Title: MA.P.E./Cr 05
1MA.P.E./Cr 05 The Liquid Revolution
2DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 - Characteristics
- White Liquid Product
- Based on Antimony Trioxide
- Liquid suspension
- Two versions available
- MA.P.E./Cr 05 LV (Low Viscosity) for normal
use - MA.P.E./Cr 05 AF (Anti Freeze) for cold
environments (up to -15C)
3DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 - Advantages
- Reduced Costs, similar to Iron salts
- Very long lasting Cr(VI) reduction, 1 year
- Easy to use, dosing requires a pump only
- Low and stoichiometric dosage, no waste material
- Neutral pH (No ADR)
- Patented Technology, result of Mapei expertise
and RD
4DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 How does it work?
- Cr(VI) reduction with MA.P.E./Cr 05 can be
explained in four steps - Dosing MA.P.E./Cr 05
- Cement grinding
- Cement storage
- Cement hydration and Cr(VI) reduction.
5DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 How does it work?
- Step 1 Dosing MA.P.E./Cr 05
- It is recommended to dose directly on the clinker
conveyor - Indicative dosage 50 g / ppm Cr(VI) / ton cement.
6DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 How does it work?
- Step 2 Cement Grinding
- MA.P.E./Cr 05 must be ground with the cement in
order to break down the suspension and mix it
into the cement.
7DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 How does it work?
- Step 3 Cement Storage
- MA.P.E./Cr 05 does not suffer heat or humidity
it remains asleep inside the cement.
8DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 How does it work?
- Step 4 Cement Hydration and Cr(VI) reduction
- Once the cement is hydrated (pH rises gt 12,
Cr(VI) is released), MA.P.E./Cr 05 becomes
soluble and reduces Cr(VI).
9(No Transcript)
10DAM - Cement Grinding Aids Division
MA.P.E./Cr 05 - Costs
- Indicative price 2,50 / kg
- Example costs
-
Start Value Cr(VI) (ppm) End Value Cr(VI) (ppm) Dosage (g/ton) Cost (/ton)
10 0 500 1,250
10 1 450 1,125 (-10)
5 0 250 0,625
5 1 200 0,500 (-20)