SAFE 543 Construction Safety Week One Chat Session Review of Syllabus Review of Case Studies Format for Preplanning Guide Chat Session Guidelines Case Study #1 – PowerPoint PPT presentation

Number of Views:175
Avg rating:3.0/5.0
Slides: 12
Provided by: hhsIupEdu
Category:

less

Transcript and Presenter's Notes

Title: SAFE 543 Construction Safety


1
SAFE 543 Construction Safety
  • Week One Chat Session
  • Review of Syllabus
  • Review of Case Studies
  • Format for Preplanning Guide
  • Chat Session Guidelines
  • Case Study 1

2
SAFE 543 Construction Safety
  • Textbooks
  • Hill, Daryl, C. Construction Safety Management
    and Engineering. American Society of Safety
    Engineers, Des Plaines, IL, 2004.
  • Code of Federal Regulations 29, Part 1926
    Construction Standards. U.S. Government Printing
    Office, Washington, DC. Current edition. OR the
    student must access and use 29 CFR standards
    online at the OSHA website.

3
SAFE 543 Construction Safety
  • Review of Syllabus
  • Course Organization - The six modules of SAFE 543
    Construction Safety have the following
    components
  • One real-world case study with four focusing on
    pre-planning
  • Notes and links to other sites to give you
    information necessary to complete objectives,
    assignments and case studies
  • Weekly readings from the text to supplement the
    course content
  • Weekly Live Classrooms to review material and
    discuss questions/issues
  • Assignments embedded within the notes to apply
    course content

4
SAFE 543 Construction Safety
  • Review of Case Studies
  • An overview of the case study and the
    construction job is found as a link on the course
    content home page in D2L.
  • Additional information on each module case study
    is found as a hyperlink within all modules after
    the module objectives. This introduction
    provides you an overview of the construction
    project which will be needed when completing each
    modules case study.
  • Be sure to follow the Preplanning Report Format
    for the case studies for Modules 2-6.

5
SAFE 543 Construction Safety
  • Preplanning Report Format
  • I. Introduction In this section of the report,
    the student should briefly describe the phase of
    construction for which the report was prepared,
    the purpose of the report and identify the scope
    of activities covered within this specific
    report.
  • II. Background Information and Possible
    Subcontractors Involved Here the student should
    list what kind of subcontractors may be
    performing the work during this phase of
    construction.  
  •  
  • III. Identify/Evaluate/Control Hazards In this
    section, the student should focus on the
    frequency and severity of the actual/potential
    hazards (risk assessment) and how this hazard
    will be evaluated, i.e. standards used to
    evaluate. The activities and hazards must be
    prioritized in descending order, i.e. number 1
    listed as the activity that presents the greatest
    risk. Provide citations for your hazard
    selections
  • NOTE Do not discuss all the possible hazards
    but focus on the two MAJOR hazards for each of
    two Major activities in a particular phase of the
    job and for this specific site. The hazards must
    be unique across all case studies. For example,
    do not cite transportation hazards for every
    phase of the construction project.
  • 1.Construction Phase - Activity (i.e. Site
    Preparation - Excavation)    
  • A. Actual/Potential Hazard Identify the hazard
      
  •  B. Evaluation Here the student should list the
    number of employees potentially exposed, describe
    the hazards' potential effects and discuss how
    this hazard will be evaluated (identify standards
    where appropriate).   
  • C. Controls The student should list the
    controls that they would recommend for this
    hazard. The controls must consider all three
    areas
  • Engineering controls
  • Administrative controls (Programs/Policies/Trainin
    g)
  • PPE

6
SAFE 543 Construction Safety
  • Example of Section Three
  • Construction Phase Activity Finishing Work
  • Actual/Potential Hazard Severe Injury/Fatality
    Resulting from Improper Use and Handling of Power
    Tools.
  • Evaluation
  • It is anticipated that workers will be using a
    variety of power tools to complete the finishing
    work for the site. Examples of work that will
    performed include installation of HVAC systems,
    electrical, drywall, etc. Examples of power
    tools include sanders, grinders, drills, etc.
  • Controls
  • Employers will be expected to comply with the
    1926.xxxx standard for power tools. Controls
    shall include selection of power tools that meet
    OSHA standards, inspections..BE SPECIFIC
  • Employers will be expected to comply with the
    1926.xxxx standard for power tools. Controls
    shall include selection of power tools that meet
    OSHA standards, inspections..BE SPECIFIC
  • Etc.
  • Resources
  • OSHA regulations 29 CFR 1926.21(b)(2) Safety
    Training and Education
  • OSHA regulations 29 CFR 1926.300 Tools Hand and
    Power General Requirements
  • OSHA regulations 29 CFR 1926.302 Power Operated
    Hand Tools
  • OSHA regulations 29 CFR 1926.303 Abrasive Wheels
    and Tools
  • OSHA regulations 29 CFR 1926.304 Woodworking
    Tools
  • OSHA regulations 29 CFR 1910.134 Respiratory
    Protection

7
SAFE 543 Construction Safety
  • Live Classroom
  • The first part of the Live Classroom will be an
    opportunity for me to review some of the major
    concepts covered in this weeks class. I will use
    PowerPoint slides to address most of this
    information.
  • Following this overview, there will be an
    opportunity for you to ask any questions
    regarding the Module content, assignments or case
    study.
  • At the end of each Live Classroom, archives will
    be posted.

8
SAFE 543 Construction Safety
  • Assignments
  • Please upload all assignments through D2L.
  • I will only grade one assignment submission. Do
    not send one through D2L, a different one through
    email, etc. The first one I come across will be
    the one I grade.
  • Make sure your NAME is on the word document for
    assignments and case studies.
  • I will be using the D2L email to respond to
    individual students.

9
SAFE 543 Construction Safety
  • Assignments
  • Plagiarism will not be tolerated and will result
    in a zero grade for the assignment or case
    study. Every semester I make changes so you can
    not take the work from previous students. I will
    also be using Turnitin software to evaluate
    plagiarism. Make sure when you use material from
    any source that it is referenced and cited in the
    text!

10
Case Study 1
  • For your first case study, you will need to
    develop a set of criteria for selecting
    sub-contractors based upon the following
    performance measures
  • Accident/Injury Performance Measures
  • Loss Measures pertaining to Workers Comp,
    Property, Auto, and Liability
  • Safety Program Measures

11
Case Study 1
  • For each measure, include the process an
    organization would be expected to follow in terns
    of data to be collected, how it would be
    analyzed, and decisions made.
Write a Comment
User Comments (0)
About PowerShow.com