Rigging - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

Rigging

Description:

Rigging Unit 5 A Hoists & cranes Industrial hoists & cranes Overhead hoists under-slung cranes top-running cranes jib cranes Overhead manual chain hoists Hand chain ... – PowerPoint PPT presentation

Number of Views:288
Avg rating:3.0/5.0
Slides: 28
Provided by: BobEhr
Category:

less

Transcript and Presenter's Notes

Title: Rigging


1
Rigging
  • Unit 5 A
  • Hoists cranes

2
Industrial hoists cranes
  • Overhead hoists
  • under-slung cranes
  • top-running cranes
  • jib cranes

3
Overhead manual chain hoists
  • Hand chain turns a pocket wheel
  • 1/2 to 60 ton capacity
  • suspended trolley

4
Overhead powered hoists
  • Electric or pneumatic powered
  • chain hoist or wire rope
  • reeving (wire rope)-passing a rope over the
    sheaves , gains mechanical advantage
  • single reeved-1 rope, block moves horizontally as
    the hook ??
  • double reeved1 rope, both ends attached to drum,
    load stays centered as hook ??, can use smaller
    rope, drum sheaves

5
Overhead hoists 2
  • Parts- the number of rope lengths between the
    drum the hook
  • More parts more mechanical advantage
  • operation-generally a push button control pendant
    with ?? and an emergency stop button
  • multi-speed control,
  • brake system
  • limit switch

6
(No Transcript)
7
(No Transcript)
8
Jib cranes or hoists
  • Can be wall mount or pedestal mount
  • fixed, partial rotation or full rotation
  • top braced, under-braced or cantilever
  • rotation type have bearings

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Safety 1
  • Only 1 operator per hoist
  • only 1 boss per hoist EXCEPT for STOP!!
  • Do not side pull a load, this is very
    dangerous-do vertical lifts only

13
Overload limit devices
  • Keep hook from going too far up
  • prevent damage to unit when exceeding lift
    capacity
  • are not a guarantee of safety

14
Bridge Cranes
  • A Bridge Crane system consists of three major
    components.
  • the Bridge Crane, which traverses across the
    runway
  • the hoist trolley, which traverses across the
    bridge and lifts up and down
  • the runway, which is tied to the building
    structure.

15
Website
  • http//www.dearborncrane.com/pdf/bridge_cranes/Cra
    ne20Description.pdf

16
(No Transcript)
17
Under-slung cranes
  • Hoist is suspended from 1 or more bridge beams
    fitted with end trucks
  • smaller lift capacity than top-running cranes
  • used where ceiling space is limited

18
Top running cranes
  • Cranes are mounted on top of support beams, run
    on rails
  • gantry cranes
  • semi-gantry cranes or half gantry cranes
  • operation-cab operated, pendant control, radio
    control
  • the crane operator is not the rigger!!!!

19
Top Running or Under Running?
  • Top Running vs. Under Running is primarily
    determined by two factors
  • Capacity - Although under running can be up to 25
    ton capacity, the practical limit is more like 15
    tons and the economic sweet spot is 1 to 7.5 ton
    range.

20
Top Running or Under Running?
  • Support Structure - Under running can be
    suspended directly from the overhead steel (for
    lighter cranes). Top running cranes will require
    a bracket off the building support steel (up to
    10 tons capacity) or independent columns for
    heavier capacities.

21
Top Running or Under Running?
  • The top running configuration is best used in
    cases where the end user has issues with
    headroom. The most space efficient configuration
    is the double girder, top running crane system.
    When headroom is not an issue a top or under
    running configuration can be used with either the
    double or single girder bridge crane.

22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
Inspection
  • Inspect service periodically
  • trained personnel
  • as required by OSHA
  • hooks, cable, drum, sheaves, contacts, gear
    boxes, limit switches, controls, brakes, lube

27
Hand signals
  • Communication between rigger crane operator
  • very important
  • only 1 rigger per job except for STOP
Write a Comment
User Comments (0)
About PowerShow.com