New techniques and procedures - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

New techniques and procedures

Description:

New techniques and procedures CAAC s Progress on PBN BACK GROUND Operation at high elevation airports Traffic Increase Operation At High Elevation Airports General ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 21
Provided by: YangHo
Category:

less

Transcript and Presenter's Notes

Title: New techniques and procedures


1

New techniques and procedures CAACs
Progress on PBN
2
  • BACK GROUND
  • Operation at high elevation airports
  • Traffic Increase

3
Operation At High Elevation Airports
  • General High Elevation Airport
  • At or above 1500 m (4922 ft) but below 2438 m
    (8000 ft).
  • In service12, On construction3
  • Very High Elevation Airport
  • At or above 2438 m (8000 ft).
  • In service6, On construction3
  • Bangda(4334m/14220ft)
  • More coming

4
RNP/RNAV
  • WGS-84 is approved to be used in CAAC.
  • RNAV
  • RNP

5
RNAV/RNP-En route
  • Remote/Oceanic
  • RNP10 South China Sea
  • RNP4 FANS route ,Parallel route
  • L888 Y1 Y2 Y3
  • Busy Area
  • RNAV 2
  • RNP 2 

6
(No Transcript)
7
RNAV - Terminal
  • RNAV1/RNAV2
  • AC 91-09 June. 2008
  • Operation Guidance for RNAV1 RNA2 in
    Terminal and Enroute Flight
  • RNAV SID/STAR 2007-2008
  • 10 main international airports RNAV1
  • Beijing, Shanghai(2), Guangzhou, Shenzhen,
    Wuhan, Shenyang, Xian, Chengdu,
  • Wulumuqi

8
RNP - Approach
  • AC 91-02 Feb.23 2006
  • Airworthiness and Operation requirement for
    special SAAAR RNP procedure
  • Equivalent to FAA Notice 8000.326
  • AC 91-05 Dec.27 2006
  • Airworthiness and Operation requirement for
    public SAAAR RNP procedure
  • Equivalent to FAA AC90-101
  • CAAC IB Jan.11, 2007
  • Construction criteria for RNP/AR procedure
  • Equivalent to FAA Order 8260.52

9
RNP projects
  • Lhasa,Boeing757,2004-2006
  • Linzhi
  • Air China,B757-200,July 2006
  • China Eastern, B737-700,May 2007
  • Jiuzhai
  • Air China,B757-200, Feb.2006
  • Airbus program
  • More airports/airlines

10
RNP AR projects
  • Lhasa, Night Flight, RNP0.3 June 2008
  • LiJiang
  • China Eastern, Boeing, B737-700,May 2008
  • 100 RNP0.3 operation (6 Boeing operators
    and 4 Airbus operators)
  • YanJi, Bangda,HuangShan,XiNing Airport
  • Develop common application package for operators

11
P
12
Linzhi RNP
  • Location Tibet,Valley of Yuluzhangbu River
  • Elevation2949m/9675ft
  • Terrain Narrow and steep valley
  • High mountains of 4000m around the airport
  • Complicated weather
  • The most challenged airport in China
  • 10,000,000 USD for ground Navaids

13
Linzhi
14
(No Transcript)
15
(No Transcript)
16
PBN Roadmap
  • According to ICAOs request
  • Guidance for fully implementing PBN
  • Time Frame2009-2016-2025
  • Cooperation with Boeing
  • Expected to be released in March 2009

17
Advise Circular
  • AC 91-06 Feb. 2008
  • Operation Guidance for RNAV5
  • ICAO Template Recommend for Contract States

18
RNAV(GNSS) project
  • Test flight in CAAC flight college
  • Baro-VNAV combined
  • Drafting AC on RNP APCH

19
RNP equipage Retrofit
  • Project supported by CAAC
  • Focused on B737NG and A320 family
  • GPS Retrofit is also a part

20
29th,May, Verification flight
  • THANK YOU
Write a Comment
User Comments (0)
About PowerShow.com