STARTING 3-TAB SHINGLES - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

STARTING 3-TAB SHINGLES

Description:

Presentation 30: STARTING 3-TAB SHINGLES Underlayment Felt underlayment is installed on a roof deck before shingles are applied. Underlayment Drip Edge Metal drip ... – PowerPoint PPT presentation

Number of Views:106
Avg rating:3.0/5.0
Slides: 15
Provided by: flo163
Category:

less

Transcript and Presenter's Notes

Title: STARTING 3-TAB SHINGLES


1
Presentation 30
  • STARTING 3-TAB SHINGLES

2
(No Transcript)
3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
Conclusions
  • Underlayment is the first step in installing
    shingles.
  • Drip edge gives strength to the roof edge.
  • Starter course is a full shingle with the tabs
    cut off.
  • Self-sealing strip is close to roof edge.
  • Each course is started with ½ tab removed.
  • Waste pieces from the ½ tab cutoffs are used to
    complete the roof.
Write a Comment
User Comments (0)
About PowerShow.com