 4
Blk 1
UH-60A/LCH-47D AH-64A Mod LB SW V 6, 8 KW CDS 2,
4 IIb UH-60Q, HH-60L
UH-60A/LCH-47D AH-64A Mod LB SW V 7
PFPS/JMPS
12Map-Related Data LoadingRequirements
Digital map-equipped
Entity location data only
AH-64A Mod
AH-64D, Blk 2
AH-64D, Blk 3 (fielding 2008)
AH-64D, Blk 1
CH-47F (fielding 2007)
CH-47D (128D)
OH-58D KW, CDS4
OH-58D KW, CDS 2
HH/UH-60M (fielding 2008)
UH-60A/L/Q (128D)
Armed Recon Helicopter
Advanced Common Sensor
Approximately 2,900 aircraft
13Message
- Army Aviation fleet modernization programs
- Are being designed to accept NGA products to
support tactical operations - On board optimized run-time environments are
architecturally rigid - DoD aircraft flight management systems are
minimally three years from contract award to
fielding, preceded nominally by at least one year
of government requirements specification - Post-initial fielding upgrades are 18-24 months
in development - It is imperative that changes being evaluated to
foundation geospatial data be thoroughly
coordinated with supported Aviation platforms to - Include fleet-wide impacts as part of decision
criteria - Program required technology insertions and
funding for changes deemed necessary
14Questions
MAJ Shawn Powell APM AMPS 256-876-3238 (DSN
746) shawn.powell_at_peoavn.redstone.army.mil
Terry Wales AMPS Program Integrator 256-876-3239
(DSN 746) terry.wales_at_peoavn.redstone.army.mil