NEW CONSTRUCTION PROJECT LIFECYCLE - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

NEW CONSTRUCTION PROJECT LIFECYCLE

Description:

GITA Seminar on: New Construction Project Lifecycle The FERC Staff Approach to GIS Lonnie Lister, Chief Gas Branch 3 Office of Energy Projects Federal Energy ... – PowerPoint PPT presentation

Number of Views:264
Avg rating:3.0/5.0
Slides: 21
Provided by: Lalp
Category:

less

Transcript and Presenter's Notes

Title: NEW CONSTRUCTION PROJECT LIFECYCLE


1
GITA Seminar onNew Construction Project
Lifecycle
The FERC Staff Approach to GIS
Lonnie Lister, Chief Gas Branch 3 Office of
Energy Projects Federal Energy Regulatory
Commission Washington, DC
JW Marriott Houston, TX September 20, 2004
2
What is FERC?What Does FERC Do?
  • Regulates the interstate transmission of
    natural gas, oil, and electricity, and the
    siting, construction, and operation of natural
    gas and hydropower projects.

3
...and What Does FERC NOT Do?
  • LDC regulation, electricity generation,
    transmission or distribution facilities oil
    pipeline facilities
  • Water Quality Certifications
  • Pipeline safety or pipeline safety and
    transportation on OCS
  • Easement compensation

4
Pipelines Certificated 01/2002 thru 07/2004
Georgia Straits (96)
1. Algonquin (285) 2. Islander East (285) 3.
Iroquois (85) 4. Columbia (135,270)
5. CIG (282,92) 6. CIG (118) 7. TransColorado
(125) 8. WIC (116)
Northwest (224)
Northwest (162,113)
Iroquois(70)
WBI (80)
NFS/DTI (150)
1
Northwest (191)
2
ANR (220,107)
3
6
Cheyenne Plains (560)
8
TETCO(223)
4
Tuscarora (96)
TETCO(250)
5
7
Cove Point (445)
Kern River (886)
Greenbrier (600)
El Paso (140)
East Tennessee (510)
Kern River (282)
TETCO (197)
North Baja (500)
SCG Pipeline (190)
Transco (323)
El Paso (320)
Southern (330)
Discovery (150)
Calypso (832)
11.2 BCF/D Total 2,770 Miles
Tennessee (320)
Ocean Express (842)
5
44
43
36
34
33
35
39
A
42
17
27
7
Existing and Proposed North American LNG Terminals
28
13
B
40
19
8
21
C
32
30
15
26
18
1
31
D
38
10
3
5
41
6
12
14
23
9
24
16
22
As of July 2004
4
11
25
2
20
US Jurisdiction FERC US Coast Guard
29
37
6
Major FERC Initiatives
(Involving GIS)
  • E-Government (electronic filing)
  • Pre-Filing Process
  • Outreach

7
The Pre-Filing Process
  • To encourage the pipeline industry to engage in
    early project-development involvement with the
    public and agencies, as contemplated by the
    National Environmental Policy Act (NEPA) and the
    Council on Environmental Quality regulations

8
Pre-Filing Requests
  • Why Needed?
  • Other Agencies On-Board?
  • Stakeholders Identified?
  • 3rd-Party Contractor Support
  • Complete Application to be Filed
  • Public Participation Plan

9
FERC Staffs Role
  • Written Acceptance PF Docket Established
  • Flexible Process for Staff Involvement
  • Scoping Notice/Meetings/Site Visits
  • Review Draft Resource Reports
  • Begin Preparation of NEPA Document

10
Processing TimelinesTraditional vs. Pre-Filing
Develop Study Corridor
File At FERC
Prepare Resource Reports
Conduct Scoping
Draft EIS
Issue Order
Final EIS
Traditional
Develop Study Corridor
File At FERC
Prepare Resource Reports
Pre-Filing Accepted Begin Scoping
FERC Staff Reviews Draft Resource Reports
Prepare DEIS
Issue Order
Final EIS
NEPA Pre-Filing
Draft EIS
0 1 2 3 4 5 6 7 8 9 10 11
12 13 14 15 16 17 18 19 20 21
22 23 24
(months)
11
The E-Filing Initiative
  • Supports FERC compliance with the Government
    Paperwork Elimination Act (GPEA) requiring
    Federal agencies to provide for the option of
  • . . . electronic maintenance, submission or
    disclosure of information, when practicable as a
    substitute for paper. . .

12
Filing Categories
  • Public
  • Non-Public/Privileged Information
  • NIP (Non-Internet Public)
  • CEII (Critical Energy Infrastructure Information)

13
All GIS Data is CEII(Critical Energy
Infrastructure Information)
  • Requires a Special Request to Obtain
  • Not Subject to FOIA
  • Requires a Need and Use Statement
  • Requires a Non-Disclosure Agreement
  • Subject to Approval by FERCs CEII Officer

14
Guidelines for CD-ROM Filings
  • General Requirements
  • Acceptable/Preferred Formats
  • Attribute data
  • Accuracy Requirements
  • Metadata

15
GIS Filings at FERC
  • Hi-Res Aerial Alignment Sheets/Photos
  • Facility Locations Areas of Disturbance
  • Required Environmental Resource Data
  • Data Supporting Alternative Siting/Routing
    Analyses

16
OEPs Approach to GIS
  • Webviewer (ArcIMS application)
  • Working w/INGAA on Filing Specs
  • Intent to Coordinate Specs w/DOT Requirements
  • New Filing Regulations Likely

17
What are the Benefits?
  • For Industry
  • Faster Processing of Pipeline Certificates
  • Fewer Data Requests
  • Cost Savings on Filings Updates

18
What are the Benefits?
  • For FERC
  • Electronic Filing
  • Multi-User Capability
  • Faster Assessments of Complaints

19
...and Down the Road?
  • Paperless Filings (?)
  • Mapped Resource Data
  • Compliance Tracking
  • Post-Certificate Filings
  • Field Inspections
  • Wireless Access (?)

20
The views and opinions expressed in this
presentation are solely those of the author, and
do not necessarily represent the views of the
Commission or its individual members.
Write a Comment
User Comments (0)
About PowerShow.com