Title: NEW CONSTRUCTION PROJECT LIFECYCLE
1GITA Seminar onNew Construction Project
Lifecycle
The FERC Staff Approach to GIS
Lonnie Lister, Chief Gas Branch 3 Office of
Energy Projects Federal Energy Regulatory
Commission Washington, DC
JW Marriott Houston, TX September 20, 2004
2What is FERC?What Does FERC Do?
- Regulates the interstate transmission of
natural gas, oil, and electricity, and the
siting, construction, and operation of natural
gas and hydropower projects.
3...and What Does FERC NOT Do?
- LDC regulation, electricity generation,
transmission or distribution facilities oil
pipeline facilities - Water Quality Certifications
- Pipeline safety or pipeline safety and
transportation on OCS - Easement compensation
4Pipelines Certificated 01/2002 thru 07/2004
Georgia Straits (96)
1. Algonquin (285) 2. Islander East (285) 3.
Iroquois (85) 4. Columbia (135,270)
5. CIG (282,92) 6. CIG (118) 7. TransColorado
(125) 8. WIC (116)
Northwest (224)
Northwest (162,113)
Iroquois(70)
WBI (80)
NFS/DTI (150)
1
Northwest (191)
2
ANR (220,107)
3
6
Cheyenne Plains (560)
8
TETCO(223)
4
Tuscarora (96)
TETCO(250)
5
7
Cove Point (445)
Kern River (886)
Greenbrier (600)
El Paso (140)
East Tennessee (510)
Kern River (282)
TETCO (197)
North Baja (500)
SCG Pipeline (190)
Transco (323)
El Paso (320)
Southern (330)
Discovery (150)
Calypso (832)
11.2 BCF/D Total 2,770 Miles
Tennessee (320)
Ocean Express (842)
544
43
36
34
33
35
39
A
42
17
27
7
Existing and Proposed North American LNG Terminals
28
13
B
40
19
8
21
C
32
30
15
26
18
1
31
D
38
10
3
5
41
6
12
14
23
9
24
16
22
As of July 2004
4
11
25
2
20
US Jurisdiction FERC US Coast Guard
29
37
6Major FERC Initiatives
(Involving GIS)
- E-Government (electronic filing)
- Pre-Filing Process
- Outreach
7The Pre-Filing Process
- To encourage the pipeline industry to engage in
early project-development involvement with the
public and agencies, as contemplated by the
National Environmental Policy Act (NEPA) and the
Council on Environmental Quality regulations
8Pre-Filing Requests
- Why Needed?
- Other Agencies On-Board?
- Stakeholders Identified?
- 3rd-Party Contractor Support
- Complete Application to be Filed
- Public Participation Plan
9FERC Staffs Role
- Written Acceptance PF Docket Established
- Flexible Process for Staff Involvement
- Scoping Notice/Meetings/Site Visits
- Review Draft Resource Reports
- Begin Preparation of NEPA Document
10Processing TimelinesTraditional vs. Pre-Filing
Develop Study Corridor
File At FERC
Prepare Resource Reports
Conduct Scoping
Draft EIS
Issue Order
Final EIS
Traditional
Develop Study Corridor
File At FERC
Prepare Resource Reports
Pre-Filing Accepted Begin Scoping
FERC Staff Reviews Draft Resource Reports
Prepare DEIS
Issue Order
Final EIS
NEPA Pre-Filing
Draft EIS
0 1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21
22 23 24
(months)
11The E-Filing Initiative
- Supports FERC compliance with the Government
Paperwork Elimination Act (GPEA) requiring
Federal agencies to provide for the option of - . . . electronic maintenance, submission or
disclosure of information, when practicable as a
substitute for paper. . .
12Filing Categories
- Public
- Non-Public/Privileged Information
- NIP (Non-Internet Public)
- CEII (Critical Energy Infrastructure Information)
13All GIS Data is CEII(Critical Energy
Infrastructure Information)
- Requires a Special Request to Obtain
- Not Subject to FOIA
- Requires a Need and Use Statement
- Requires a Non-Disclosure Agreement
- Subject to Approval by FERCs CEII Officer
14Guidelines for CD-ROM Filings
- General Requirements
- Acceptable/Preferred Formats
- Attribute data
- Accuracy Requirements
- Metadata
15GIS Filings at FERC
- Hi-Res Aerial Alignment Sheets/Photos
- Facility Locations Areas of Disturbance
- Required Environmental Resource Data
- Data Supporting Alternative Siting/Routing
Analyses
16OEPs Approach to GIS
- Webviewer (ArcIMS application)
- Working w/INGAA on Filing Specs
- Intent to Coordinate Specs w/DOT Requirements
- New Filing Regulations Likely
17What are the Benefits?
- For Industry
- Faster Processing of Pipeline Certificates
- Fewer Data Requests
- Cost Savings on Filings Updates
18What are the Benefits?
- For FERC
- Electronic Filing
- Multi-User Capability
- Faster Assessments of Complaints
-
19...and Down the Road?
- Paperless Filings (?)
- Mapped Resource Data
- Compliance Tracking
- Post-Certificate Filings
- Field Inspections
- Wireless Access (?)
20The views and opinions expressed in this
presentation are solely those of the author, and
do not necessarily represent the views of the
Commission or its individual members.