Soils - HDM Chapter 9 All pictures from HDM Ch 9 PowerPoint PPT Presentation

presentation player overlay
About This Presentation
Transcript and Presenter's Notes

Title: Soils - HDM Chapter 9 All pictures from HDM Ch 9


1
Soils - HDM Chapter 9All pictures from HDM Ch 9
2
Subsurface Sampling
  • Test Pit
  • Probe Hole (probeno samples does it hit an
    obstruction)
  • Auger
  • Split Spoon Sampling
  • Undisturbed Sampling

3
Subsurface Exploration
  • Split spoon sampling

4
Subsurface Exploration
  • Undisturbed sampling

5
Other
  • Rock Core Drilling
  • Observation well
  • Geophysical exploration
  • Cone penetrometer
  • Retractable plug sampling
  • Falling-weight deflectometer (soil strength under
    pavt)

6
Alignment from Geotechnical POV
  • Fill of 2-3 m
  • Spans irregularities
  • Free of drainage problems
  • Avoid skim fills
  • Cuts
  • Avoid skim cuts
  • Avoid groundwater
  • Avoid side hill cuts

7
Unsuitable Material
  • Peat, muck, topsoil, sod (organics)
  • Landfill, industrial waste
  • Sludge
  • Removed and replaced with suitable material

8
Soil Issues
  • Settlement
  • Slope Stability
  • Rock Cuts
  • Excavation Protection and Support
  • Design of Spoil Sites
  • Optional Borrow Areas
  • Geotextiles

9
Settlement
  • Reduce profile
  • Lightweight fill
  • Surcharge
  • Sand drains
  • Wick drains

10
Stability
Lower profile Stabilizing berm Benching Staged
Construction Retaining Wall Geofabrics
11
Rock Cuts
  • Wire Mesh
  • Rock buttress
  • Fence

12
Excavation Protection and Support
13
Spoil Sites
  • Burning of solid waste is prohibited
  • Design so that excess material (not marketable or
    recyclable) is used in the existing right-of-way

14
Optional Borrow Areas
  • Identify borrow areas within existing right-of-way

15
Geotextiles
  • Bedding/Separation/Drainage/Slope
    Protection/Stabilization
  • Class I (strongest) to Class III (least strong)
  • Woven and NonWoven

16
(No Transcript)
17
Externally Stabilized
  • Anchored Walls
  • Anchored to earth or bedrock
  • Deadman anchors
  • Grouted tiebacks
  • Soldier Pile and Lagging
  • Piles at set intervals
  • Lagging placed between piles
  • Sheeting
  • Driven to a certain depth
  • Usually steel

18
Soldier Pile and Lagging
19
Sheeting Wall
20
Internally Stabilized
  • Rely on reinforced mass of soil
  • Not appropriate if access to underground
    utilities is needed
  • Mechanically Stabilized Earth Systems (MSES)
  • Geosynthetic Reinforced Earth Systems (GRES)
  • Soil Nailing
  • Gravity and Cantilever Walls
  • CIP or Precast
  • Gabions
  • Mechanically Stabilized Segmental Block

21
Evergreen Wall
22
T-Wall
23
Foundations
  • Drilled Shaft
  • Driven Piles
  • Micropiles

24
Soil Maps
  • GIS accessible maps are at http//websoilsurvey.nr
    cs.usda.gov/app/
  • Hints
  • AOI (polygon double click to end)
  • Soil Data Explorer
  • Soil Properties and Qualities
  • Soil Qualities and Features
  • Hydrologic Soil Group
  • View Rating
  • Printable Version
Write a Comment
User Comments (0)
About PowerShow.com